Technical summary
FBCN centrifugal pumps (FB Bombas) in Trairão, Pará: sized for local industry, flow up to 2,200 m³/h, ASME B73.1 compliance. Cabreúva-SP at 2288 km, typical critical-parts lead time: 96h to 7 days.


For Trairão, FB Bombas offers retrofit of existing baseplates — the FBCN centrifugal follows ASME B73.1, whose dimension designation is common to the entire installed normalized fleet, whoever the original manufacturer was. The mining cluster of Oriximina is 313 km from Trairão, generating economic spillover and correlated technical demand — common in pumping projects involving both cities. The fluid roster in Trairão (óleos industriais and água industrial) demands attention to viscosity, operating temperature and chemical compatibility — variables that FB application engineering uses to recommend the proper series. Logistically, the city connects to Cabreúva-SP via BR-010 / BR-153 Rodovia Belém-Brasília, complemented by alternatives BR-010, BR-153, BR-316 and BR-230 — a network that supports technical service within tight operational windows. Trairão, Pará is territory where FB Bombas operates as a Brazilian industrial-pump manufacturer with 82 years of continuous operation. For the local industry industrial profile dominating the region, we offer the FBE, FBCN, FBOT and FBEI series with CRCC Petrobras qualification, API 676 compliance and ASME B73.1 normalization (API 610 engineered-to-order projects) — basis for retrofit in plants with global manufacturers already installed. The city sits within the IBGE mesoregion Sudoeste Paraense, a regional grouping of municipalities with similar economic and logistics profiles — useful for comparative analysis and technical-visit routing. Cabreúva-SP → Trairão (2288 km via BR-010 / BR-153 Rodovia Belém-Brasília): origin of FB manufacturing since 1944, with vertical integration on a single site — CNC machining, assembly hydraulic bench and ISO 21940 G2.5 balancing — every unit ships with a traceable Data Book.
For Trairão, FB Bombas offers retrofit of existing baseplates — the FBCN centrifugal follows ASME B73.1, whose dimension designation is common to the entire installed normalized fleet, whoever the original manufacturer was. The mining cluster of Oriximina is 313 km from Trairão, generating economic spillover and correlated technical demand — common in pumping projects involving both cities. The fluid roster in Trairão (óleos industriais and água industrial) demands attention to viscosity, operating temperature and chemical compatibility — variables that FB application engineering uses to recommend the proper series. Logistically, the city connects to Cabreúva-SP via BR-010 / BR-153 Rodovia Belém-Brasília, complemented by alternatives BR-010, BR-153, BR-316 and BR-230 — a network that supports technical service within tight operational windows. Trairão, Pará is territory where FB Bombas operates as a Brazilian industrial-pump manufacturer with 82 years of continuous operation. For the local industry industrial profile dominating the region, we offer the FBE, FBCN, FBOT and FBEI series with CRCC Petrobras qualification, API 676 compliance and ASME B73.1 normalization (API 610 engineered-to-order projects) — basis for retrofit in plants with global manufacturers already installed. The city sits within the IBGE mesoregion Sudoeste Paraense, a regional grouping of municipalities with similar economic and logistics profiles — useful for comparative analysis and technical-visit routing. Cabreúva-SP → Trairão (2288 km via BR-010 / BR-153 Rodovia Belém-Brasília): origin of FB manufacturing since 1944, with vertical integration on a single site — CNC machining, assembly hydraulic bench and ISO 21940 G2.5 balancing — every unit ships with a traceable Data Book.

