Industrial context
If the project involves plants in different municipalities, list destinations, equipment and technical requirements by facility. The proposal can then describe each supply scope and its transport and service conditions.
Direct service from our factory in Cabreúva, Brazil. Explore FB Bombas series and tell us what your operation needs to transfer or circulate.
Do you already know the pump or need help defining it? Choose the next step for your industrial project.
Review the equipment, dimensions and family documentation. For replacement, also provide the identification of your existing pump.
Industrial pump catalogTell us the fluid and what the pump will do: transfer, circulate or feed another unit.
Describe my applicationSelection depends on the fluid and operating conditions. Location identifies the project and delivery destination.

External gear pumps for viscous fluids. From 1/8″ to 4″, in stock in every configuration: ask our team for availability and pricing.
View the models
Internal gear pumps for viscous fluid transfer. Review the configuration, materials and series documentation.
View the models
Standardized centrifugal pumps for industrial processes. Compare curves, nozzles and dimensions to select a model.
View the models
Horizontal construction with multiple stages for pressure elevation. Consult curves, sizes and technical documentation.
View the models
Pumps for thermal oil circulation in industrial heating systems. Consult the series operating conditions.
View the models
Pumping sets for fire protection systems. Review available configurations and the scope of supply.
View the models
Skids, mobile sets and custom solutions. Send your process requirements for engineering review.
View the modelsApplication context and points to confirm during technical and commercial review.
For projects in Estância Velha, Rio Grande do Sul, FB Bombas works directly from its factory. Review the industrial pump families and describe the fluid, process and operating conditions. If a pump is already installed, its model and identification help the review. Series, materials, availability and transport are confirmed for the project.
If the project involves plants in different municipalities, list destinations, equipment and technical requirements by facility. The proposal can then describe each supply scope and its transport and service conditions.
The project location in Estância Velha does not determine the pump series. Compare families by fluid and process, then confirm selection using flow, pressure or head, temperature, viscosity and installation conditions.
Sealing for the pump destined for Estância Velha should be specified from the fluid, pressure, temperature and containment requirements. Check the series manual options and identify special requirements in the request; the same arrangement is not assumed for every pump.
Support for Estância Velha starts through the factory channels. Have the equipment identification and a description of operating conditions ready to support maintenance, spare-parts or replacement review.
For economic context, IBGE records GDP of R$ 2.3 billion for Estância Velha in 2023. In the 2021 gross value added breakdown, industry accounts for approximately 34.6% and agriculture for approximately 0.4%. Reference years differ because the 2022–2023 publication does not include a sector breakdown. These data describe the municipality; pumping requirements need to be specified for your plant’s process.
To organize supply for Estância Velha, state the number of pumps and each assembly’s role in the plant. Identify the duty points and operating schedule of each circuit, including the intended conditions for standby equipment.
To describe the industrial application in Estância Velha, identify the process stage and whether the pump will transfer, circulate or feed another item of equipment. The same plant may have circuits with different fluid, flow, pressure and duty requirements.
Proximity to industrial areas helps organize the context of a project in Estância Velha; it does not establish FB Bombas installations there. To assess an application, provide the process actually performed at the plant and its fluid and installation data.
Source: IBGE — Municipal GDP and methodologyAbout 825 km in a straight line between the factory in Cabreúva, São Paulo, and the geographic center of the municipality (IBGE centroid). It is not a road route, freight cost or lead time.
Haversine formula, treating the Earth as a sphere with a radius of 6,371 km, between the factory’s reference coordinates (Av. Adolpho João Traldi, 80 - Jacaré, Cabreúva-SP) and the municipal centroid published by IBGE in its Geographic Mesh API, retrieved on September 24, 2026.
The centroid is a reference point of the municipal territory, not the municipal seat or the delivery location. The result is rounded to multiples of 5 km; below 20 km, only “less than 20 km” is shown.
IBGE Mesh API documentationSend your application in Estância Velha to the factory team with the fluid, duty point and installation data. List the drawings and manuals you require: documentation scope and supply conditions are confirmed in the proposal.
Local units and persons employed in the manufacturing divisions, from largest to smallest.
| Division (CNAE) | Local units | Persons employed |
|---|---|---|
| 15 · Preparation of leather and manufacture of leather goods, travel goods and footwear | 203 | 3,002 |
| 25 · Manufacture of fabricated metal products, except machinery and equipment | 75 | 507 |
| 20 · Manufacture of chemicals and chemical productsChemical and pharmaceutical process guide | 18 | 346 |
| 22 · Manufacture of rubber and plastics products | 32 | 268 |
| 13 · Manufacture of textiles | 13 | 226 |
| 31 · Manufacture of furniture | 39 | 190 |
| 10 · Manufacture of food productsGuide to syrups, molasses and vegetable oils | 29 | 185 |
| 17 · Manufacture of pulp, paper and paper productsKraft pulp and paper guide | 9 | 148 |
| 32 · Manufacture of miscellaneous products | 26 | 144 |
| 28 · Manufacture of machinery and equipment | 21 | 121 |
| 33 · Maintenance, repair and installation of machinery and equipment | 39 | 85 |
| 14 · Manufacture of wearing apparel and accessories | 18 | 76 |
| 18 · Printing and reproduction of recorded media | 15 | 75 |
| 16 · Manufacture of wood products | 12 | 74 |
| 30 · Manufacture of other transport equipment, except motor vehicles | 3 | 56 |
| 23 · Manufacture of other non-metallic mineral products | 12 | 32 |
| 11 · Manufacture of beverages | 5 | 16 |
| 29 · Manufacture of motor vehicles, trailers and semi-trailers | 4 | 10 |
| 24 · Metallurgy | 4 | 9 |
| Total manufacturing (section C) | 580 | 5,577 |
2 divisions are marked X, a value suppressed to protect the respondent's identity; they are excluded from the ranking.
