Skip to main content

Industrial pumps for projects in Rio Pardo, Rio Grande do Sul

Direct service from our factory in Cabreúva, Brazil. Explore FB Bombas series and tell us what your operation needs to transfer or circulate.

Start with your requirements

Do you already know the pump or need help defining it? Choose the next step for your industrial project.

Information for your project

Application context and points to confirm during technical and commercial review.

Initial guidance

For projects in Rio Pardo, Rio Grande do Sul, FB Bombas provides service from its factory in Cabreúva, Brazil. Review the industrial pump families and describe the fluid, process and operating conditions. If a pump is already installed, its model and identification help the review. Series, materials, availability and transport are confirmed for the project.

Industrial context

For industrial projects in Rio Pardo, FB Bombas provides direct service from its factory in Cabreúva, Brazil. A pump manufacturer since 1944, the company reviews the process, fluid and installation conditions with your team to define the equipment.

Describe your plant activity and the pump’s role in the process: transfer, circulation or feed. The team combines this information with fluid and installation data to guide the review of product families.

State whether the requirement is an expansion, new installation or equipment replacement. For replacement, pump identification and its dimensional drawing help check the duty point and existing interfaces.

Technical criteria

The project location in Rio Pardo does not determine the pump series. Compare families by fluid and process, then confirm selection using flow, pressure or head, temperature, viscosity and installation conditions.

To define materials for the project in Rio Pardo, provide fluid composition, concentration, temperature and solids content. Also describe the external environment; the city name does not establish chemical compatibility or determine pump material.

Support for Rio Pardo starts through the factory channels in Cabreúva, Brazil. Have the equipment identification and a description of operating conditions ready to support maintenance, spare-parts or replacement review.

Applications and operation

For economic context, IBGE records GDP of R$ 1.2 billion for Rio Pardo in 2023. In the 2021 gross value added breakdown, industry accounts for approximately 8.2% and agriculture for approximately 43.8%. Reference years differ because the 2022–2023 publication does not include a sector breakdown. These data describe the municipality; pumping requirements need to be specified for your plant’s process.

To organize supply for Rio Pardo, state the number of pumps and each assembly’s role in the plant. Identify the duty points and operating schedule of each circuit, including the intended conditions for standby equipment.

To describe the industrial application in Rio Pardo, identify the process stage and whether the pump will transfer, circulate or feed another item of equipment. The same plant may have circuits with different fluid, flow, pressure and duty requirements.

If the operation in Rio Pardo uses different fluids, record composition, viscosity, temperature and solids content separately for each circuit. Compatibility with one product does not establish that the pump will serve every other plant process.

Source: IBGE — Municipal GDP and methodology

Supply and service

Reference distance

About 925 km in a straight line between the factory in Cabreúva, São Paulo, and the geographic center of the municipality (IBGE centroid). It is not a road route, freight cost or lead time.

How the distance is calculated

Haversine formula, treating the Earth as a sphere with a radius of 6,371 km, between the factory’s reference coordinates (Av. Adolpho João Traldi, 80 - Jacaré, Cabreúva-SP) and the municipal centroid published by IBGE in its Geographic Mesh API, retrieved on September 24, 2026. The centroid is a reference point of the municipal territory, not the municipal seat or the delivery location. The result is rounded to multiples of 5 km; below 20 km, only “less than 20 km” is shown.

IBGE Mesh API documentation

The project destination in Rio Pardo should be included in the quotation with the delivery address and access conditions. Route and transit time are confirmed for the cargo and selected carrier; distance between cities does not replace that planning.

Before dispatch to Rio Pardo, confirm the approved configuration, contracted documentation and delivery details with the sales team.

Send your requirements

Send your application in Rio Pardo to the factory team in Cabreúva, Brazil. Share the fluid, duty point and installation data you already know. Identify required drawings, manuals and tests so that documentation scope and supply conditions can be confirmed in the proposal.

Understand your application

Review process criteria and prepare the information for equipment selection.

From requirements to a technical proposal

Share what you already know. Additional details can be clarified with the team during review.

Fluid and process

What needs to be pumped, where it comes from and where it needs to go.

Operating conditions

Flow, pressure or head, temperature and operating schedule, when known.

Equipment and installation

Series, model, identification and space or connection constraints, if a pump is already installed.

Destination and supply

Project location, requested scope and documents required for your purchase.

FB Bombas factory in Cabreúva, São Paulo, Brazil

Direct service from the factory

FB Bombas is a Brazilian manufacturer with a history dating back to 1944. Our factory in Cabreúva, São Paulo, brings together CNC machining, assembly and a hydraulic test bench. The team reviews your application and confirms the configuration, documents and supply conditions in the proposal.

About FB Bombas

Review the documentation

Use the family documentation and application guides to prepare your request.

See the other pages for this city and for other cities. Service is provided by the factory in Cabreúva, Brazil.

Questions about our service

Information to help you prepare your inquiry to FB Bombas.

Does FB Bombas retrofit older pumps?

