I have a series or model
Review the equipment, dimensions and family documentation. For replacement, also provide the identification of your existing pump.
View the catalog
Direct service from our factory in Cabreúva, Brazil. Explore FB Bombas series and tell us what your operation needs to transfer or circulate.
Do you already know the pump or need help defining it? Choose the next step for your industrial project.
Review the equipment, dimensions and family documentation. For replacement, also provide the identification of your existing pump.
View the catalogTell us which fluid you need to transfer or circulate and how the pump will be used. You can start the conversation without all the technical details.
Describe my applicationSelection depends on the fluid and operating conditions. Location identifies the project and delivery destination.

External gear pumps for viscous fluid transfer. Check size-specific limits and availability with our sales team.
Explore models
Internal gear pumps for viscous fluid transfer. Review the configuration, materials and series documentation.
Explore models
Standardized centrifugal pumps for industrial processes. Compare curves, nozzles and dimensions to select a model.
Explore models
Horizontal construction with multiple stages for pressure elevation. Consult curves, sizes and technical documentation.
Explore models
Pumps for thermal oil circulation in industrial heating systems. Consult the series operating conditions.
Explore models
Pumping sets for fire protection systems. Review available configurations and the scope of supply.
Explore models
Skids, mobile sets and custom solutions. Send your process requirements for engineering review.
Explore modelsApplication context and points to confirm during technical and commercial review.
For projects in Belo Horizonte, Minas Gerais, FB Bombas provides service from its factory in Cabreúva, Brazil. Review the industrial pump families and describe the fluid, process and operating conditions. If a pump is already installed, its model and identification help the review. Series, materials, availability and transport are confirmed for the project.
For industrial projects in Belo Horizonte, FB Bombas provides direct service from its factory in Cabreúva, Brazil. A pump manufacturer since 1944, the company reviews the process, fluid and installation conditions with your team to define the equipment.
Delivery planning for Belo Horizonte needs the full address and plant access restrictions. Surrounding roads help locate the project, but the cargo route, carrier and timing must be confirmed when contracting transport.
Identify the fluid by its trade name and available composition. Add viscosity at operating temperature, solids content and startup conditions. These data allow materials and sealing to be assessed before the configuration is confirmed.
State whether the requirement is an expansion, new installation or equipment replacement. For replacement, pump identification and its dimensional drawing help check the duty point and existing interfaces.
The project location in Belo Horizonte does not determine the pump series. Compare families by fluid and process, then confirm selection using flow, pressure or head, temperature, viscosity and installation conditions.
For the project in Belo Horizonte, record the required duty point and process variation range. Catalogue maxima do not mean that maximum flow, pressure and temperature can occur together on any model; check the documentation for the proposed configuration.
To define materials for the project in Belo Horizonte, provide fluid composition, concentration, temperature and solids content. Also describe the external environment; the city name does not establish chemical compatibility or determine pump material.
Support for Belo Horizonte starts through the factory channels in Cabreúva, Brazil. Have the equipment identification and a description of operating conditions ready to support maintenance, spare-parts or replacement review.
For economic context, IBGE records GDP of R$ 130.2 billion for Belo Horizonte in 2023. In the 2021 gross value added breakdown, industry accounts for approximately 17.5% and agriculture for less than 0.1%. Reference years differ because the 2022–2023 publication does not include a sector breakdown. These data describe the municipality; pumping requirements need to be specified for your plant’s process.
To organize supply for Belo Horizonte, state the number of pumps and each assembly’s role in the plant. Identify the duty points and operating schedule of each circuit, including the intended conditions for standby equipment.
To describe the industrial application in Belo Horizonte, identify the process stage and whether the pump will transfer, circulate or feed another item of equipment. The same plant may have circuits with different fluid, flow, pressure and duty requirements.
If the operation in Belo Horizonte uses different fluids, record composition, viscosity, temperature and solids content separately for each circuit. Compatibility with one product does not establish that the pump will serve every other plant process.
