Technical summary
Moreno, Pernambuco is FB Bombas territory: FBEI, FBCN series for local industry, vertically integrated manufacturing in Cabreúva-SP (2123 km), API 676/ASME B73.1 compliance and Petrobras CRCC. Typical lead time: 96h to 7 days.


Gear pumps (internal & external) and centrifugal pumps manufactured in Cabreúva/SP. Serving Moreno and region — factory 2112km away. Technical response within 24h.
Gear pumps (internal & external) and centrifugal pumps manufactured in Cabreúva/SP. Serving Moreno and region — factory 2112km away. Technical response within 24h.

Years
Compliant
Tested
Direct answer for industrial projects — recommended series, standards compliance and logistics.
Moreno, Pernambuco is FB Bombas territory: FBEI, FBCN series for local industry, vertically integrated manufacturing in Cabreúva-SP (2123 km), API 676/ASME B73.1 compliance and Petrobras CRCC. Typical lead time: 96h to 7 days.
Based in Cabreúva-SP at 2123 km via BR-101 (via AL), FB Bombas delivers to Moreno industrial pumps manufactured in-house since 1944 plus continuous technical support. Logistically, the city connects to Cabreúva-SP via BR-101 (via AL), complemented by alternatives BR-101, BR-232 and BR-116 — a network that supports technical service within tight operational windows. Typical fluids in Moreno's industrial operations include óleos industriais and água industrial — a vector that determines whether the correct specification is the FBE/FBEI (gear) or FBCN/FBOT (centrifugal / thermal oil) series. FB Bombas serves Moreno with a complete aftermarket package for FB pumps — factory spare parts, preventive maintenance, vibration troubleshooting (ISO 10816 analysis), ISO 21940 G2.5 balancing and replacement of a normalized pump on the existing ASME B73.1 baseplate. FB Bombas maintains in Moreno the technical portfolio of CRCC Petrobras + API 676 + ASME B73.1 (API 610 on engineered-to-order projects) — a regulatory base that spans refining, petrochemicals, mining, sanitation, pulp and paper, sugar-ethanol and steel. Through 20-km proximity to the port cluster of Cabo De Santo Agostinho, Moreno inherits technical-qualification standards (CRCC, sector audits and customer-side homologation standards) and approved suppliers — a favorable context for normalized FB solutions. Moreno, Pernambuco is territory where FB Bombas operates as a Brazilian industrial-pump manufacturer with 82 years of continuous operation. For the local industry industrial profile dominating the region, we offer the FBE, FBCN, FBOT and FBEI series with CRCC Petrobras qualification, API 676 compliance and ASME B73.1 normalization (API 610 engineered-to-order projects) — basis for retrofit in plants with global manufacturers already installed.
Lead time for critical parts to Moreno is typically 96h to 7 days — a function of distance (2123 km) and the available road modal. In Moreno, transferência geral and utilidades form the typical-use portfolio — guiding series selection, sealing configuration and internal coating according to fluid abrasiveness or aggressiveness. For óleos industriais and água industrial, the materials recommendation in Moreno converges on AISI 316 or for chloride resistance in marine atmosphere, a starting point adjustable based on field-observed corrosion. Moreno typically calls for FBEI and FBCN — an initial recommendation based on local productFit, dominant industrial cluster and identified fluid profile; final technical approval is refined by application engineering.
In Moreno, low industrial density — typically standalone projects, without regional cumulative volume — a characteristic that sizes FB's commercial strategy: application-engineering coverage, visit cadence and depth of consignment stock. The economic fabric of Moreno is diversified: services lead, but industry holds 21.8% of municipal value added (IBGE, 2021), over a 2023 GDP of R$ 1.1 billion — real demand for both process pumps and building utilities and sanitation. In Moreno, portuario-cluster seasonality manifests as continuous flow with seasonality tied to agricultural harvests (bulk) and fuel supply — information FB Bombas uses to schedule plant capacity and ready-to-ship inventory. Working with óleos industriais and água industrial in Moreno demands attention to viscosity at operating temperature, residual abrasiveness and chemical compatibility — criteria FB engineering applies on every project. In Moreno, series FBEI for transferência geral and series FBCN for utilidades — a combination that covers the typical local industrial demand. Due to proximity to the portuario cluster, Moreno shares a technical agenda with bunker (BPF fuel oil), marine cooling water and liquid-bulk discharge — a direct path to series and materials selection.
Cabreúva-SP → Moreno via BR-101 (via AL) (2123 km): a corridor with regular FB freight history, supporting indivisible loads and sets with escort when the gauge demands. For Moreno, 72h to 7 days, depending on modal and dry season is the standard contractual transit window — compressible via emergency air modal for critical parts, on specific demand. For Moreno, FB dispatch is preceded by: hydrostatic test at 1.5× design pressure, performance run with curve points, G2.5 dynamic balancing and Data Book closure — all traceable by serial number.
For projects in Moreno, talk to FB engineering: technical analysis of the duty point, series and materials recommendation, hydraulic-test scope and Data Book. Direct service.
Talk to engineeringFor over 82 years, we have manufactured industrial pumps in Cabreúva-SP. From north to south, we serve the country's main industrial hubs with gear (FBE/FBEI) and centrifugal (FBCN/FBOT) pumps — engineered, machined and assembled in our own manufacturing facility.
Our engineering team sizes each pump for the customer's actual application, with bench testing before shipping. This technical rigor — combined with direct support from our team — is what has sustained the trust of groups like Petrobras, Vale and CSN for generations.

