Technical summary
Hortolândia, São Paulo is FB Bombas territory: FBE, FBCN series for tecnologia, vertically integrated manufacturing in Cabreúva-SP (52 km), API 676/ASME B73.1 compliance and Petrobras CRCC. Typical lead time: 24-48h.


Gear pumps (internal & external) and centrifugal pumps manufactured in Cabreúva/SP. Serving Hortolândia and region — factory 46km away. Technical response within 24h.
Gear pumps (internal & external) and centrifugal pumps manufactured in Cabreúva/SP. Serving Hortolândia and region — factory 46km away. Technical response within 24h.

Years
Compliant
Tested
Direct answer for industrial projects — recommended series, standards compliance and logistics.
Hortolândia, São Paulo is FB Bombas territory: FBE, FBCN series for tecnologia, vertically integrated manufacturing in Cabreúva-SP (52 km), API 676/ASME B73.1 compliance and Petrobras CRCC. Typical lead time: 24-48h.
Brazilian industrial-pump manufacturer since 1944, FB Bombas supplies Hortolândia, São Paulo with the FBE, FBCN, FBOT, FBEI series and FBFS fire-fighting systems — designed and produced in Cabreúva-SP with API 676 compliance, ASME B73.1 normalization (interchangeable with global manufacturers), API 610 engineered-to-order projects and a traceable Data Book on every unit shipped. For Hortolândia, where tecnologia is the dominant calling, FB Bombas recommends the FBCN series: FBCN pumps for HVAC systems and utilities in data centers and technology industries. Technical window: Silent operation, High efficiency, Reliability. Hortolândia is served by the SP-300 Rodovia Marechal Rondon (via Rodoanel SP-021) axis and also by highways SP-300, SP-021, SP-330, BR-116 and BR-374 for heavy-cargo movement — relevant for delivery of mounted skids and large pump-and-motor sets. The refining cluster of Paulinia is 12 km from Hortolândia, generating economic spillover and correlated technical demand — common in pumping projects involving both cities. The IBGE classification places Hortolândia in the Campinas mesoregion — an area whose industrial profile directly influences demand for rotating equipment. Hortolândia's industrial profile centers on Tecnologia and Logística — sectors with specific pumping demands that FB Bombas meets with dedicated product series. FB Bombas pumps installed in Hortolândia, São Paulo meet CRCC Petrobras qualification, ASME B73.1 (centrifugal) and API 676 (gear) compliance — credentials FB has sustained as a Brazilian manufacturer since 1944. FB Bombas serves Hortolândia from its Cabreúva-SP factory, with transport via SP-300 Rodovia Marechal Rondon (via Rodoanel SP-021) and application-engineering support for dimensioning according to the actual operation profile.
In Hortolândia, influence from the refino cluster translates into crude oil, derivatives, high temperature (up to 260°C in FBCN, 350°C in FBOT) and API 610 requirements met via engineered-to-order projects — variables that enter both preliminary sizing and the selection of materials and constructive configurations. In Hortolândia, API 676 for positive displacement and — on critical services, via engineered-to-order projects — API 610 for centrifugal, the typical downstream Oil & Gas package are the applicable references — easing approval at commissioning and during technical audits. The FB model for Hortolândia: 24-48h logistics lead time, with the option to accelerate via air modal or alternative routing in operational emergencies.
In Hortolândia, high industrial density — multiple plants in a small radius, meaningful cumulative demand — a characteristic that sizes FB's commercial strategy: application-engineering coverage, visit cadence and depth of consignment stock. IBGE figures size the local market: GDP of R$ 22.2 billion in 2023, with 35.5% of value added coming from industry (2021) — in Hortolândia, pumping is a production input, not an accessory. Hortolândia belongs to the set of cities with relevant industrial scale in the state — an input that defines commercial priority and relationship type (one-shot, annual program, master agreement). In Hortolândia, tecnologia accounts for a large share of the pumping load — combining utility lines (water, steam, compressed air) with dedicated process circuits. In Hortolândia, near a refino cluster, applications such as crude transfer, distillation-tower circulation, charge pumps for reactors and movement of derivatives make up the operational agenda — each backed by technical references in the FBE/FBCN/FBOT catalogues. Hortolândia, among the 50 most populous cities in SP, maintains a relevant industrial base, sustains a predictable B2B demand chain — an ideal profile for scheduled supply and multi-year replacement contracts. Hortolândia sits alongside relevant industrial neighbors — a base that justifies regional rotating-asset management programs and PMs synchronized across multiple customers.
52 km separate the Cabreúva-SP factory from Hortolândia via SP-300 Rodovia Marechal Rondon (via Rodoanel SP-021) — an axis sized for movement of pumps, skids and pump-and-motor sets. Logistics lead time to Hortolândia is 12-24h via direct road modal — variable with cargo type, season and specific optimizations. Alternative routing to Hortolândia can use SP-300, SP-021, SP-330, BR-116 and BR-374, which helps in heavy-traffic situations or maintenance on specific roads. The factory-to-Hortolândia logistics cycle begins with documented dispatch: invoice, packing list, test certificates and the equipment's technical manual.
For projects in Hortolândia, talk to FB engineering: technical analysis of the duty point, series and materials recommendation, hydraulic-test scope and Data Book. Direct service.
Talk to engineeringFor over 82 years, we have manufactured industrial pumps in Cabreúva-SP. From north to south, we serve the country's main industrial hubs with gear (FBE/FBEI) and centrifugal (FBCN/FBOT) pumps — engineered, machined and assembled in our own manufacturing facility.
Our engineering team sizes each pump for the customer's actual application, with bench testing before shipping. This technical rigor — combined with direct support from our team — is what has sustained the trust of groups like Petrobras, Vale and CSN for generations.

