Technical summary
For local industry in Cedro, Pernambuco, FB Bombas sizes FBEI, FBCN series from its Cabreúva-SP factory (1928 km). ASME B73.1 standardization, hydraulic testing, Petrobras CRCC and 96h to 7 days logistics lead time.


Gear pumps (internal & external) and centrifugal pumps manufactured in Cabreúva/SP. Serving Cedro and region — factory 1918km away. Technical response within 24h.
Gear pumps (internal & external) and centrifugal pumps manufactured in Cabreúva/SP. Serving Cedro and region — factory 1918km away. Technical response within 24h.

Years
Compliant
Tested
Direct answer for industrial projects — recommended series, standards compliance and logistics.
For local industry in Cedro, Pernambuco, FB Bombas sizes FBEI, FBCN series from its Cabreúva-SP factory (1928 km). ASME B73.1 standardization, hydraulic testing, Petrobras CRCC and 96h to 7 days logistics lead time.
In Cedro, Pernambuco, FB Bombas serves local industry projects with the FBE, FBCN, FBOT and FBEI series — dedicated application engineering for sizing against the actual system curve, CRCC Petrobras certification and technical compliance with ASME B73.1 (centrifugal), API 676 (gear) and NFPA 20 / NBR 16704 (fire fighting). Industrial plants in Cedro rely on FB Bombas spares held in scheduled stock: semi-open and open impellers, wear rings in various materials, dual cartridge seals API 682 Plan 53 and SKF/FAG bearings per the original spec. The fluid roster in Cedro (óleos industriais and água industrial) demands attention to viscosity, operating temperature and chemical compatibility — variables that FB application engineering uses to recommend the proper series. For the Cedro, Pernambuco market, FB Bombas offers industrial pumps with certified hydraulic tests, ASME B73.1 (dimensional interchangeability) and a traceable Data Book per unit — a technical package that shortens the customer homologation cycle. The industrial district cluster of Maracanau is 433 km from Cedro, generating economic spillover and correlated technical demand — common in pumping projects involving both cities. Within IBGE mesoregion Sertão Pernambucano, Cedro shares economic context with adjacent municipalities, shaping typical pump specifications and the frequency of synchronized maintenance campaigns. Cabreúva-SP → Cedro (1928 km via BR-101 (via AL)): origin of FB manufacturing since 1944, with vertical integration on a single site — CNC machining, assembly hydraulic bench and ISO 21940 G2.5 balancing — every unit ships with a traceable Data Book.
In Cedro, FBEI and FBCN cover the technical range observed in the field — from primary transfer and circulation to replacing an installed pump carrying the same ASME B73.1 dimensional designation. Cedro: transferência geral and utilidades. This application mix is covered by the recommended FB series, with case-by-case fine tuning. Cedro: óleos industriais and água industrial suggest materials such as austenitic stainless steels (AISI 304/316) with attention to thermal expansion — a choice impacting both durability and cost of the pump-and-motor set. Cedro is served with a logistics lead time of 96h to 7 days for critical parts from Cabreúva-SP, subject to case-by-case optimization.
Cedro: low fluid complexity, lean fluid roster — technical operation focused on few main vectors. Cedro: medium density — regular and predictable opportunity pipeline — a variable influencing commercial strategy and service logistics. A GDP of R$ 134 million (IBGE, 2023) with a services profile (23.1% of value added in 2021) places Cedro's local demand in the utilities field: building pressurization, light process water and fire-fighting systems. Working with óleos industriais and água industrial in Cedro demands attention to viscosity at operating temperature, residual abrasiveness and chemical compatibility — criteria FB engineering applies on every project. Due to proximity to the distrito-industrial cluster, Cedro shares a technical agenda with diverse applications — specialty chemicals, hydraulic oils, purified water and thermal oils — a direct path to series and materials selection. In Cedro, series FBEI for transferência geral and series FBCN for utilidades — a combination that covers the typical local industrial demand.
The BR-101 (via AL) corridor (1928 km) is the logistics spine for FB deliveries to Cedro — a factor entering FOB pricing and the commissioning lead-time curve. 72h to 7 days, depending on modal and dry season: this is the typical delivery interval Cabreúva-SP → Cedro, based on a consolidated road route and FB-qualified logistics operators. The factory-to-Cedro dispatch includes technical packaging (impact protection, moisture sealing), multilingual documentation (PT/EN/ES when required) and approved-carrier tracking.
Technical inquiry for Cedro: the FB Bombas team evaluates operating regime, fluid, available NPSH and construction configurations — return with a sized proposal within 3-5 business days.
Talk to engineeringFor over 82 years, we have manufactured industrial pumps in Cabreúva-SP. From north to south, we serve the country's main industrial hubs with gear (FBE/FBEI) and centrifugal (FBCN/FBOT) pumps — engineered, machined and assembled in our own manufacturing facility.
Our engineering team sizes each pump for the customer's actual application, with bench testing before shipping. This technical rigor — combined with direct support from our team — is what has sustained the trust of groups like Petrobras, Vale and CSN for generations.

