Technical summary
For agronegócio in Sítio Novo do Tocantins, Tocantins, FB Bombas sizes FBEI, FBCN series from its Cabreúva-SP factory (1970 km). ASME B73.1 standardization, hydraulic testing, Petrobras CRCC and 96h to 7 days logistics lead time.


Gear pumps (internal & external) and centrifugal pumps manufactured in Cabreúva/SP. Serving Sítio Novo do Tocantins and region — factory 1962km away. Technical response within 24h.
Gear pumps (internal & external) and centrifugal pumps manufactured in Cabreúva/SP. Serving Sítio Novo do Tocantins and region — factory 1962km away. Technical response within 24h.

Years
Compliant
Tested
Direct answer for industrial projects — recommended series, standards compliance and logistics.
For agronegócio in Sítio Novo do Tocantins, Tocantins, FB Bombas sizes FBEI, FBCN series from its Cabreúva-SP factory (1970 km). ASME B73.1 standardization, hydraulic testing, Petrobras CRCC and 96h to 7 days logistics lead time.
In Sítio Novo do Tocantins, Tocantins, FB Bombas serves agronegócio projects with the FBCN series — dedicated application engineering for sizing against the actual system curve, CRCC Petrobras certification and technical compliance with ASME B73.1 (centrifugal), API 676 (gear) and NFPA 20 / NBR 16704 (fire fighting). In Sítio Novo do Tocantins, defensivos viscosos and água make up the fluid portfolio served by local plants — each with its own requirements on available NPSH, in-service viscosity and sealing strategy (Plan 11/13/52/53 by criticality). FB Bombas maintains an installed base in Sítio Novo do Tocantins with a structure of spare parts (impeller, shaft, wear ring, cartridge mechanical seal, bearings) and scheduled preventive maintenance, with direct supply from the Cabreúva-SP factory. For the Sítio Novo do Tocantins, Tocantins market, FB Bombas offers industrial pumps with certified hydraulic tests, ASME B73.1 (dimensional interchangeability) and a traceable Data Book per unit — a technical package that shortens the customer homologation cycle. Just 255 km separate Sítio Novo do Tocantins from the mining cluster of Parauapebas — a distance that enables joint technical visits and dilution of mobilization cost across multiple customers. Operations in agronegócio dominate the local production profile, defining the typical fluid catalogue and the FB series recommended for each application. Based in Cabreúva-SP at 1970 km via BR-153 Rodovia Belém-Brasília (via GO), FB Bombas delivers to Sítio Novo do Tocantins industrial pumps manufactured in-house since 1944 plus continuous technical support.
FBEI and FBCN: this is the set of FB series with initial technical fit for Sítio Novo do Tocantins, respecting fluid characteristics and the regional operating regime. For defensivos viscosos and água, the materials recommendation in Sítio Novo do Tocantins converges on austenitic stainless steels (AISI 304/316) with attention to thermal expansion, a starting point adjustable based on field-observed corrosion. The transferência em armazéns and irrigação de processo set accounts for a large share of industrial demand in Sítio Novo do Tocantins; FB Bombas keeps documented history of analogous applications for sizing benchmarks. The FB model for Sítio Novo do Tocantins: 96h to 7 days logistics lead time, with the option to accelerate via air modal or alternative routing in operational emergencies.
With an agribusiness profile (22.1% of value added in agriculture, IBGE 2021) and a 2023 GDP of R$ 180 million, Sítio Novo do Tocantins concentrates demand on pumping tied to agro processing — from syrups and molasses to effluents and line cleaning. Fluid-roster complexity in Sítio Novo do Tocantins is low — lean fluid roster — technical operation focused on few main vectors. The demand profile in Sítio Novo do Tocantins reflects medium density — regular and predictable opportunity pipeline. agronegócio operations in Sítio Novo do Tocantins demand continuous pumping of process fluids, with preventive-maintenance windows aligned to plant scheduled outages. Typical fluids handled in Sítio Novo do Tocantins (defensivos viscosos and água) require careful selection of seal and coating materials — a central variable in pump sizing. The mineracao cluster near Sítio Novo do Tocantins brings applications such as process-water booster, slurry pumping, pit dewatering and tailings dam services — a repertoire FB Bombas serves with dedicated series and field-validated materials.
1970 km separate the Cabreúva-SP factory from Sítio Novo do Tocantins via BR-153 Rodovia Belém-Brasília (via GO) — an axis sized for movement of pumps, skids and pump-and-motor sets. Alternative routing to Sítio Novo do Tocantins can use BR-153, BR-010 and BR-242, which helps in heavy-traffic situations or maintenance on specific roads. For Sítio Novo do Tocantins, FB dispatch is preceded by: hydrostatic test at 1.5× design pressure, performance run with curve points, G2.5 dynamic balancing and Data Book closure — all traceable by serial number.
For projects in Sítio Novo do Tocantins, talk to FB engineering: technical analysis of the duty point, series and materials recommendation, hydraulic-test scope and Data Book. Direct service.
Talk to engineeringFor over 82 years, we have manufactured industrial pumps in Cabreúva-SP. From north to south, we serve the country's main industrial hubs with gear (FBE/FBEI) and centrifugal (FBCN/FBOT) pumps — engineered, machined and assembled in our own manufacturing facility.
Our engineering team sizes each pump for the customer's actual application, with bench testing before shipping. This technical rigor — combined with direct support from our team — is what has sustained the trust of groups like Petrobras, Vale and CSN for generations.