Review process criteria and prepare the information for equipment selection.
Centrifugal pump selection for raw water intake, treated water pumping, boosters, lift stations and water and wastewater treatment processes: fluid and solids, materials, sealing arrangements, NPSH and the documented limits of the FBCN line — and where the right technology is a different one.
Pump selection for acids, caustic bases, organic solvents, polymers, intermediates and pharmaceutical plant utilities — criteria for material, sealing, classified areas and the boundary between chemical service and sanitary product contact.
Pump selection for diesel S10, gasoline C, jet fuel (QAV-1), heavy fuel oil and refinery utilities — NPSH in volatile products, classified areas and Ex certification, sealing and the FB Bombas service scope.
Chilled water, condenser water, transfer and boosting have different demands. Organise thermal load, flow, head, water quality and controls to assess FBCN against actual building conditions.
Send what you have. Engineering asks for anything missing during the review.
What needs to be pumped, where it comes from and where it needs to go.
Flow, pressure or head, temperature and operating schedule, when known.
Series, model, identification and space or connection constraints, if a pump is already installed.
Project location, requested scope and documents required for your purchase.
FB Bombas is a Brazilian manufacturer with a history dating back to 1944. Our factory in Cabreúva, São Paulo, brings together application engineering and design, CNC machining and assembly. The team reviews your application and confirms the configuration, documents and supply conditions in the proposal.
About FB BombasUse the family documentation and application guides to prepare your request.
Installation, operation and maintenance by series, with the document language identified.
Technical pump manualsUnderstand the process information needed to specify the equipment.
Industrial pump applicationsThe state page, nearby cities and cities with the same largest division by employment, with the closest number of local units in IBGE’s CEMPRE 2024.
Information to help you prepare your inquiry to FB Bombas.
Send the series and model of the pump installed, the operating conditions and the available vibration records; the standard, measurement points and limits are defined for the assembly, with no single limit for every pump.
Check the alignment first: the FBEI (MAN001-10) and FBME (MSERV-08/01) manuals identify pump-to-motor misalignment as a source of vibration and premature wear and call for realignment after final installation, because transport usually misaligns the set, which leaves the factory pre-aligned. The stated tolerance is under 0.05 mm radial and 0.6° angular, according to the coupling supplier.
It depends on the series. On the FBCN and FBOT, back pull-out construction allows the bearing-housing assembly to be removed without disconnecting the piping, and the FBEI catalogue also indicates back pull-out construction. The FBE external gear pump is not back pull-out: its shafts are supported on bushings.
Before working on the equipment, check the series manual, the sectional drawing and the parts list.
Use the website form, WhatsApp +55 11 97287-4837 or comercial@fbbombas.com.br. Describe the project, fluid and technical data you already have. The team reviews the application, clarifies missing information and confirms the configuration and proposal conditions.
With the pump and part identification. State the pump model and identification, the part as shown in the parts list of the series manual, the urgency and the destination; the team checks availability and confirms service and transport options. There is no published universal parts lead time or automatic guarantee of consignment stock.
To reduce downtime, the FBEI (MAN001-10) and FBME (MSERV-08/01) manuals include the list of spare parts for two years of operation.
The review considers the fluid, flow, required pressure or head, temperature, viscosity and installation conditions. Provide what you already know and identify any equipment in use. The team checks the necessary data before confirming series, model, drive and materials.
Manual MTEC-03/00 does not state that compliance: it states FBCN mechanical construction per ASME B73.1, not its dimensions. So, before a replacement, interchangeability with the existing pump is checked on each model’s drawing, together with the duty point, materials and drive.
Yes. Projects are handled by the factory team. Send your industrial requirement and the data already available. Configuration, availability, transport and any on-site service are confirmed according to the requested scope.
It depends on the series. The FBE can have packing, a mechanical seal, a lip seal or a magnetic coupling; the standard seal is type 21, in ceramic, graphite and Viton, with an AISI 304 stainless-steel spring.
The FBCN uses packing or a mechanical seal, the FBOT combines graphite packing as the first sealing stage with a mechanical seal immersed in the bearing-housing oil, and the FBEI accepts packing or a single, double or cartridge mechanical seal. State the fluid, concentration, temperature and pressure of the process to define the arrangement.
When the Data Book is part of the purchase scope. State which drawings and manuals are required; the proposal confirms the documents applicable to the supplied series and configuration. The same Data Book is not assumed for every pump.
The portfolio includes pumping sets for fire protection systems. Provide the project, duty point, drive arrangement and required standards and acceptance criteria. Compliance must be checked for the supplied set; standards such as NFPA 20 and NBR 16704 are not certificates issued for the entire company.
Your message goes straight to the factory team.
The team reviews the information and confirms the details needed for a proposal. Configuration, availability, documentation, transport and lead time depend on the requested scope.
Describe the fluid, application and project destination. Include the model and technical data you already have.