I have a series or model
Review the equipment, dimensions and family documentation. For replacement, also provide the identification of your existing pump.
View the catalog
Direct service from our factory in Cabreúva, Brazil. Explore FB Bombas series and tell us what your operation needs to transfer or circulate.
Do you already know the pump or need help defining it? Choose the next step for your industrial project.
Review the equipment, dimensions and family documentation. For replacement, also provide the identification of your existing pump.
View the catalogTell us which fluid you need to transfer or circulate and how the pump will be used. You can start the conversation without all the technical details.
Describe my applicationSelection depends on the fluid and operating conditions. Location identifies the project and delivery destination.

External gear pumps for viscous fluid transfer. Check size-specific limits and availability with our sales team.
Explore models
Internal gear pumps for viscous fluid transfer. Review the configuration, materials and series documentation.
Explore models
Standardized centrifugal pumps for industrial processes. Compare curves, nozzles and dimensions to select a model.
Explore models
Horizontal construction with multiple stages for pressure elevation. Consult curves, sizes and technical documentation.
Explore models
Pumps for thermal oil circulation in industrial heating systems. Consult the series operating conditions.
Explore models
Pumping sets for fire protection systems. Review available configurations and the scope of supply.
Explore models
Skids, mobile sets and custom solutions. Send your process requirements for engineering review.
Explore modelsApplication context and points to confirm during technical and commercial review.
For projects in Mogi Guaçu, São Paulo, FB Bombas provides service from its factory in Cabreúva, Brazil. Review the industrial pump families and describe the fluid, process and operating conditions. If a pump is already installed, its model and identification help the review. Series, materials, availability and transport are confirmed for the project.
For industrial projects in Mogi Guaçu, FB Bombas provides direct service from its factory in Cabreúva, Brazil. A pump manufacturer since 1944, the company reviews the process, fluid and installation conditions with your team to define the equipment.
Identify the fluid by its trade name and available composition. Add viscosity at operating temperature, solids content and startup conditions. These data allow materials and sealing to be assessed before the configuration is confirmed.
If the project involves plants in different municipalities, list destinations, equipment and technical requirements by facility. The proposal can then describe each supply scope and its transport and service conditions.
State whether the requirement is an expansion, new installation or equipment replacement. For replacement, pump identification and its dimensional drawing help check the duty point and existing interfaces.
The project location in Mogi Guaçu does not determine the pump series. Compare families by fluid and process, then confirm selection using flow, pressure or head, temperature, viscosity and installation conditions.
For an industrial plant in Mogi Guaçu, distinguish transfer, circulation, process feed and auxiliary services. Each circuit may need a different duty point and configuration, even within the same factory or industry.
In the request for Mogi Guaçu, describe the fluid source and destination, operating duty and installation constraints. If a pump is already in use, its model and identification complement process data; they do not replace checking current conditions.
Support for Mogi Guaçu starts through the factory channels in Cabreúva, Brazil. Have the equipment identification and a description of operating conditions ready to support maintenance, spare-parts or replacement review.
For economic context, IBGE records GDP of R$ 9.4 billion for Mogi Guaçu in 2023. In the 2021 gross value added breakdown, industry accounts for approximately 32.4% and agriculture for approximately 4.6%. Reference years differ because the 2022–2023 publication does not include a sector breakdown. These data describe the municipality; pumping requirements need to be specified for your plant’s process.
To organize supply for Mogi Guaçu, state the number of pumps and each assembly’s role in the plant. Identify the duty points and operating schedule of each circuit, including the intended conditions for standby equipment.
To describe the industrial application in Mogi Guaçu, identify the process stage and whether the pump will transfer, circulate or feed another item of equipment. The same plant may have circuits with different fluid, flow, pressure and duty requirements.
Proximity to industrial areas helps organize the context of a project in Mogi Guaçu; it does not establish FB Bombas installations there. To assess an application, provide the process actually performed at the plant and its fluid and installation data.
Source: IBGE — Municipal GDP and methodologyAbout 110 km in a straight line between the factory in Cabreúva, São Paulo, and the geographic center of the municipality (IBGE centroid). It is not a road route, freight cost or lead time.
Haversine formula, treating the Earth as a sphere with a radius of 6,371 km, between the factory’s reference coordinates (Av. Adolpho João Traldi, 80 - Jacaré, Cabreúva-SP) and the municipal centroid published by IBGE in its Geographic Mesh API, retrieved on September 24, 2026. The centroid is a reference point of the municipal territory, not the municipal seat or the delivery location. The result is rounded to multiples of 5 km; below 20 km, only “less than 20 km” is shown.
IBGE Mesh API documentationThe project destination in Mogi Guaçu should be included in the quotation with the delivery address and access conditions. Route and transit time are confirmed for the cargo and selected carrier; distance between cities does not replace that planning.
Before dispatch to Mogi Guaçu, confirm the approved configuration, contracted documentation and delivery details with the sales team.
Send your application in Mogi Guaçu to the factory team in Cabreúva, Brazil. Share the fluid, duty point and installation data you already know. Identify required drawings, manuals and tests so that documentation scope and supply conditions can be confirmed in the proposal.
Review process criteria and prepare the information for equipment selection.
Centrifugal pump selection for raw water intake, treated water pumping, boosters, lift stations and water and wastewater treatment processes: fluid and solids, materials, sealing arrangements, NPSH and the documented limits of the FBCN line — and where the right technology is a different one.
