Technical summary
Praia Grande, São Paulo is FB Bombas territory: FBE, FBCN series for turismo, vertically integrated manufacturing in Cabreúva-SP (107 km), API 676/ASME B73.1 compliance and Petrobras CRCC. Typical lead time: 24-48h.


Gear pumps (internal & external) and centrifugal pumps manufactured in Cabreúva/SP. Serving Praia Grande and region — factory 108km away. Technical response within 24h.
Gear pumps (internal & external) and centrifugal pumps manufactured in Cabreúva/SP. Serving Praia Grande and region — factory 108km away. Technical response within 24h.

Years
Compliant
Tested
Direct answer for industrial projects — recommended series, standards compliance and logistics.
Praia Grande, São Paulo is FB Bombas territory: FBE, FBCN series for turismo, vertically integrated manufacturing in Cabreúva-SP (107 km), API 676/ASME B73.1 compliance and Petrobras CRCC. Typical lead time: 24-48h.
In Praia Grande, São Paulo, FB Bombas serves turismo projects with the FBE, FBCN, FBOT and FBEI series — dedicated application engineering for sizing against the actual system curve, CRCC Petrobras certification and technical compliance with ASME B73.1 (centrifugal), API 676 (gear) and NFPA 20 / NBR 16704 (fire fighting). Praia Grande sits 9 km from the port cluster centered in Santos, a proximity that usually means shared suppliers and aligned maintenance standards. Operations in turismo, comércio dominate the local production profile, defining the typical fluid catalogue and the FB series recommended for each application. FB Bombas maintains in Praia Grande the technical portfolio of CRCC Petrobras + API 676 + ASME B73.1 (API 610 on engineered-to-order projects) — a regulatory base that spans refining, petrochemicals, mining, sanitation, pulp and paper, sugar-ethanol and steel. Membership in the Metropolitana de São Paulo mesoregion (IBGE) places Praia Grande in a regional economic mesh — a factor FB Bombas uses to optimize multi-city maintenance campaigns and consolidate freight across customers along the same axis. FB Bombas technical service in Praia Grande covers centrifugal- and gear-pump sizing, commissioning support, assisted startup and operator training — a scope that spans the full technical-supply cycle. The SP-300 Rodovia Marechal Rondon (via Rodoanel SP-021) corridor combined with highways SP-300, SP-021, SP-330, BR-116 and BR-374 composes the freight mesh to Praia Grande — a cost variable in pricing skids, pump-motor sets and indivisible cargo with escort. Cabreúva-SP → Praia Grande (107 km via SP-300 Rodovia Marechal Rondon (via Rodoanel SP-021)): origin of FB manufacturing since 1944, with vertical integration on a single site — CNC machining, assembly hydraulic bench and ISO 21940 G2.5 balancing — every unit ships with a traceable Data Book.
ASME B73.1 for horizontal normalized centrifugal pumps — consolidated market standard: this is the normative package applied in Praia Grande — defining acceptance testing, dimensional tolerances, material requirements and the Data Book delivered to the customer. In Praia Grande, influence from the portuario cluster translates into bunker fuel oil (BPF), seawater for cooling and liquid bulk movement — variables that enter both preliminary sizing and the selection of materials and constructive configurations. For Praia Grande (107 km from Cabreúva-SP), the critical-parts logistics cycle runs in 24-48h — a workable window for regular PM campaigns with controlled risk of extended downtime.
Praia Grande belongs to the set of cities with relevant industrial scale in the state — an input that defines commercial priority and relationship type (one-shot, annual program, master agreement). Praia Grande has a services-oriented economy (68% of value added, IBGE 2021; 2023 GDP of R$ 11.4 billion) — in this profile, typical projects involve centrifugals for utilities, reservoirs and fire networks, with the FBCN as the reference series. In Praia Grande, medium density — regular and predictable opportunity pipeline — a characteristic that sizes FB's commercial strategy: application-engineering coverage, visit cadence and depth of consignment stock. turismo operations in Praia Grande demand continuous pumping of process fluids, with preventive-maintenance windows aligned to plant scheduled outages. Cities adjacent to Praia Grande belong to recognized industrial clusters, creating a regional demand ecosystem where spare parts and technical visits can be optimized through joint campaigns. Praia Grande, among the 50 most populous cities in SP, maintains a relevant industrial base, offers a continuous pipeline of technical opportunities — from retrofit to greenfield. The portuario cluster near Praia Grande brings applications such as bunker (BPF fuel oil), marine cooling water and liquid-bulk discharge — a repertoire FB Bombas serves with dedicated series and field-validated materials.
Cabreúva-SP → Praia Grande via SP-300 Rodovia Marechal Rondon (via Rodoanel SP-021) (107 km): a corridor with regular FB freight history, supporting indivisible loads and sets with escort when the gauge demands. The SP-300, SP-021, SP-330, BR-116 and BR-374 mesh provides logistics redundancy for Praia Grande — when one route is restricted (rains, construction, accidents), delivery is rerouted without compromising the critical lead time. For Praia Grande, 12-24h via direct road modal is the standard contractual transit window — compressible via emergency air modal for critical parts, on specific demand. For Praia Grande, FB dispatch is preceded by: hydrostatic test at 1.5× design pressure, performance run with curve points, G2.5 dynamic balancing and Data Book closure — all traceable by serial number.
FB engineers serve Praia Grande with a formal technical proposal: curve-based sizing, materials, NPSH, field conditions and lead time. First engineering response within 1 business day; complete proposal within 3-5 business days.
Talk to engineeringFor over 82 years, we have manufactured industrial pumps in Cabreúva-SP. From north to south, we serve the country's main industrial hubs with gear (FBE/FBEI) and centrifugal (FBCN/FBOT) pumps — engineered, machined and assembled in our own manufacturing facility.
Our engineering team sizes each pump for the customer's actual application, with bench testing before shipping. This technical rigor — combined with direct support from our team — is what has sustained the trust of groups like Petrobras, Vale and CSN for generations.

