Does FB Bombas serve fire protection systems?
The portfolio includes pumping sets for fire protection systems. Provide the project, duty point, drive arrangement and required standards and acceptance criteria. Compliance must be checked for the supplied set; standards such as NFPA 20 and NBR 16704 are not certificates issued for the entire company.
How can I check pump stock for Matões?
FBE pumps from 1/8″ to 4″ are kept in stock at the factory, in every configuration and option; for the FBE 5″ and 6″ and the other series, our team confirms availability together with pricing.
Is it possible to replace an imported pump with an FB Bombas pump?
Yes, once equivalence has been confirmed. FB Bombas replaces the installed pump with a complete FB Bombas pump and, before the order, assesses the installation and sends a data sheet and dimensional drawing.
For the installation, send the identification and drawing of the current pump, with its duty point, fluid, materials and drive; origin or a similar designation does not guarantee direct replacement.
How can I request a pump vibration assessment in Matões?
Send the series and model of the pump installed, the operating conditions and the available vibration records; the standard, measurement points and limits are defined for the assembly, with no single limit for every pump.
Check the alignment first: the FBEI (MAN001-10) and FBME (MSERV-08/01) manuals identify pump-to-motor misalignment as a source of vibration and premature wear and call for realignment after final installation, because transport usually misaligns the set, which leaves the factory pre-aligned. The stated tolerance is under 0.05 mm radial and 0.6° angular, according to the coupling supplier.
Are FB Bombas pumps delivered to Matões with a traceable Data Book?
When the Data Book is part of the purchase scope. State which drawings and manuals are required; the proposal confirms the documents applicable to the supplied series and configuration. The same Data Book is not assumed for every pump.
How do I request urgent spare parts for Matões?
With the pump and part identification. State the pump model and identification, the part as shown in the parts list of the series manual, the urgency and the destination; the team checks availability and confirms service and transport options. There is no published universal parts lead time or automatic guarantee of consignment stock.
To reduce downtime, the FBEI (MAN001-10) and FBME (MSERV-08/01) manuals include the list of spare parts for two years of operation.
Are FB Bombas pumps easy to maintain?
It depends on the series. On the FBCN and FBOT, back pull-out construction allows the bearing-housing assembly to be removed without disconnecting the piping, and the FBEI catalogue also indicates back pull-out construction. The FBE external gear pump is not back pull-out: its shafts are supported on bushings.
Before working on the equipment, check the series manual, the sectional drawing and the parts list.
Does FB Bombas serve cities neighboring Matões?
Yes. FB Bombas has a single factory and serves projects in other cities through its channels. Provide each project location and required scope to confirm supply and transport conditions.
Where can I find installation, operation and maintenance instructions for FB Bombas pumps?
It depends on the series. Installation and operation instructions are in FBEI manual MAN001-10 and in FBME service manual MSERV-08/01, which also covers maintenance and recommends supervision authorized by FB Bombas during installation.
The FBE (MTEC-01/01), FBCN (MTEC-03/00) and FBOT (MTEC-16/00) technical manuals provide technical data, sectional drawings, parts lists and dimensions; for installing and maintaining these series, the published services include on-site start-up and commissioning and maintenance contracts. The manuals are on the website’s technical manuals page (PDFs in Portuguese), and MSERV-08/01 is on the FBME series page.
For the operation, identify the series and model from the pump’s nameplate.
How is pump sizing performed?
The review considers the fluid, flow, required pressure or head, temperature, viscosity and installation conditions. Provide what you already know and identify any equipment in use. The team checks the necessary data before confirming series, model, drive and materials.