Years
Compliant
Tested
Direct answer for industrial projects — recommended series, standards compliance and logistics.
FBCN centrifugal pumps (FB Bombas) in Trairão, Pará: sized for local industry, flow up to 2,200 m³/h, ASME B73.1 compliance. Cabreúva-SP at 2288 km, typical critical-parts lead time: 96h to 7 days.
For Trairão, FB Bombas offers retrofit of existing baseplates — the FBCN centrifugal follows ASME B73.1, whose dimension designation is common to the entire installed normalized fleet, whoever the original manufacturer was. The mining cluster of Oriximina is 313 km from Trairão, generating economic spillover and correlated technical demand — common in pumping projects involving both cities. The fluid roster in Trairão (óleos industriais and água industrial) demands attention to viscosity, operating temperature and chemical compatibility — variables that FB application engineering uses to recommend the proper series. Logistically, the city connects to Cabreúva-SP via BR-010 / BR-153 Rodovia Belém-Brasília, complemented by alternatives BR-010, BR-153, BR-316 and BR-230 — a network that supports technical service within tight operational windows. Trairão, Pará is territory where FB Bombas operates as a Brazilian industrial-pump manufacturer with 82 years of continuous operation. For the local industry industrial profile dominating the region, we offer the FBE, FBCN, FBOT and FBEI series with CRCC Petrobras qualification, API 676 compliance and ASME B73.1 normalization (API 610 engineered-to-order projects) — basis for retrofit in plants with global manufacturers already installed. The city sits within the IBGE mesoregion Sudoeste Paraense, a regional grouping of municipalities with similar economic and logistics profiles — useful for comparative analysis and technical-visit routing. Cabreúva-SP → Trairão (2288 km via BR-010 / BR-153 Rodovia Belém-Brasília): origin of FB manufacturing since 1944, with vertical integration on a single site — CNC machining, assembly hydraulic bench and ISO 21940 G2.5 balancing — every unit ships with a traceable Data Book.
Trairão is served with a logistics lead time of 96h to 7 days for critical parts from Cabreúva-SP, subject to case-by-case optimization. Sitting in the technical context of a mineracao cluster, Trairão benefits from accumulated learning around diluted slurries, process water with abrasive solids and slurry pumps when applicable. Trairão typically calls for FBEI and FBCN — an initial recommendation based on local productFit, dominant industrial cluster and identified fluid profile; final technical approval is refined by application engineering. In utilities and continuous process in Trairão, the standardized centrifugal standardizes the fleet: 53 models with bench-tested curves cover the flow × head grid, and the same construction philosophy simplifies spares inventory across sizes — fewer critical items, more availability.
Demand in Trairão is characterized by medium density — regular and predictable opportunity pipeline, a typical regional pattern of the mesoregion. In Trairão, value added is dominated by services (33.9%, IBGE 2021), with a 2023 GDP of R$ 455 million — a profile where pumping demand concentrates on building infrastructure, sanitation, HVAC and utilities, FBCN centrifugal territory. Trairão: has a specific regional profile, with industrial demand sized to its scale, a structural variable in the commercial offer. The mineracao cluster near Trairão brings applications such as process-water booster, slurry pumping, pit dewatering and tailings dam services — a repertoire FB Bombas serves with dedicated series and field-validated materials. Typical use cases identified for Trairão: series FBEI for transferência geral and series FBCN for utilidades. Typical fluids handled in Trairão (óleos industriais and água industrial) require careful selection of seal and coating materials — a central variable in pump sizing.
Cabreúva-SP to Trairão: 2288 km via BR-010 / BR-153 Rodovia Belém-Brasília, a consolidated corridor with carriers qualified by FB Bombas for heavy-equipment cargo. Trairão receives equipment within 72h to 7 days, depending on modal and dry season counted from dispatch at the Cabreúva-SP factory. Trairão: technical service is organized as technical visits planned as a mission — concentrated agenda to cover multiple plants in a single trip — the model FB Bombas uses to ensure support without overloading operations.
Technical inquiry for the FBCN series in Trairão: real-curve sizing, material recommendation and sealing configuration. Direct service from the FB team.
Talk to engineeringFor over 82 years, we have manufactured industrial pumps in Cabreúva-SP. From north to south, we serve the country's main industrial hubs with gear (FBE/FBEI) and centrifugal (FBCN/FBOT) pumps — engineered, machined and assembled in our own manufacturing facility.
Our engineering team sizes each pump for the customer's actual application, with bench testing before shipping. This technical rigor — combined with direct support from our team — is what has sustained the trust of groups like Petrobras, Vale and CSN for generations.

What changes when the pump comes straight from the manufacturer: engineering, stock and logistics under one roof in Cabreúva-SP.
Technical support across all 27 Brazilian states, from inland regions to major industrial capitals.
Nationwide deliveries through partner carrier network with optimized lead times.
Technical team available for sizing, project work and after-sales support across any region.
Original spare parts for the FBE, FBEI, FBCN and FBOT series stocked at our own factory, ready to ship.
Own factory in Cabreúva/SP with full production capability, serving Trairão and all of Brazil

Engineering, CNC machining and assembly — all integrated in our Cabreúva/SP factory.

We size and build complete systems, ready for installation at your industrial plant.