What changes when the pump comes straight from the manufacturer: engineering, stock and logistics under one roof in Cabreúva-SP.
Technical support across all 27 Brazilian states, from inland regions to major industrial capitals.
Nationwide deliveries through partner carrier network with optimized lead times.
Technical team available for sizing, project work and after-sales support across any region.
Original spare parts for the FBE, FBEI, FBCN and FBOT series stocked at our own factory, ready to ship.
Own factory in Cabreúva/SP with full production capability, serving Cedro and all of Brazil

Engineering, CNC machining and assembly — all integrated in our Cabreúva/SP factory.

We size and build complete systems, ready for installation at your industrial plant.

We keep original parts in stock for all series, ensuring continuity of your operation.

Production line with centrifugal and gear pumps assembled and tested in our manufacturing plant.
FB Bombas serves Cedro and the entire Pernambuco region with gear pumps (internal & external) and centrifugal pumps for your industrial application. Request a quote and receive a personalized proposal.
Request QuoteFour catalog series, fire-fighting systems and engineered-to-order — in-house manufacturing and hydrostatic testing on 100% of pumps
Our technical team is ready to develop the ideal solution for your application
Contact Us
Our manufacturing plant in Cabreúva-SP integrates engineering, CNC machining and assembly under one roof. Every pump is validated through bench testing before reaching the customer — ensuring it ships ready for real application.
Present in the largest industrial projects in Brazil and Latin America









See specific solutions for Cedro
Brazilian sectors for which FB Bombas sizes equipment — complete technical guides per application.
FB Bombas serves Cedro and neighboring municipalities with the same technical team — optimized visits and supply in joint campaigns.
It is. A Brazilian manufacturer since 1944, FB Bombas runs its factory in Cabreúva/SP and keeps a technical team focused on projects in Cedro. Across the duty ranges currently held by imported lines, the FBCN (centrifugal), FBE/FBEI (gear) and FBOT (thermal oil) series offer equivalent coverage, with better lead times by dispensing with imports, factory-direct technical support, spare parts for FB pumps and Portuguese-speaking application engineering. On a normalized pump, the existing baseplate is preserved when the ASME B73.1 dimension designation matches — which the standard makes independent of the installed brand.
Yes. The FBCN series complies with ASME B73.1 (North American standard for horizontal end-suction process centrifugal pumps) — which enables retrofit on existing baseplates in Cedro plants, whoever manufactured the installed unit, provided the dimension designation matches. Shaft dimensions, suction/discharge flanges, casing feet and impeller centerline follow the standard: the complete FBCN pump goes in and piping and baseplate stay put.
ISO 21940 G2.5 is the grade applied to the rotating set of FB Bombas pumps — direct equivalence with what API 610 asks for heavy-duty service. Critical projects in Cedro depend on this standard: continuous-regime operation, online vibration monitoring at the plant or high cost tied to unplanned downtime. When rotation exceeds 3,600 RPM or rotating mass goes over 50 kg, two-plane balancing is executed using a piezoelectric sensor.
Yes — with a structural advantage: since the FBE, FBEI, FBCN and FBOT series are manufactured entirely in Brazil, parts ship from the factory itself in Cabreúva/SP, with short lead times for planned shutdowns and priority handling for emergencies. The direct effect is a lower total cost of ownership.
Four families are manufactured in Cabreúva/SP: external gear FBE and internal gear FBEI for viscous fluids, standardized centrifugal FBCN for low-viscosity liquids and FBOT for thermal oil circuits up to 350 °C. Fire-fighting systems per NFPA 20 / NBR 16704 complete the line.
Manufacturing in Brazil since 1944, FB Bombas delivers shorter lead times — with no import dependency —, direct technical support from FB engineering, in-house manufactured replacement parts, local-currency pricing free of exchange rate exposure, and on-site service for projects in Cedro and surrounding areas.
Yes. As a Brazilian manufacturer accredited in FINAME — the BNDES Special Industrial Financing Agency —, FB Bombas qualifies equipment supplied to Cedro for BNDES Finame financing lines (Industrial Working Capital, Modernization, Capital Goods), with preferential conditions for national industry. On the technical proposal, the commercial team includes the product's FINAME code to enter the customer's financial plan.
Yes, provided the dimension designation coincides. By following ASME B73.1 — the North American dimensional standard for end-suction process pumps — the FBCN occupies the standardised installation envelope defined by the norm, which does not depend on who built the pump running in Cedro plants. What is supplied is the complete pump: baseplate, suction/discharge piping and foundations usually remain. FB application engineering runs the dimensional gap analysis before supply, covering flow, head and required NPSH as well.
In Cedro, service comes directly from the factory in Cabreúva/SP, through the FB Bombas team. The customer speaks with application engineering for sizing, receives the complete technical quotation within 3-5 business days and buys original parts at factory pricing. When project criticality warrants it, on-site technical visits to Cedro are scheduled.
It does. FB Bombas' technical training program for operators and maintainers in Cedro covers: characteristic-curve reading and sizing, cavitation identified via NPSH, mechanical-seal troubleshooting, laser alignment, vibration analyzed per ISO 10816 and preventive maintenance (PM) practice, including bearing and wear-ring replacement. Location and format are flexible — customer plant or the Cabreúva/SP factory, in person or hybrid.
Fill out the form and our technical team will contact you to size the ideal pump — gear (FBE/FBEI) or centrifugal (FBCN/FBOT).