Is the FBCN dimensionally compliant with ASME B73.1?
Manual MTEC-03/00 does not state that compliance: it states FBCN mechanical construction per ASME B73.1, not its dimensions. So, before a replacement, interchangeability with the existing pump is checked on each model’s drawing, together with the duty point, materials and drive.
Where can I find installation, operation and maintenance instructions for FB Bombas pumps?
It depends on the series. Installation and operation instructions are in FBEI manual MAN001-10 and in FBME service manual MSERV-08/01, which also covers maintenance and recommends supervision authorized by FB Bombas during installation.
The FBE (MTEC-01/01), FBCN (MTEC-03/00) and FBOT (MTEC-16/00) technical manuals provide technical data, sectional drawings, parts lists and dimensions; for installing and maintaining these series, the published services include on-site start-up and commissioning and maintenance contracts. The manuals are on the website’s technical manuals page (PDFs in Portuguese), and MSERV-08/01 is on the FBME series page.
For the operation, identify the series and model from the pump’s nameplate.
Up to what temperature can FB Bombas pumps operate?
It depends on the series. The published limits are up to 260 °C for the FBCN, 350 °C for the FBOT, 340 °C for the FBEI and 140 °C for the FBME. For the FBE, the 2026 catalogue gives a range of 10 °C to 500 °C; the limit of each configuration depends on materials and sealing.
These are series limits: they do not automatically apply to every model, nor do they necessarily occur together with the other maximums. State the start-up, operating and cleaning temperatures of the process.
What is the warranty on FB Bombas pumps?
Warranty conditions are defined in the proposal and contract and vary with the series, operating conditions and agreement. The manuals state what can void it. Under the FBEI manual (MAN001-10), operating with a different fluid or outside the pump’s data sheets and certified documents without FB Bombas’ written authorization voids the warranty.
Under the FBME service manual (MSERV-08/01), after parts are replaced, the operating and performance warranty applies only with original parts and FB Bombas’ consent. For the project, confirm the conditions in the quotation.
Is it possible to replace an imported pump with an FB Bombas pump?
Yes, once equivalence has been confirmed. FB Bombas replaces the installed pump with a complete FB Bombas pump and, before the order, assesses the installation and sends a data sheet and dimensional drawing.
For the installation, send the identification and drawing of the current pump, with its duty point, fluid, materials and drive; origin or a similar designation does not guarantee direct replacement.
How can pump delivery to Carolina be planned?
The proposal should define availability, dispatch, transport, packaging and responsibilities for delivery. State access, unloading and receiving restrictions. Route, mode and timing are confirmed for the supply; a reference distance is not a road route or delivery time.
Does FB Bombas retrofit older pumps?
By replacement, not refurbishment. FB Bombas replaces the old pump with a new, complete FB Bombas pump. Before the order, engineering assesses the installation and issues a data sheet and dimensional drawing; the drawing confirms whether the existing baseplate and piping can be kept or need adaptation.
FB Bombas does not refurbish other manufacturers’ pumps, sell third-party parts or reuse the installed casing. For FB Bombas pumps in service, it supplies original parts and maintenance contracts.
How long has FB Bombas been in the market?
FB Bombas began manufacturing industrial pumps in 1944. The Our History page presents the company’s development; each series’ technical documentation supports equipment evaluation for your project.
How can I check whether a pump purchase for Carolina can use BNDES Finame?
Following the BNDES steps, first check whether the equipment appears on the list of items eligible for BNDES Finame financing, in the CFI Catalog on the bank’s website; for that check, ask the sales team for the identification of the model quoted.
Then apply for financing through an accredited financial agent, such as a commercial bank, development bank, development agency or credit union. The agent reviews the request and, if it approves the operation, forwards it to BNDES, which evaluates the request and authorizes the financing. Being a Brazilian manufacturer does not, on its own, show that the equipment is accredited.
Are FB Bombas pumps delivered to Carolina with a traceable Data Book?
When the Data Book is part of the purchase scope. State which drawings and manuals are required; the proposal confirms the documents applicable to the supplied series and configuration. The same Data Book is not assumed for every pump.