Technical summary
In Praia Grande, São Paulo, FBCN covers turismo with ASME B73.1 normalized hydraulics — direct dimensional interchangeability with market references. Cabreúva-SP (107 km), 24-48h lead time.


Operations in turismo, comércio dominate the local production profile, defining the typical fluid catalogue and the FB series recommended for each application. In Praia Grande, FB Bombas serves projects with in-house application engineering: system-curve analysis, NPSH balance (available vs required), series selection (FBE / FBCN / FBOT / FBEI / FBFS) and API 682 sealing plan. FB Bombas is the national industrial-pump manufacturer serving Praia Grande (SP) with direct factory service from Cabreúva-SP. For turismo — the dominant industrial calling of Praia Grande — we recommend the FBE, FBCN, FBOT and FBEI series, with field-validated materials, cartridge mechanical seal and characteristic curve certified on an hydraulic bench. Within IBGE mesoregion Metropolitana de São Paulo, Praia Grande shares economic context with adjacent municipalities, shaping typical pump specifications and the frequency of synchronized maintenance campaigns. Praia Grande is served by the SP-300 Rodovia Marechal Rondon (via Rodoanel SP-021) axis and also by highways SP-300, SP-021, SP-330, BR-116 and BR-374 for heavy-cargo movement — relevant for delivery of mounted skids and large pump-and-motor sets. FB Bombas pumps installed in Praia Grande, São Paulo meet CRCC Petrobras certification, ASME B73.1 (centrifugal) and API 676 (gear) compliance — credentials FB has sustained as a Brazilian manufacturer since 1944. Just 9 km separate Praia Grande from the port cluster of Santos — a distance that enables joint technical visits and dilution of mobilization cost across multiple customers. Cabreúva-SP → Praia Grande (107 km via SP-300 Rodovia Marechal Rondon (via Rodoanel SP-021)): origin of FB manufacturing since 1944, with vertical integration on a single site — CNC machining, assembly hydraulic bench and ISO 21940 G2.5 balancing — every unit ships with a traceable Data Book.
Operations in turismo, comércio dominate the local production profile, defining the typical fluid catalogue and the FB series recommended for each application. In Praia Grande, FB Bombas serves projects with in-house application engineering: system-curve analysis, NPSH balance (available vs required), series selection (FBE / FBCN / FBOT / FBEI / FBFS) and API 682 sealing plan. FB Bombas is the national industrial-pump manufacturer serving Praia Grande (SP) with direct factory service from Cabreúva-SP. For turismo — the dominant industrial calling of Praia Grande — we recommend the FBE, FBCN, FBOT and FBEI series, with field-validated materials, cartridge mechanical seal and characteristic curve certified on an hydraulic bench. Within IBGE mesoregion Metropolitana de São Paulo, Praia Grande shares economic context with adjacent municipalities, shaping typical pump specifications and the frequency of synchronized maintenance campaigns. Praia Grande is served by the SP-300 Rodovia Marechal Rondon (via Rodoanel SP-021) axis and also by highways SP-300, SP-021, SP-330, BR-116 and BR-374 for heavy-cargo movement — relevant for delivery of mounted skids and large pump-and-motor sets. FB Bombas pumps installed in Praia Grande, São Paulo meet CRCC Petrobras certification, ASME B73.1 (centrifugal) and API 676 (gear) compliance — credentials FB has sustained as a Brazilian manufacturer since 1944. Just 9 km separate Praia Grande from the port cluster of Santos — a distance that enables joint technical visits and dilution of mobilization cost across multiple customers. Cabreúva-SP → Praia Grande (107 km via SP-300 Rodovia Marechal Rondon (via Rodoanel SP-021)): origin of FB manufacturing since 1944, with vertical integration on a single site — CNC machining, assembly hydraulic bench and ISO 21940 G2.5 balancing — every unit ships with a traceable Data Book.