What changes when the pump comes straight from the manufacturer: engineering, stock and logistics under one roof in Cabreúva-SP.
Technical support across all 27 Brazilian states, from inland regions to major industrial capitals.
Nationwide deliveries through partner carrier network with optimized lead times.
Technical team available for sizing, project work and after-sales support across any region.
Original spare parts for the FBE, FBEI, FBCN and FBOT series stocked at our own factory, ready to ship.
Own factory in Cabreúva/SP with full production capability, serving Hortolândia and all of Brazil

Engineering, CNC machining and assembly — all integrated in our Cabreúva/SP factory.

We size and build complete systems, ready for installation at your industrial plant.

We keep original parts in stock for all series, ensuring continuity of your operation.

Production line with centrifugal and gear pumps assembled and tested in our manufacturing plant.
FB Bombas serves Hortolândia and the entire São Paulo region with gear pumps (internal & external) and centrifugal pumps for your industrial application. Request a quote and receive a personalized proposal.
Request QuoteFour catalog series, fire-fighting systems and engineered-to-order — in-house manufacturing and hydrostatic testing on 100% of pumps
Our technical team is ready to develop the ideal solution for your application
Contact Us
Our manufacturing plant in Cabreúva-SP integrates engineering, CNC machining and assembly under one roof. Every pump is validated through bench testing before reaching the customer — ensuring it ships ready for real application.
Present in the largest industrial projects in Brazil and Latin America









See specific solutions for Hortolândia
Brazilian sectors for which FB Bombas sizes equipment — complete technical guides per application.
FB Bombas serves Hortolândia and neighboring municipalities with the same technical team — optimized visits and supply in joint campaigns.
Beyond Hortolândia, FB Bombas supplies the FBCN series for tecnologia plants across multiple Brazilian cities — shared technical repertoire, field-validated materials and traceable Data Book on every project.
Yes — Hortolândia is part of FB Bombas’ direct service area. Supply, engineering support and spare parts ship from the factory in Cabreúva/SP; sizing is done at no cost and, when the project is critical, the team evaluates an on-site technical visit.
Four families are manufactured in Cabreúva/SP: external gear FBE and internal gear FBEI for viscous fluids, standardized centrifugal FBCN for low-viscosity liquids and FBOT for thermal oil circuits up to 350 °C. Fire-fighting systems per NFPA 20 / NBR 16704 complete the line.
Yes. In addition to the standard portfolio, FB Bombas develops custom solutions for special applications, including modifications in construction materials, sealing arrangements, integrated heating systems, skids, mobile assemblies and retrofit of existing installations. Special projects go through engineering before manufacturing.
Yes. FB Bombas offers technical training for operations and maintenance teams in Hortolândia, with modules on: sizing and reading the characteristic curve, identifying cavitation through NPSH, mechanical-seal troubleshooting, laser alignment, ISO 10816 vibration analysis and PM (preventive maintenance) practice with bearing and wear-ring replacement. Training can be delivered at the customer plant or at the Cabreúva/SP factory, in person or hybrid.
Yes. FB Bombas serves the entire metropolitan region and microregions neighboring Hortolândia with the same technical support and logistics structure. This regional reach allows serving industrial plants distributed across multiple cities in a coordinated way.
The FB line covers a wide range: mineral and synthetic oils, asphalt (CAP), BPF fuel oils, petroleum derivatives, molasses, resins, viscous chemical and hydraulic products (FBE series); raw and treated water, process fluids, industrial effluents (FBCN series); thermal oil at elevated temperatures (FBOT series). Each application is sized according to fluid viscosity, temperature and chemical compatibility.
It does. FB Bombas' retrofit service for existing installations encompasses updated seals, replaced worn components, adjustment to new fluids and improved hydraulic performance. To evaluate each case, the reference is the technical report on the current installation.
The schedule is set by three factors: chosen series, construction materials and stock at order time. Standard configurations ship faster; custom ones receive a firm date in the technical proposal. Delivery to Hortolândia is by road, shipping directly from the factory.
They are. In energy consumption, nothing weighs more than sizing correctly: oversized or undersized pumps generate waste. FB Bombas engineering's job is to define the ideal operating point for the actual process conditions in Hortolândia, optimizing flow, pressure and power together.
The 52 km distance via SP-300 Rodovia Marechal Rondon (via Rodoanel SP-021) shortens everything: more economical freight, faster delivery and easier on-site technical visits for critical projects. During maintenance shutdowns, proximity to Cabreúva/SP cuts the time between the call and the part on site.
Hortolândia is recognized as an important industrial hub in the region, with emphasis on tecnologia and logística. FB Bombas offers specialized service for local industries.
Fill out the form and our technical team will contact you to size the ideal pump — gear (FBE/FBEI) or centrifugal (FBCN/FBOT).