How can I request a pump vibration assessment in Lobato?
Send the series and model of the pump installed, the operating conditions and the available vibration records; the standard, measurement points and limits are defined for the assembly, with no single limit for every pump.
Check the alignment first: the FBEI (MAN001-10) and FBME (MSERV-08/01) manuals identify pump-to-motor misalignment as a source of vibration and premature wear and call for realignment after final installation, because transport usually misaligns the set, which leaves the factory pre-aligned. The stated tolerance is under 0.05 mm radial and 0.6° angular, according to the coupling supplier.
What is the warranty on FB Bombas pumps?
Warranty conditions are defined in the proposal and contract and vary with the series, operating conditions and agreement. The manuals state what can void it. Under the FBEI manual (MAN001-10), operating with a different fluid or outside the pump’s data sheets and certified documents without FB Bombas’ written authorization voids the warranty.
Under the FBME service manual (MSERV-08/01), after parts are replaced, the operating and performance warranty applies only with original parts and FB Bombas’ consent. For the project, confirm the conditions in the quotation.
How can I check pump stock for Lobato?
FBE pumps from 1/8″ to 4″ are kept in stock at the factory, in every configuration and option; for the FBE 5″ and 6″ and the other series, our team confirms availability together with pricing.
What certifications does FB Bombas hold?
FB Bombas reports a registration in the Petrobras supplier registry. Petrobras issues the Certificado de Registro Cadastral (CRC), which replaces the former CRCC, to suppliers that meet one or more criteria of the supply family of interest; it is a supplier registration, not a product certification. Validity and supply families must be checked on the current certificate, provided on request.
What is the advantage of buying from a national manufacturer like FB Bombas?
FB Bombas serves projects from its factory, with direct engineering support and parts supply for its equipment. Availability, lead time, transport and on-site service are assessed according to the request. Its industrial pump manufacturing history began in 1944.
What is the balancing grade of FB Bombas pumps for critical projects in Lobato?
For FBME, the impeller is statically and dynamically balanced to grade G6.3 (MSERV-08/01, item 12.2). FB Bombas does not publish a grade in the other series documents; for them and for critical projects, specify the required standard, grade and report in the purchase scope. Impeller balancing alone does not guarantee the vibration level of the installation.
How can I check whether an FBCN can replace the centrifugal pump installed in Lobato?
FB Bombas supplies the complete FBCN and checks, model by model, the dimensions in manual MTEC-03/00 (baseplate, nozzles, flanges and shaft) and the duty point before the order. Mechanical construction follows ASME B73.1 (MTEC-03/00); dimensional interchangeability with the existing pump is not assumed and is confirmed on the drawing.
Send the identification and drawing of the pump installed, with flow, head, fluid, materials and drive.
Does FB Bombas manufacture custom pumps?
Yes, in the five Custom Solutions categories: custom complete motor-pump assembly, mobile industrial kit, industrial pump skid, retrofit with a new FB Bombas pump in place of the installed one, and special materials projects. The scope of each project is defined with engineering before manufacture.
How to request a technical quote for industrial pumps in Lobato?
Send the application, fluid, temperature and available flow, pressure or head data. For replacement, add the equipment model, identification and drawing. Also state the destination and purchase documentation requirements. The team confirms any additional data needed and the technical and commercial proposal scope.
How do I contact FB Bombas’ technical team?
Use WhatsApp +55 11 97287-4837, telephone +55 11 4898-9200, comercial@fbbombas.com.br or the website form. To help the team, describe the application, project destination and any pump data already available.