Years
Certified
Warranty
Direct answer for industrial projects — recommended series, standards compliance and logistics.
In Praia Grande, São Paulo, FBCN covers turismo with ASME B73.1 normalized hydraulics — direct dimensional interchangeability with market references. Cabreúva-SP (107 km), 24-48h lead time.
Operations in turismo, comércio dominate the local production profile, defining the typical fluid catalogue and the FB series recommended for each application. In Praia Grande, FB Bombas serves projects with in-house application engineering: system-curve analysis, NPSH balance (available vs required), series selection (FBE / FBCN / FBOT / FBEI / FBFS) and API 682 sealing plan. FB Bombas is the national industrial-pump manufacturer serving Praia Grande (SP) with direct factory service from Cabreúva-SP. For turismo — the dominant industrial calling of Praia Grande — we recommend the FBE, FBCN, FBOT and FBEI series, with field-validated materials, cartridge mechanical seal and characteristic curve certified on an hydraulic bench. Within IBGE mesoregion Metropolitana de São Paulo, Praia Grande shares economic context with adjacent municipalities, shaping typical pump specifications and the frequency of synchronized maintenance campaigns. Praia Grande is served by the SP-300 Rodovia Marechal Rondon (via Rodoanel SP-021) axis and also by highways SP-300, SP-021, SP-330, BR-116 and BR-374 for heavy-cargo movement — relevant for delivery of mounted skids and large pump-and-motor sets. FB Bombas pumps installed in Praia Grande, São Paulo meet CRCC Petrobras certification, ASME B73.1 (centrifugal) and API 676 (gear) compliance — credentials FB has sustained as a Brazilian manufacturer since 1944. Just 9 km separate Praia Grande from the port cluster of Santos — a distance that enables joint technical visits and dilution of mobilization cost across multiple customers. Cabreúva-SP → Praia Grande (107 km via SP-300 Rodovia Marechal Rondon (via Rodoanel SP-021)): origin of FB manufacturing since 1944, with vertical integration on a single site — CNC machining, assembly hydraulic bench and ISO 21940 G2.5 balancing — every unit ships with a traceable Data Book.
In utilities and continuous process in Praia Grande, the standardized centrifugal standardizes the fleet: 53 models with bench-tested curves cover the flow × head grid, and the same construction philosophy simplifies spares inventory across sizes — fewer critical items, more availability. Sitting in the technical context of a portuario cluster, Praia Grande benefits from accumulated learning around bunker fuel oil (BPF), seawater for cooling and liquid bulk movement. In Praia Grande, ASME B73.1 for horizontal normalized centrifugal pumps — consolidated market standard are the applicable references — easing approval at commissioning and during technical audits. Lead time for critical parts to Praia Grande is typically 24-48h — a function of distance (107 km) and the available road modal.
The demand profile in Praia Grande reflects medium density — regular and predictable opportunity pipeline. Typical seasonality of the portuario cluster (continuous flow with seasonality tied to agricultural harvests (bulk) and fuel supply) directly impacts supply scheduling and PMs in Praia Grande. Praia Grande has a services-oriented economy (68% of value added, IBGE 2021; 2023 GDP of R$ 11.4 billion) — in this profile, typical projects involve centrifugals for utilities, reservoirs and fire networks, with the FBCN as the reference series. In Praia Grande, turismo plants concentrate recurring demand for centrifugal pumps for utilities and positive-displacement pumps for viscous fluids. Cities adjacent to Praia Grande belong to recognized industrial clusters, creating a regional demand ecosystem where spare parts and technical visits can be optimized through joint campaigns. Due to proximity to the portuario cluster, Praia Grande shares a technical agenda with bunker (BPF fuel oil), marine cooling water and liquid-bulk discharge — a direct path to series and materials selection. Praia Grande among the 50 most populous cities in SP, maintains a relevant industrial base — a scale that translates into regular demand for rotating equipment.
Cabreúva-SP → Praia Grande via SP-300 Rodovia Marechal Rondon (via Rodoanel SP-021) (107 km): a corridor with regular FB freight history, supporting indivisible loads and sets with escort when the gauge demands. For Praia Grande, 12-24h via direct road modal is the standard contractual transit window — compressible via emergency air modal for critical parts, on specific demand. The SP-300, SP-021, SP-330, BR-116 and BR-374 mesh provides logistics redundancy for Praia Grande — when one route is restricted (rains, construction, accidents), delivery is rerouted without compromising the critical lead time. For Praia Grande, FB service follows the in-person technical visits with rapid mobilization — Cabreúva → customer route in a few hours model — application engineers conduct pre-scheduled visits while remote support via documentation and phone covers point queries.
FB engineers serve Praia Grande for the FBCN series with a sized proposal — duty point, fluid, field conditions and supply lead time.
Talk to engineeringFor over 82 years, we have manufactured industrial pumps in Cabreúva-SP. From north to south, we serve the country's main industrial hubs with gear (FBE/FBEI) and centrifugal (FBCN/FBOT) pumps — engineered, machined and assembled in our own manufacturing facility.
Our engineering team sizes each pump for the customer's actual application, with bench testing before shipping. This technical rigor — combined with direct support from our team — is what has sustained the trust of groups like Petrobras, Vale and CSN for generations.