By replacement, not refurbishment. FB Bombas replaces the old pump with a new, complete FB pump manufactured in Cabreúva, Brazil. Before the order, engineering assesses the installation and issues a data sheet and dimensional drawing; the drawing confirms whether the existing baseplate and piping can be kept or need adaptation. FB does not refurbish other manufacturers’ pumps, sell third-party parts or reuse the installed casing. For FB pumps in service, it supplies original parts and maintenance contracts.

What is the balancing grade of FB pumps for critical projects in Rio Pardo?

The published grade is for the FBME: service manual MSERV-08/01 (item 12.2) specifies static and dynamic impeller balancing to grade G6.3. The manuals of the other series do not publish a grade; for them and for critical projects in Rio Pardo, specify the required standard, grade and report in the purchase scope. Impeller balancing alone does not guarantee the vibration level of the installation.

Do FBCN pumps follow ASME B73.1 dimensional compliance?

No: manual MTEC-03/00 states mechanical construction per ASME B73.1, not dimensional compliance with that standard. So, before a replacement in Rio Pardo, interchangeability with the existing pump is checked on each model’s drawing, together with the duty point, materials and drive.

How can I check whether a pump purchase for Rio Pardo can use BNDES Finame?

Following the BNDES steps, first check whether the equipment appears on the list of items eligible for BNDES Finame financing, in the CFI Catalog on the bank’s website; for that check, ask the sales team for the identification of the model quoted for Rio Pardo. Then apply for financing through an accredited financial agent, such as a commercial bank, development bank, development agency or credit union. The agent reviews the request and, if it approves the operation, forwards it to BNDES, which evaluates the request and authorizes the financing. Being a Brazilian manufacturer does not, on its own, show that the equipment is accredited.

Does the cold climate around Rio Pardo affect pump selection?

It can, especially with viscous fluids. On the FBE, speed and transmission are set by fluid viscosity (Table 2 of manual MTEC-01/01), and the heating chamber is available only on sizes from 1.1/2" to 6". The FBEI manual requires the fluid to be at the proper temperature and viscosity before start-up and the heating jacket to be supplied gradually, with steam up to 185 °C or thermal fluid up to 232 °C, both up to 10 bar. State the minimum site temperatures and the fluid viscosity at start-up and in operation in Rio Pardo.

How can I check whether an FBCN can replace the centrifugal pump installed in Rio Pardo?

FB Bombas supplies the complete FBCN and checks, model by model, the dimensions in manual MTEC-03/00 (baseplate, nozzles, flanges and shaft) and the duty point before the order. The manual states mechanical construction per ASME B73.1; dimensional interchangeability with the existing pump is not assumed and is confirmed on the drawing. Send the identification and drawing of the pump installed in Rio Pardo, with flow, head, fluid, materials and drive.

How do I contact FB Bombas’ technical team?

Use WhatsApp +55 11 97287-4837, telephone +55 11 4898-9200, comercial@fbbombas.com.br or the website form. To help the team, describe the application, project destination and any pump data already available.

Are replacement parts available for customers in Rio Pardo?

Yes, for FB product lines. The FBE catalogue lists replacement components such as shafts, gears, bushing sets, covers, mechanical seal, lip seal and relief valve, and the FBEI and FBME manuals include spare-parts lists for two years of operation. For delivery to Rio Pardo, state the series, model, manufacturing number and component; compatibility, availability and lead time are confirmed in the quotation. Supply ships from the factory in Cabreúva, Brazil; the city page does not indicate local stock. Use original parts: the FBME service manual makes the operating and performance warranty conditional on original parts and FB’s consent.

How can I request a pump vibration assessment in Rio Pardo?

Send the series and model of the pump installed in Rio Pardo, the operating conditions and the available vibration records; the standard, measurement points and limits are defined for the assembly, with no single limit for every pump. Check the alignment first: the FBEI (MAN001-10) and FBME (MSERV-08/01) manuals identify pump-to-motor misalignment as a source of vibration and premature wear and call for realignment after final installation, because transport usually misaligns the set, which leaves the factory pre-aligned; the stated tolerance is under 0.05 mm radial and 0.6° angular, according to the coupling supplier.

What is the delivery lead time for pumps to Rio Pardo?

Lead time to Rio Pardo depends on the model, configuration and transport. Several FBE models are kept in stock; availability and expected dispatch for each item are confirmed in the quotation. State the destination and the date you need so that the proposal also defines freight and delivery responsibilities.

Tell us about your project

Send your application to our factory team. You do not need every parameter defined to start the conversation.

What happens next

The team reviews the information and confirms the details needed for a proposal. Configuration, availability, documentation, transport and lead time depend on the requested scope.

Your industrial requirements

Describe the fluid, application and project destination. Include the model and technical data you already have.

Your contact detailsEnter your contact details so we can get back to you.

A CNPJ is only required for companies in Brazil.

Include the area code. No need to repeat +55.

How can we help?Tell us about the application, your question or what needs to change in your operation.

0 / 1000 characters

Reply after we review your request