What changes when the pump comes straight from the manufacturer: engineering, stock and logistics under one roof in Cabreúva-SP.
Technical support across all 27 Brazilian states, from inland regions to major industrial capitals.
Nationwide deliveries through partner carrier network with optimized lead times.
Technical team available for sizing, project work and after-sales support across any region.
Original spare parts for the FBE, FBEI, FBCN and FBOT series stocked at our own factory, ready to ship.
Own factory in Cabreúva/SP with full production capability, serving Sítio Novo do Tocantins and all of Brazil

Engineering, CNC machining and assembly — all integrated in our Cabreúva/SP factory.

We size and build complete systems, ready for installation at your industrial plant.

We keep original parts in stock for all series, ensuring continuity of your operation.

Production line with centrifugal and gear pumps assembled and tested in our manufacturing plant.
FB Bombas serves Sítio Novo do Tocantins and the entire Tocantins region with gear pumps (internal & external) and centrifugal pumps for your industrial application. Request a quote and receive a personalized proposal.
Request QuoteFour catalog series, fire-fighting systems and engineered-to-order — in-house manufacturing and hydrostatic testing on 100% of pumps
Our technical team is ready to develop the ideal solution for your application
Contact Us
Our manufacturing plant in Cabreúva-SP integrates engineering, CNC machining and assembly under one roof. Every pump is validated through bench testing before reaching the customer — ensuring it ships ready for real application.
Present in the largest industrial projects in Brazil and Latin America









See specific solutions for Sítio Novo do Tocantins
Brazilian sectors for which FB Bombas sizes equipment — complete technical guides per application.
FB Bombas serves Sítio Novo do Tocantins and neighboring municipalities with the same technical team — optimized visits and supply in joint campaigns.
Beyond Sítio Novo do Tocantins, FB Bombas supplies the FBCN series for agronegócio plants across multiple Brazilian cities — shared technical repertoire, field-validated materials and traceable Data Book on every project.
FB Bombas' rotating set balancing follows ISO 21940 G2.5 — a grade equivalent to the API 610 requirement for heavy-duty service. It is the level demanded in critical Sítio Novo do Tocantins projects: continuous regime, plants with online vibration monitoring or operations where unplanned downtime is expensive. Above 3,600 RPM or with rotating mass beyond 50 kg, balancing is done on two planes, with a piezoelectric sensor.
Yes. The FAT (Factory Acceptance Test) is executed on the factory bench in Cabreúva/SP, with hydraulic test, characteristic-curve measurement (Q × H), hydraulic efficiency, NPSHr and ISO 10816 vibration — witnessed by customer inspection when specified. For projects in Sítio Novo do Tocantins, the SAT (Site Acceptance Test) is supported by application engineering during commissioning, with startup checklist, laser alignment and baseline vibration-signature capture.
Yes. ASME B73.1 dimensional compliance — the North American standard for horizontal end-suction process centrifugal pumps — is a feature of the FBCN series and enables retrofit on existing baseplates in Sítio Novo do Tocantins plants, regardless of which brand occupied the base, provided the designation coincides. Shaft, suction/discharge flanges, casing feet and impeller centerline obey the standard, so the new pump takes the position without touching piping or baseplate.
Yes. A complete technical Data Book accompanies each FB Bombas pump that reaches Sítio Novo do Tocantins: hydraulic test certificate, material certificates (stainless steel, duplex and ductile cast iron per spec), ISO 21940 G2.5 balancing report, characteristic curve measured on the test bench, API 682 mechanical-seal data sheets, operation and maintenance manual and as-built drawings. The unit serial number traces all this documentation.
It does. The standard used is ISO 10816, with velocity RMS in mm/s, and the diagnosis — conducted by FB Bombas application engineering — identifies misalignment, imbalance, bearing defects and cavitation on pumps operating in Sítio Novo do Tocantins. At startup the baseline is captured; in PM campaigns, spectral comparison is performed; and interventions (re-balancing, bearing replacement, laser alignment) are recommended before vibration enters zone D.
Coverage against manufacturing defects accompanies the supply of FB pumps — the full terms appear in the commercial proposal. It holds as long as installation, operation and maintenance follow what the manual specifies and the sizing performed by engineering. Our technical team clarifies the specific conditions of your project in Sítio Novo do Tocantins.
Three fluid fronts are covered by the FB series. FBE: mineral and synthetic oils, asphalt (CAP), BPF fuel oils, petroleum derivatives, molasses, resins, viscous chemical and hydraulic products. FBCN: raw and treated water, process fluids and industrial effluents. FBOT: thermal oil at elevated temperatures. Fluid viscosity, temperature and chemical compatibility guide the sizing of every application.
Shipment is by road via BR-153 Rodovia Belém-Brasília (via GO), with industrial packaging suited to the journey and tracking until delivery. Sizing, proposal and technical support run in parallel through remote channels — distance does not change the engineering scope, only the logistics planning, reflected in the proposal schedule.
Yes. Existing installations can undergo retrofit with FB Bombas — the scope covers seal upgrades, swapping worn components, adaptation for new fluids and hydraulic performance gains. A technical report on the current installation serves as the basis for the assessment.
Yes. FB Bombas offers technical training for operations and maintenance teams in Sítio Novo do Tocantins, with modules on: sizing and reading the characteristic curve, identifying cavitation through NPSH, mechanical-seal troubleshooting, laser alignment, ISO 10816 vibration analysis and PM (preventive maintenance) practice with bearing and wear-ring replacement. Training can be delivered at the customer plant or at the Cabreúva/SP factory, in person or hybrid.
Fill out the form and our technical team will contact you to size the ideal pump — gear (FBE/FBEI) or centrifugal (FBCN/FBOT).