Technical summary
The FBEI gear-pump line is specified in Trairão, Pará for local industry — flow and pressure set by the actual system curve. Cabreúva-SP factory (2288 km), API 676 and direct technical service from FB engineering.


From the Cabreúva-SP factory, 2288 km via BR-010 / BR-153 Rodovia Belém-Brasília, FB Bombas reaches Trairão with FBE, FBCN, FBOT inventory and engineering capability for special projects. FB Bombas aftermarket support in Trairão covers technical service, spare parts with traceable Data Book, scheduled preventive maintenance (PM) and full overhaul on a factory bench with certified FAT. Through 313-km proximity to the mining cluster of Oriximina, Trairão inherits technical-qualification standards (CRCC, sector audits and customer-side homologation standards) and approved suppliers — a favorable context for normalized FB solutions. For projects in Trairão that demand formal technical qualification, FB Bombas series cover ASME B73.1 (FBCN), API 676 (FBE/FBEI), NFPA 20 and NBR 16704 (FBFS systems) — a combination that removes the need for additional suppliers across fire-fighting and process scope. Trairão, Pará is territory where FB Bombas operates as a Brazilian industrial-pump manufacturer with 82 years of continuous operation. For the local industry industrial profile dominating the region, we offer the FBE, FBCN, FBOT and FBEI series with CRCC Petrobras qualification, API 676 compliance and ASME B73.1 normalization (API 610 engineered-to-order projects) — basis for retrofit in plants with global manufacturers already installed. Trairão is served by the BR-010 / BR-153 Rodovia Belém-Brasília axis and also by highways BR-010, BR-153, BR-316 and BR-230 for heavy-cargo movement — relevant for delivery of mounted skids and large pump-and-motor sets. The fluid roster in Trairão (óleos industriais and água industrial) demands attention to viscosity, operating temperature and chemical compatibility — variables that FB application engineering uses to recommend the proper series.
From the Cabreúva-SP factory, 2288 km via BR-010 / BR-153 Rodovia Belém-Brasília, FB Bombas reaches Trairão with FBE, FBCN, FBOT inventory and engineering capability for special projects. FB Bombas aftermarket support in Trairão covers technical service, spare parts with traceable Data Book, scheduled preventive maintenance (PM) and full overhaul on a factory bench with certified FAT. Through 313-km proximity to the mining cluster of Oriximina, Trairão inherits technical-qualification standards (CRCC, sector audits and customer-side homologation standards) and approved suppliers — a favorable context for normalized FB solutions. For projects in Trairão that demand formal technical qualification, FB Bombas series cover ASME B73.1 (FBCN), API 676 (FBE/FBEI), NFPA 20 and NBR 16704 (FBFS systems) — a combination that removes the need for additional suppliers across fire-fighting and process scope. Trairão, Pará is territory where FB Bombas operates as a Brazilian industrial-pump manufacturer with 82 years of continuous operation. For the local industry industrial profile dominating the region, we offer the FBE, FBCN, FBOT and FBEI series with CRCC Petrobras qualification, API 676 compliance and ASME B73.1 normalization (API 610 engineered-to-order projects) — basis for retrofit in plants with global manufacturers already installed. Trairão is served by the BR-010 / BR-153 Rodovia Belém-Brasília axis and also by highways BR-010, BR-153, BR-316 and BR-230 for heavy-cargo movement — relevant for delivery of mounted skids and large pump-and-motor sets. The fluid roster in Trairão (óleos industriais and água industrial) demands attention to viscosity, operating temperature and chemical compatibility — variables that FB application engineering uses to recommend the proper series.