What changes when the pump comes straight from the manufacturer: engineering, stock and logistics under one roof in Cabreúva-SP.
Technical support across all 27 Brazilian states, from inland regions to major industrial capitals.
Nationwide deliveries through partner carrier network with optimized lead times.
Technical team available for sizing, project work and after-sales support across any region.
Original spare parts for the FBE, FBEI, FBCN and FBOT series stocked at our own factory, ready to ship.
Own factory in Cabreúva/SP with full production capability, serving Praia Grande and all of Brazil

Engineering, CNC machining and assembly — all integrated in our Cabreúva/SP factory.

We size and build complete systems, ready for installation at your industrial plant.

We keep original parts in stock for all series, ensuring continuity of your operation.

Production line with centrifugal and gear pumps assembled and tested in our manufacturing plant.
FB Bombas serves Praia Grande and the entire São Paulo region with gear pumps (internal & external) and centrifugal pumps for your industrial application. Request a quote and receive a personalized proposal.
Request QuoteFour catalog series, fire-fighting systems and engineered-to-order — in-house manufacturing and hydrostatic testing on 100% of pumps
Our technical team is ready to develop the ideal solution for your application
Contact Us
Our manufacturing plant in Cabreúva-SP integrates engineering, CNC machining and assembly under one roof. Every pump is validated through bench testing before reaching the customer — ensuring it ships ready for real application.
Present in the largest industrial projects in Brazil and Latin America









See specific solutions for Praia Grande
Brazilian sectors for which FB Bombas sizes equipment — complete technical guides per application.
FB Bombas serves Praia Grande and neighboring municipalities with the same technical team — optimized visits and supply in joint campaigns.
Beyond Praia Grande, FB Bombas supplies the FBE / FBCN / FBOT / FBEI series for turismo plants across multiple Brazilian cities — shared technical repertoire, field-validated materials and traceable Data Book on every project.
Yes. On the factory bench in Cabreúva/SP the FAT (Factory Acceptance Test) is carried out: hydraulic test with characteristic-curve measurement (Q × H), hydraulic efficiency, NPSHr and ISO 10816 vibration — witnessed by customer inspection when specified. The SAT (Site Acceptance Test) on Praia Grande projects counts on application engineering during commissioning, including startup checklist, laser alignment and recording of the baseline vibration signature.
Yes. FB Bombas offers technical training for operations and maintenance teams in Praia Grande, with modules on: sizing and reading the characteristic curve, identifying cavitation through NPSH, mechanical-seal troubleshooting, laser alignment, ISO 10816 vibration analysis and PM (preventive maintenance) practice with bearing and wear-ring replacement. Training can be delivered at the customer plant or at the Cabreúva/SP factory, in person or hybrid.
Yes. Existing installations can undergo retrofit with FB Bombas — the scope covers seal upgrades, swapping worn components, adaptation for new fluids and hydraulic performance gains. A technical report on the current installation serves as the basis for the assessment.
Three fluid fronts are covered by the FB series. FBE: mineral and synthetic oils, asphalt (CAP), BPF fuel oils, petroleum derivatives, molasses, resins, viscous chemical and hydraulic products. FBCN: raw and treated water, process fluids and industrial effluents. FBOT: thermal oil at elevated temperatures. Fluid viscosity, temperature and chemical compatibility guide the sizing of every application.
Four families are manufactured in Cabreúva/SP: external gear FBE and internal gear FBEI for viscous fluids, standardized centrifugal FBCN for low-viscosity liquids and FBOT for thermal oil circuits up to 350 °C. Fire-fighting systems per NFPA 20 / NBR 16704 complete the line.
Application engineering starts from four variables — flow, differential pressure, temperature and viscosity — and refines with available NPSH, duty cycle and chemical compatibility. The study is free for customers in Praia Grande and results in the exact model recommendation, not a generic family.
They are. For each delivery to Praia Grande, FB Bombas assembles the unit's complete technical Data Book, containing: hydraulic test certificate, material certificates — stainless steel, duplex or ductile cast iron, per spec —, ISO 21940 G2.5 balancing report, characteristic curve obtained on the bench, API 682 mechanical-seal data sheets, operation and maintenance manual and as-built drawings. Full traceability happens through the serial number.
The 107 km distance via SP-300 Rodovia Marechal Rondon (via Rodoanel SP-021) shortens everything: more economical freight, faster delivery and easier on-site technical visits for critical projects. During maintenance shutdowns, proximity to Cabreúva/SP cuts the time between the call and the part on site.
Manufacturing in Brazil since 1944, FB Bombas delivers shorter lead times — with no import dependency —, direct technical support from FB engineering, in-house manufactured replacement parts, local-currency pricing free of exchange rate exposure, and on-site service for projects in Praia Grande and surrounding areas.
Yes. For projects in Praia Grande, on-site technical visits by application engineers can be scheduled for process data collection, diagnosis of existing installations and commissioning support. Geographic proximity makes this operation agile and recurring.
Praia Grande is recognized as an important industrial hub in the region, with emphasis on turismo and comércio. FB Bombas offers specialized service for local industries.
Fill out the form and our technical team will contact you to size the ideal pump — gear (FBE/FBEI) or centrifugal (FBCN/FBOT).