Source: IBGE — Municipal GDP and methodologyAbout 490 km in a straight line between the factory in Cabreúva, São Paulo, and the geographic center of the municipality (IBGE centroid). It is not a road route, freight cost or lead time.
Haversine formula, treating the Earth as a sphere with a radius of 6,371 km, between the factory’s reference coordinates (Av. Adolpho João Traldi, 80 - Jacaré, Cabreúva-SP) and the municipal centroid published by IBGE in its Geographic Mesh API, retrieved on September 24, 2026. The centroid is a reference point of the municipal territory, not the municipal seat or the delivery location. The result is rounded to multiples of 5 km; below 20 km, only “less than 20 km” is shown.
IBGE Mesh API documentationThe project destination in Belo Horizonte should be included in the quotation with the delivery address and access conditions. Route and transit time are confirmed for the cargo and selected carrier; distance between cities does not replace that planning.
Before dispatch to Belo Horizonte, confirm the approved configuration, contracted documentation and delivery details with the sales team.
Send your application in Belo Horizonte to the factory team in Cabreúva, Brazil. Share the fluid, duty point and installation data you already know. Identify required drawings, manuals and tests so that documentation scope and supply conditions can be confirmed in the proposal.
Data from official and industry sources, with the FB line that serves each process. Mentioning a facility does not imply a commercial relationship with FB Bombas.
Petrobras's Gabriel Passos Refinery (Regap) is in Betim, in the Belo Horizonte Metropolitan Region, and processes up to 157,000 barrels per day. Its products include diesel, gasoline, asphalts and fuel oils.
In the FIEMG region that covers Belo Horizonte and 81 other municipalities, the extraction of metallic minerals accounted for 62.6% of 2023 exports, and metallurgy for 16.8%.
Source: FIEMG — Painel Regional da Indústria Mineira, Regional Sede (março/2024), accessed September 27, 2026Review process criteria and prepare the information for equipment selection.
Centrifugal pump selection for raw water intake, treated water pumping, boosters, lift stations and water and wastewater treatment processes: fluid and solids, materials, sealing arrangements, NPSH and the documented limits of the FBCN line — and where the right technology is a different one.
View applicationPump selection for acids, caustic bases, organic solvents, polymers, intermediates and pharmaceutical plant utilities — criteria for material, sealing, classified areas and the boundary between chemical service and sanitary product contact.
View applicationPump selection for diesel S10, gasoline C, jet fuel (QAV-1), heavy fuel oil and refinery utilities — NPSH in volatile products, classified areas and Ex certification, API 682 seal plans and the FB Bombas service scope.
View applicationChilled water, condenser water, transfer and boosting have different demands. Organise thermal load, flow, head, water quality and controls to assess FBCN against actual building conditions.
View applicationShare what you already know. Additional details can be clarified with the team during review.
What needs to be pumped, where it comes from and where it needs to go.
Flow, pressure or head, temperature and operating schedule, when known.
Series, model, identification and space or connection constraints, if a pump is already installed.
Project location, requested scope and documents required for your purchase.

FB Bombas is a Brazilian manufacturer with a history dating back to 1944. Our factory in Cabreúva, São Paulo, brings together CNC machining, assembly and a hydraulic test bench. The team reviews your application and confirms the configuration, documents and supply conditions in the proposal.
About FB BombasUse the family documentation and application guides to prepare your request.
Installation, operation and maintenance by series, with the document language identified.
View manualsUnderstand the process information needed to specify the equipment.
View applicationsSee the other pages for this city and for other cities. Service is provided by the factory in Cabreúva, Brazil.
Information to help you prepare your inquiry to FB Bombas.
Yes, in the five Custom Solutions categories: custom complete motor-pump assembly, mobile industrial kit, industrial pump skid, retrofit with a new FB pump in place of the installed one, and special materials projects. The scope of each project is defined with engineering before manufacture in Cabreúva, Brazil.