Years
Compliant
Tested
Direct answer for industrial projects — recommended series, standards compliance and logistics.
The FBEI gear-pump line is specified in Trairão, Pará for local industry — flow and pressure set by the actual system curve. Cabreúva-SP factory (2288 km), API 676 and direct technical service from FB engineering.
From the Cabreúva-SP factory, 2288 km via BR-010 / BR-153 Rodovia Belém-Brasília, FB Bombas reaches Trairão with FBE, FBCN, FBOT inventory and engineering capability for special projects. FB Bombas aftermarket support in Trairão covers technical service, spare parts with traceable Data Book, scheduled preventive maintenance (PM) and full overhaul on a factory bench with certified FAT. Through 313-km proximity to the mining cluster of Oriximina, Trairão inherits technical-qualification standards (CRCC, sector audits and customer-side homologation standards) and approved suppliers — a favorable context for normalized FB solutions. For projects in Trairão that demand formal technical qualification, FB Bombas series cover ASME B73.1 (FBCN), API 676 (FBE/FBEI), NFPA 20 and NBR 16704 (FBFS systems) — a combination that removes the need for additional suppliers across fire-fighting and process scope. Trairão, Pará is territory where FB Bombas operates as a Brazilian industrial-pump manufacturer with 82 years of continuous operation. For the local industry industrial profile dominating the region, we offer the FBE, FBCN, FBOT and FBEI series with CRCC Petrobras qualification, API 676 compliance and ASME B73.1 normalization (API 610 engineered-to-order projects) — basis for retrofit in plants with global manufacturers already installed. Trairão is served by the BR-010 / BR-153 Rodovia Belém-Brasília axis and also by highways BR-010, BR-153, BR-316 and BR-230 for heavy-cargo movement — relevant for delivery of mounted skids and large pump-and-motor sets. The fluid roster in Trairão (óleos industriais and água industrial) demands attention to viscosity, operating temperature and chemical compatibility — variables that FB application engineering uses to recommend the proper series.
The pump-and-motor set shipped to Trairão undergoes bench hydraulic testing and G2.5 dynamic balancing (ISO 21940), with a traceable report. For the technical profile observed in Trairão, FB Bombas application engineering recommends FBEI and FBCN as a starting point for sizing, subject to refinement per Q×H curve, available NPSH and actual fluid temperature. In Trairão, materials such as austenitic stainless steels (AISI 304/316) with attention to thermal expansion answer the requirements of óleos industriais and água industrial — a combination that drives service life of casing, impeller, shaft and shaft sleeve, refined via corrosion analysis using removal rates (mpy). For the industrial park of Trairão, the FBE series answers the services kinetic hydraulics cannot cover: transfer with stable flow under fluctuating pressure, dosing proportional to speed and high-viscosity fluids — the typical case of óleos e água industrial. Sizing validates starting torque at the coldest condition of the year — the classic mistake that shears keys in undersized pumps.
In Trairão, the low complexity index in the fluid mix sets lean fluid roster — technical operation focused on few main vectors — a factor adjusting both technical-spec depth and materials-catalogue scope. A GDP of R$ 455 million (IBGE, 2023) with a services profile (33.9% of value added in 2021) places Trairão's local demand in the utilities field: building pressurization, light process water and fire-fighting systems. In Trairão, medium density — regular and predictable opportunity pipeline — a characteristic that sizes FB's commercial strategy: application-engineering coverage, visit cadence and depth of consignment stock. Typical fluids handled in Trairão (óleos industriais and água industrial) require careful selection of seal and coating materials — a central variable in pump sizing. The mineracao cluster near Trairão brings applications such as process-water booster, slurry pumping, pit dewatering and tailings dam services — a repertoire FB Bombas serves with dedicated series and field-validated materials. Typical use cases identified for Trairão: series FBEI for transferência geral and series FBCN for utilidades.
72h to 7 days, depending on modal and dry season: this is the typical delivery interval Cabreúva-SP → Trairão, based on a consolidated road route and FB-qualified logistics operators. The BR-010 / BR-153 Rodovia Belém-Brasília corridor (2288 km) is the logistics spine for FB deliveries to Trairão — a factor entering FOB pricing and the commissioning lead-time curve. The factory-to-Trairão dispatch includes technical packaging (impact protection, moisture sealing), multilingual documentation (PT/EN/ES when required) and approved-carrier tracking.
FB engineers serve Trairão for the FBE series with a sized proposal — duty point, fluid, field conditions and supply lead time.
Talk to engineeringFor over 82 years, we have manufactured industrial pumps in Cabreúva-SP. From north to south, we serve the country's main industrial hubs with gear (FBE/FBEI) and centrifugal (FBCN/FBOT) pumps — engineered, machined and assembled in our own manufacturing facility.
Our engineering team sizes each pump for the customer's actual application, with bench testing before shipping. This technical rigor — combined with direct support from our team — is what has sustained the trust of groups like Petrobras, Vale and CSN for generations.

What changes when the pump comes straight from the manufacturer: engineering, stock and logistics under one roof in Cabreúva-SP.
Technical support across all 27 Brazilian states, from inland regions to major industrial capitals.
Nationwide deliveries through partner carrier network with optimized lead times.
Technical team available for sizing, project work and after-sales support across any region.
Original spare parts for the FBE, FBEI, FBCN and FBOT series stocked at our own factory, ready to ship.
Own factory in Cabreúva/SP with full production capability, serving Trairão and all of Brazil

Engineering, CNC machining and assembly — all integrated in our Cabreúva/SP factory.