We keep original parts in stock for all series, ensuring continuity of your operation.

Production line with centrifugal and gear pumps assembled and tested in our manufacturing plant.
FB Bombas serves Trairão and the entire Pará region with gear pumps (internal & external) and centrifugal pumps for your industrial application. Request a quote and receive a personalized proposal.
Request QuoteFour catalog series, fire-fighting systems and engineered-to-order — in-house manufacturing and hydrostatic testing on 100% of pumps
Our technical team is ready to develop the ideal solution for your application
Contact Us
Our manufacturing plant in Cabreúva-SP integrates engineering, CNC machining and assembly under one roof. Every pump is validated through bench testing before reaching the customer — ensuring it ships ready for real application.
Present in the largest industrial projects in Brazil and Latin America









See specific solutions for Trairão
Brazilian sectors for which FB Bombas sizes equipment — complete technical guides per application.
Regional service from Trairão — same series, same factory in Cabreúva/SP.
It depends on the service: fluid, temperature and operating pressure determine the configuration, which engineering defines. Available options are single seal, double seal (tandem or back-to-back), cartridge version and, in specific applications, packing glands. Hazardous fluids call for a double seal with barrier — that is the recommended option.
It offers both. The FAT (Factory Acceptance Test) takes place on the Cabreúva/SP bench and covers hydraulic testing, characteristic-curve measurement (Q × H), hydraulic efficiency, NPSHr and ISO 10816 vibration; when the customer specifies, inspection witnesses the tests. In the SAT (Site Acceptance Test) of Trairão projects, application engineering supports commissioning with startup checklist, laser alignment and capture of the baseline vibration signature.
Yes. As a Brazilian manufacturer accredited in FINAME — the BNDES Special Industrial Financing Agency —, FB Bombas qualifies equipment supplied to Trairão for BNDES Finame financing lines (Industrial Working Capital, Modernization, Capital Goods), with preferential conditions for national industry. On the technical proposal, the commercial team includes the product's FINAME code to enter the customer's financial plan.
Maximum temperature depends on the series: FBE and FBEI operate up to 350°C with heating jacket and special sealing; FBOT operates up to 350°C in thermal oil circuits; FBCN operates up to 260°C with proper materials and sealing. Correct sizing of sealing and materials is essential for safe operation.
Sizing is performed by FB Bombas’ application engineering team based on four key variables: desired flow, differential pressure, working temperature and fluid viscosity. Additional data such as available NPSH, operating cycle and fluid chemical compatibility are also considered. The service is free of charge for customers in Trairão.
The schedule is set by three factors: chosen series, construction materials and stock at order time. Standard configurations ship faster; custom ones receive a firm date in the technical proposal. Delivery to Trairão is by road, shipping directly from the factory.
Shipment is by road via BR-010 / BR-153 Rodovia Belém-Brasília, with industrial packaging suited to the journey and tracking until delivery. Sizing, proposal and technical support run in parallel through remote channels — distance does not change the engineering scope, only the logistics planning, reflected in the proposal schedule.
Yes. ASME B73.1 dimensional compliance — the North American standard for horizontal end-suction process centrifugal pumps — is a feature of the FBCN series and enables retrofit on existing baseplates in Trairão plants, regardless of which brand occupied the base, provided the designation coincides. Shaft, suction/discharge flanges, casing feet and impeller centerline obey the standard, so the new pump takes the position without touching piping or baseplate.
To receive a technical quote for industrial pumps in Trairão, send via website form, WhatsApp +55 11 97287-4837 or email comercial@fbbombas.com.br the application data: fluid (name + viscosity at operating temperature), target flow (m³/h), discharge head (m), available NPSH, operating temperature and regime (continuous or intermittent). Application engineering responds with a preliminary technical proposal, characteristic curve, suggested materials and delivery lead time.
Yes. FB Bombas offers technical training for operations and maintenance teams in Trairão, with modules on: sizing and reading the characteristic curve, identifying cavitation through NPSH, mechanical-seal troubleshooting, laser alignment, ISO 10816 vibration analysis and PM (preventive maintenance) practice with bearing and wear-ring replacement. Training can be delivered at the customer plant or at the Cabreúva/SP factory, in person or hybrid.
Fill out the form and our technical team will contact you to size the ideal pump — gear (FBE/FBEI) or centrifugal (FBCN/FBOT).