The catalogue includes FBE external gear, FBEI internal gear, FBCN standardized centrifugal, FBME multistage centrifugal and FBOT thermal oil pumps, fire systems and custom solutions. Review each family’s documentation; configuration and availability are confirmed in the quotation.
Warranty conditions are defined in the proposal and contract and vary with the series, operating conditions and agreement. The manuals state what can void it. Under the FBEI manual (MAN001-10), operating with a different fluid or outside the pump’s data sheets and certified documents without FB’s written authorization voids the warranty. Under the FBME service manual (MSERV-08/01), after parts are replaced, the operating and performance warranty applies only with original parts and FB’s consent. For the project in Belo Horizonte, confirm the conditions in the quotation.
When the Data Book is part of the purchase scope. State which drawings, manuals, certificates and test reports are required for Belo Horizonte; the proposal confirms the documents applicable to the supplied series and configuration. The same Data Book is not assumed for every pump.
It depends on the series, as set out in each manual: 10 kgf/cm² for the FBE (MTEC-01/01, Table 5), 1.5 times the operating pressure for the FBOT (MTEC-16/00), 1.5 times the working pressure for the FBME (MTEC-08/01) and per ANSI B73.1 for the FBCN (MTEC-03/00). The test is performed on the factory bench in Cabreúva, Brazil; certificates, additional tests and customer witnessing are defined in the proposal for supply to Belo Horizonte.
Yes. The FBOT is the FB Bombas series developed for pumping organic thermal oils. Manual MTEC-16/00 states temperatures up to 350 °C within the series range and back pull-out construction, which allows the bearing-housing assembly to be removed without disconnecting the piping; the maximum discharge pressure varies with temperature (Figure 1 of the manual), and the fluid must not contain abrasive particles. For the circuit in Belo Horizonte, send the oil identification and technical data sheet, the start-up and operating temperatures and the flow and head duty point; model, materials and sealing are confirmed for the circuit.
Yes, once equivalence has been confirmed. FB Bombas replaces the installed pump with a complete FB pump and, before the order, assesses the installation and sends a data sheet and dimensional drawing. For the installation in Belo Horizonte, send the identification and drawing of the current pump, with its duty point, fluid, materials and drive; origin or a similar designation does not guarantee direct replacement.
By replacement, not refurbishment. FB Bombas replaces the old pump with a new, complete FB pump manufactured in Cabreúva, Brazil. Before the order, engineering assesses the installation and issues a data sheet and dimensional drawing; the drawing confirms whether the existing baseplate and piping can be kept or need adaptation. FB does not refurbish other manufacturers’ pumps, sell third-party parts or reuse the installed casing. For FB pumps in service, it supplies original parts and maintenance contracts.
It depends on the series. The published limits are up to 260 °C for the FBCN, 350 °C for the FBOT, 340 °C for the FBEI and 140 °C for the FBME. For the FBE, the 2026 catalogue gives a range of 10 °C to 500 °C; the limit of each configuration depends on materials and sealing. These are series limits: they do not automatically apply to every model, nor do they necessarily occur together with the other maximums. State the start-up, operating and cleaning temperatures of the process in Belo Horizonte.
The FBCN, a standardized centrifugal pump for clean or turbid liquids, with a series range of up to 2,200 m³/h and 135 m; when a higher head is required, the multistage FBME reaches 300 m. Each model has its own limits in the manual tables. For the project in Belo Horizonte, state the fluid and the flow and head duty point; selection checks the model curve, suction conditions, materials, drive and installation interfaces.
Send your application to our factory team. You do not need every parameter defined to start the conversation.
The team reviews the information and confirms the details needed for a proposal. Configuration, availability, documentation, transport and lead time depend on the requested scope.
Describe the fluid, application and project destination. Include the model and technical data you already have.