We size and build complete systems, ready for installation at your industrial plant.

We keep original parts in stock for all series, ensuring continuity of your operation.

Production line with centrifugal and gear pumps assembled and tested in our manufacturing plant.
FB Bombas serves Trairão and the entire Pará region with gear pumps (internal & external) and centrifugal pumps for your industrial application. Request a quote and receive a personalized proposal.
Request QuoteFour catalog series, fire-fighting systems and engineered-to-order — in-house manufacturing and hydrostatic testing on 100% of pumps
Our technical team is ready to develop the ideal solution for your application
Contact Us
Our manufacturing plant in Cabreúva-SP integrates engineering, CNC machining and assembly under one roof. Every pump is validated through bench testing before reaching the customer — ensuring it ships ready for real application.
Present in the largest industrial projects in Brazil and Latin America









See specific solutions for Trairão
Brazilian sectors for which FB Bombas sizes equipment — complete technical guides per application.
Regional service from Trairão — same series, same factory in Cabreúva/SP.
It depends on the service: fluid, temperature and operating pressure determine the configuration, which engineering defines. Available options are single seal, double seal (tandem or back-to-back), cartridge version and, in specific applications, packing glands. Hazardous fluids call for a double seal with barrier — that is the recommended option.
It offers both. The FAT (Factory Acceptance Test) takes place on the Cabreúva/SP bench and covers hydraulic testing, characteristic-curve measurement (Q × H), hydraulic efficiency, NPSHr and ISO 10816 vibration; when the customer specifies, inspection witnesses the tests. In the SAT (Site Acceptance Test) of Trairão projects, application engineering supports commissioning with startup checklist, laser alignment and capture of the baseline vibration signature.
Yes. As a Brazilian manufacturer accredited in FINAME — the BNDES Special Industrial Financing Agency —, FB Bombas qualifies equipment supplied to Trairão for BNDES Finame financing lines (Industrial Working Capital, Modernization, Capital Goods), with preferential conditions for national industry. On the technical proposal, the commercial team includes the product's FINAME code to enter the customer's financial plan.
Maximum temperature depends on the series: FBE and FBEI operate up to 350°C with heating jacket and special sealing; FBOT operates up to 350°C in thermal oil circuits; FBCN operates up to 260°C with proper materials and sealing. Correct sizing of sealing and materials is essential for safe operation.
Sizing is performed by FB Bombas’ application engineering team based on four key variables: desired flow, differential pressure, working temperature and fluid viscosity. Additional data such as available NPSH, operating cycle and fluid chemical compatibility are also considered. The service is free of charge for customers in Trairão.
The schedule is set by three factors: chosen series, construction materials and stock at order time. Standard configurations ship faster; custom ones receive a firm date in the technical proposal. Delivery to Trairão is by road, shipping directly from the factory.
Shipment is by road via BR-010 / BR-153 Rodovia Belém-Brasília, with industrial packaging suited to the journey and tracking until delivery. Sizing, proposal and technical support run in parallel through remote channels — distance does not change the engineering scope, only the logistics planning, reflected in the proposal schedule.
Yes. ASME B73.1 dimensional compliance — the North American standard for horizontal end-suction process centrifugal pumps — is a feature of the FBCN series and enables retrofit on existing baseplates in Trairão plants, regardless of which brand occupied the base, provided the designation coincides. Shaft, suction/discharge flanges, casing feet and impeller centerline obey the standard, so the new pump takes the position without touching piping or baseplate.
To receive a technical quote for industrial pumps in Trairão, send via website form, WhatsApp +55 11 97287-4837 or email comercial@fbbombas.com.br the application data: fluid (name + viscosity at operating temperature), target flow (m³/h), discharge head (m), available NPSH, operating temperature and regime (continuous or intermittent). Application engineering responds with a preliminary technical proposal, characteristic curve, suggested materials and delivery lead time.
Yes. FB Bombas offers technical training for operations and maintenance teams in Trairão, with modules on: sizing and reading the characteristic curve, identifying cavitation through NPSH, mechanical-seal troubleshooting, laser alignment, ISO 10816 vibration analysis and PM (preventive maintenance) practice with bearing and wear-ring replacement. Training can be delivered at the customer plant or at the Cabreúva/SP factory, in person or hybrid.
Fill out the form and our technical team will contact you to size the ideal pump — gear (FBE/FBEI) or centrifugal (FBCN/FBOT).