View applicationPump selection for acids, caustic bases, organic solvents, polymers, intermediates and pharmaceutical plant utilities — criteria for material, sealing, classified areas and the boundary between chemical service and sanitary product contact.
View applicationPump selection for diesel S10, gasoline C, jet fuel (QAV-1), heavy fuel oil and refinery utilities — NPSH in volatile products, classified areas and Ex certification, API 682 seal plans and the FB Bombas service scope.
View applicationChilled water, condenser water, transfer and boosting have different demands. Organise thermal load, flow, head, water quality and controls to assess FBCN against actual building conditions.
View applicationShare what you already know. Additional details can be clarified with the team during review.
What needs to be pumped, where it comes from and where it needs to go.
Flow, pressure or head, temperature and operating schedule, when known.
Series, model, identification and space or connection constraints, if a pump is already installed.
Project location, requested scope and documents required for your purchase.

FB Bombas is a Brazilian manufacturer with a history dating back to 1944. Our factory in Cabreúva, São Paulo, brings together CNC machining, assembly and a hydraulic test bench. The team reviews your application and confirms the configuration, documents and supply conditions in the proposal.
About FB BombasUse the family documentation and application guides to prepare your request.
Installation, operation and maintenance by series, with the document language identified.
View manualsUnderstand the process information needed to specify the equipment.
View applicationsSee the other pages for this city and for other cities. Service is provided by the factory in Cabreúva, Brazil.
Information to help you prepare your inquiry to FB Bombas.
Yes, when they are included in the purchase scope. The published services include bench performance testing with a scope defined for the project, and on-site start-up and commissioning based on the manual and site conditions. Procedure, test points, acceptance criteria, customer witnessing and reports are defined in the proposal before the supply for Mogi Guaçu is contracted.
It depends on the model and the duty point; there is no single efficiency figure for the brand. The FBCN and FBME characteristic curves show the efficiency of each model and, for stainless-steel impellers with passages up to 15 mm, the FBCN manual deducts 2 or 3 points from the curve efficiency (Table 4). For the project in Mogi Guaçu, compare the absorbed power at the process flow, head and fluid, also considering drive, control and operating duty.
It depends on the series, as set out in each manual: 10 kgf/cm² for the FBE (MTEC-01/01, Table 5), 1.5 times the operating pressure for the FBOT (MTEC-16/00), 1.5 times the working pressure for the FBME (MTEC-08/01) and per ANSI B73.1 for the FBCN (MTEC-03/00). The test is performed on the factory bench in Cabreúva, Brazil; certificates, additional tests and customer witnessing are defined in the proposal for supply to Mogi Guaçu.
Yes, in the five Custom Solutions categories: custom complete motor-pump assembly, mobile industrial kit, industrial pump skid, retrofit with a new FB pump in place of the installed one, and special materials projects. The scope of each project is defined with engineering before manufacture in Cabreúva, Brazil.
Service is provided from the factory in Cabreúva, Brazil. For the project in Mogi Guaçu, provide the address, access conditions and delivery or visit needs. Costs, scheduling and timing depend on those conditions and confirmed availability, not only on distance between cities.
It depends on the series. On the FBCN and FBOT, back pull-out construction allows the bearing-housing assembly to be removed without disconnecting the piping, and the FBEI catalogue also indicates back pull-out construction. The FBE external gear pump is not back pull-out: its shafts are supported on bushings. Before working on the equipment in Mogi Guaçu, check the series manual, the sectional drawing and the parts list.
Yes. The FBOT is the FB Bombas series developed for pumping organic thermal oils. Manual MTEC-16/00 states temperatures up to 350 °C within the series range and back pull-out construction, which allows the bearing-housing assembly to be removed without disconnecting the piping; the maximum discharge pressure varies with temperature (Figure 1 of the manual), and the fluid must not contain abrasive particles. For the circuit in Mogi Guaçu, send the oil identification and technical data sheet, the start-up and operating temperatures and the flow and head duty point; model, materials and sealing are confirmed for the circuit.
It depends on the series. The FBE can have packing, a mechanical seal, a lip seal or a magnetic coupling; the standard seal is type 21, in ceramic, graphite and Viton, with an AISI 304 stainless-steel spring. The FBCN uses packing or a mechanical seal, the FBOT combines graphite packing as the first sealing stage with a mechanical seal immersed in the bearing-housing oil, and the FBEI accepts packing or a single, double or cartridge mechanical seal. State the fluid, concentration, temperature and pressure of the process in Mogi Guaçu to define the arrangement.
When the Data Book is part of the purchase scope. State which drawings, manuals, certificates and test reports are required for Mogi Guaçu; the proposal confirms the documents applicable to the supplied series and configuration. The same Data Book is not assumed for every pump.
The portfolio includes pumping sets for fire protection systems. Provide the project, duty point, drive arrangement and required standards and acceptance criteria. Compliance must be checked for the supplied set; standards such as NFPA 20 and NBR 16704 are not certificates issued for the entire company.
Send your application to our factory team. You do not need every parameter defined to start the conversation.
The team reviews the information and confirms the details needed for a proposal. Configuration, availability, documentation, transport and lead time depend on the requested scope.
Describe the fluid, application and project destination. Include the model and technical data you already have.