What changes when the pump comes straight from the manufacturer: engineering, stock and logistics under one roof in Cabreúva-SP.
Technical support across all 27 Brazilian states, from inland regions to major industrial capitals.
Nationwide deliveries through partner carrier network with optimized lead times.
Technical team available for sizing, project work and after-sales support across any region.
Original spare parts for the FBE, FBEI, FBCN and FBOT series stocked at our own factory, ready to ship.
Own factory in Cabreúva/SP with full production capability, serving Praia Grande and all of Brazil

Engineering, CNC machining and assembly — all integrated in our Cabreúva/SP factory.

We size and build complete systems, ready for installation at your industrial plant.

We keep original parts in stock for all series, ensuring continuity of your operation.

Production line with centrifugal and gear pumps assembled and tested in our manufacturing plant.
FB Bombas serves Praia Grande and the entire São Paulo region with gear pumps (internal & external) and centrifugal pumps for your industrial application. Request a quote and receive a personalized proposal.
Request QuoteComplete pumping solutions for all industrial needs
Our technical team is ready to develop the ideal solution for your application
Contact Us
Our manufacturing plant in Cabreúva-SP integrates engineering, CNC machining and assembly under one roof. Every pump is validated through bench testing before reaching the customer — ensuring it ships ready for real application.
Present in the largest industrial projects in Brazil and Latin America
See specific solutions for Praia Grande
Brazilian sectors for which FB Bombas sizes equipment — complete technical guides per application.
Regional service from Praia Grande — same series, same factory in Cabreúva/SP.
Yes. On the factory bench in Cabreúva/SP the FAT (Factory Acceptance Test) is carried out: hydraulic test with characteristic-curve measurement (Q × H), hydraulic efficiency, NPSHr and ISO 10816 vibration — witnessed by customer inspection when specified. The SAT (Site Acceptance Test) on Praia Grande projects counts on application engineering during commissioning, including startup checklist, laser alignment and recording of the baseline vibration signature.
Yes. FB Bombas offers technical training for operations and maintenance teams in Praia Grande, with modules on: sizing and reading the characteristic curve, identifying cavitation through NPSH, mechanical-seal troubleshooting, laser alignment, ISO 10816 vibration analysis and PM (preventive maintenance) practice with bearing and wear-ring replacement. Training can be delivered at the customer plant or at the Cabreúva/SP factory, in person or hybrid.
Yes. Existing installations can undergo retrofit with FB Bombas — the scope covers seal upgrades, swapping worn components, adaptation for new fluids and hydraulic performance gains. A technical report on the current installation serves as the basis for the assessment.
Three fluid fronts are covered by the FB series. FBE: mineral and synthetic oils, asphalt (CAP), BPF fuel oils, petroleum derivatives, molasses, resins, viscous chemical and hydraulic products. FBCN: raw and treated water, process fluids and industrial effluents. FBOT: thermal oil at elevated temperatures. Fluid viscosity, temperature and chemical compatibility guide the sizing of every application.
Four families are manufactured in Cabreúva/SP: external gear FBE and internal gear FBEI for viscous fluids, standardized centrifugal FBCN for low-viscosity liquids and FBOT for thermal oil circuits up to 350 °C. Fire-fighting systems per NFPA 20 / NBR 16704 complete the line.
Application engineering starts from four variables — flow, differential pressure, temperature and viscosity — and refines with available NPSH, duty cycle and chemical compatibility. The study is free for customers in Praia Grande and results in the exact model recommendation, not a generic family.
They are. For each delivery to Praia Grande, FB Bombas assembles the unit's complete technical Data Book, containing: hydraulic test certificate, material certificates — stainless steel, duplex or ductile cast iron, per spec —, ISO 21940 G2.5 balancing report, characteristic curve obtained on the bench, API 682 mechanical-seal data sheets, operation and maintenance manual and as-built drawings. Full traceability happens through the serial number.
The 107 km distance via SP-300 Rodovia Marechal Rondon (via Rodoanel SP-021) shortens everything: more economical freight, faster delivery and easier on-site technical visits for critical projects. During maintenance shutdowns, proximity to Cabreúva/SP cuts the time between the call and the part on site.
Manufacturing in Brazil since 1944, FB Bombas delivers shorter lead times — with no import dependency —, direct technical support from FB engineering, in-house manufactured replacement parts, local-currency pricing free of exchange rate exposure, and on-site service for projects in Praia Grande and surrounding areas.
Yes. For projects in Praia Grande, on-site technical visits by application engineers can be scheduled for process data collection, diagnosis of existing installations and commissioning support. Geographic proximity makes this operation agile and recurring.
Praia Grande is recognized as an important industrial hub in the region, with emphasis on turismo and comércio. FB Bombas offers specialized service for local industries.
Fill out the form and our technical team will contact you to size the ideal pump — gear (FBE/FBEI) or centrifugal (FBCN/FBOT).