Skip to main content

Custom engineering Pump Retrofit and Modernization

A new FB pump for an existing installation, with duty-point and interface assessment.

The starting point is your requirement.

A new FB pump for an existing installation, with duty-point and interface assessment.

In this solution, retrofit means supplying a new FB pump for the current needs of an existing installation. The work starts with equipment identification, an interface survey and operating conditions. Retaining the baseplate and piping depends on dimensional verification.

The scope is the supply of a new FB pump. It does not involve rebuilding another manufacturer’s casing or manufacturing their spare parts. Interchangeability must be confirmed by the project.

FBCN series pump, shown as a reference for the series.
FBCN series pump, shown as a reference for the series.Reference configuration. Supply is defined in the project.

What to consider for this solution.

These points guide the engineering discussion. The proposal defines the configuration and the scope of supply.

Installed equipment

Nameplate photos, a dimensional drawing and pump identification help establish the starting point.

Current requirements

Explain whether flow, fluid, temperature or another condition has changed from the original design.

Installation adaptation

Nozzles, shaft height, bolt pattern, baseplate and drive must be compared before confirming a replacement.

Tell us about your application.

Start with the information you already have. You can enquire without every technical detail; the team will guide the next steps.

If available, include

  • Photos of the nameplate and installed assembly.
  • Dimensions, connections and available space.
  • Current conditions and the intended result of replacement.

Before you request a project.

Answers to help prepare your enquiry and understand the supply.

What should I consider when enquiring about pump retrofit and modernization?

In this solution, retrofit means supplying a new FB pump for the current needs of an existing installation. The work starts with equipment identification, an interface survey and operating conditions. Retaining the baseplate and piping depends on dimensional verification.

What information helps the assessment?

Photos of the nameplate and installed assembly. Dimensions, connections and available space. Current conditions and the intended result of replacement.

What needs confirmation in the proposal?

The scope is the supply of a new FB pump. It does not involve rebuilding another manufacturer’s casing or manufacturing their spare parts. Interchangeability must be confirmed by the project.

Can I enquire without all technical details?

Start with the information you already have. You can enquire without every technical detail; the team will guide the next steps.