What changes when the pump comes straight from the manufacturer: engineering, stock and logistics under one roof in Cabreúva-SP.
Technical support across all 27 Brazilian states, from inland regions to major industrial capitals.
Nationwide deliveries through partner carrier network with optimized lead times.
Technical team available for sizing, project work and after-sales support across any region.
Original spare parts for the FBE, FBEI, FBCN and FBOT series stocked at our own factory, ready to ship.
Own factory in Cabreúva/SP with full production capability, serving Moreno and all of Brazil

Engineering, CNC machining and assembly — all integrated in our Cabreúva/SP factory.

We size and build complete systems, ready for installation at your industrial plant.

We keep original parts in stock for all series, ensuring continuity of your operation.

Production line with centrifugal and gear pumps assembled and tested in our manufacturing plant.
FB Bombas serves Moreno and the entire Pernambuco region with gear pumps (internal & external) and centrifugal pumps for your industrial application. Request a quote and receive a personalized proposal.
Request QuoteFour catalog series, fire-fighting systems and engineered-to-order — in-house manufacturing and hydrostatic testing on 100% of pumps
Our technical team is ready to develop the ideal solution for your application
Contact Us
Our manufacturing plant in Cabreúva-SP integrates engineering, CNC machining and assembly under one roof. Every pump is validated through bench testing before reaching the customer — ensuring it ships ready for real application.
Present in the largest industrial projects in Brazil and Latin America









See specific solutions for Moreno
Brazilian sectors for which FB Bombas sizes equipment — complete technical guides per application.
FB Bombas serves Moreno and neighboring municipalities with the same technical team — optimized visits and supply in joint campaigns.
Send flow, differential pressure, working temperature and fluid viscosity: with these four data points FB engineering calculates the right model, also validating available NPSH, operating regime and material compatibility. The service is free of charge for customers in Moreno.
Coverage against manufacturing defects accompanies the supply of FB pumps — the full terms appear in the commercial proposal. It holds as long as installation, operation and maintenance follow what the manual specifies and the sizing performed by engineering. Our technical team clarifies the specific conditions of your project in Moreno.
They can. FB Bombas' accreditation in FINAME (the BNDES Special Industrial Financing Agency), as a Brazilian manufacturer, makes equipment destined for Moreno eligible for the BNDES Finame lines — Industrial Working Capital, Modernization and Capital Goods —, which offer preferential conditions for national industry. The product's FINAME code is provided by the commercial team on the technical proposal, ready to compose the customer's financial plan.
Limits vary by series. FBE and FBEI: up to 350°C, provided a heating jacket and special sealing are used. FBOT: up to 350°C in thermal oil circuits. FBCN: up to 260°C, with materials and sealing suited to the service. Well-sized sealing and materials are a condition for safe operation in these ranges.
It depends on the configuration: standard-arrangement pumps have shorter lead times, while special constructions follow the schedule stated in the technical proposal. The deciding factor is the combination of series, materials and stock availability — and transport to Moreno goes through our regular road operator.
Send the application data through the website form, WhatsApp +55 11 97287-4837 or email comercial@fbbombas.com.br: fluid (name and viscosity at operating temperature), target flow in m³/h, discharge head in m, available NPSH, operating temperature and regime — continuous or intermittent. After reviewing the briefing, application engineering returns a preliminary technical proposal, characteristic curve, suggested materials and delivery lead time for your project in Moreno.
For critical parts (mechanical seal, impeller, shaft, wear ring, bearings) during a plant shutdown in Moreno, FB Bombas runs an emergency flow: pre-invoicing, priority dispatch and alternative modal (express road or air transport depending on distance and criticality). Typical lead time varies by region, with a window negotiable case by case. For customers with an installed base and scheduled PM, part of the stock can be kept on consignment at the plant.
Yes. On the factory bench in Cabreúva/SP the FAT (Factory Acceptance Test) is carried out: hydraulic test with characteristic-curve measurement (Q × H), hydraulic efficiency, NPSHr and ISO 10816 vibration — witnessed by customer inspection when specified. The SAT (Site Acceptance Test) on Moreno projects counts on application engineering during commissioning, including startup checklist, laser alignment and recording of the baseline vibration signature.
Service to Moreno is handled directly by the FB Bombas team at the Cabreúva/SP factory. That means direct contact with application engineering for sizing, a complete technical quotation within 3-5 business days and original spare parts supplied at factory-direct pricing. On-site technical visits to Moreno are planned based on project criticality.
The advantages are concrete: faster delivery because nothing depends on imports; FB engineering providing direct technical support; spares secured by in-house parts manufacturing; local-currency pricing, free from exchange rate exposure; and physical presence on projects in Moreno and surrounding areas. All from a company manufacturing in Brazil since 1944.
Fill out the form and our technical team will contact you to size the ideal pump — gear (FBE/FBEI) or centrifugal (FBCN/FBOT).