Skip to main content

Known series or pump to be selected

Do you already know the pump or need help defining it? Choose the next step for your industrial project.

I have a series or model

Review the equipment, dimensions and family documentation. For replacement, also provide the identification of your existing pump.

Industrial pump catalog

I need to select a pump

Tell us the fluid and what the pump will do: transfer, circulate or feed another unit.

Describe my application

Information for your project

Country context, electrical frequency and installation destinations, with sources for reference.

Electrical frequency — Peru

The IEC World Plugs guide lists 60 Hz for Peru. Confirm the frequency, voltage and phases available at the installation and send the motor identification, including any variable-frequency drive or gearbox. The pump curve and drive documentation should match the requested configuration. Source: IEC, World Plugs (publication archived on August 16, 2026).

Peru: district, main site and branch in CENEC

INEI’s V CENEC 2022 dictionary separates department, province and district and records activity using ISIC Rev.4. It also distinguishes single, main, branch and auxiliary establishments. Its sales variable refers to 2021: the edition year is not the year of every measurement. For a Peruvian installation, identify the district and the unit receiving the assembly, along with its full address.

The register reference helps identify the establishment; selection remains tied to the pump’s service. Source: INEI — Diccionario V CENEC 2022, pp. 1–2 (accessed October 22, 2026).

Project destinations — Peru

Arequipa; Chiclayo; Chimbote; Cusco; Huancayo; Iquitos; Lima; Piura; Tacna; Trujillo.

Manuals and guides by series and application

Use the family documentation and application guides to prepare your request.

Technical manuals

Installation, operation and maintenance by series, with the document language identified.

Technical pump manuals

Send your process data to engineering in Cabreúva

Your message goes straight to the factory team.

What happens next

Provide the destination country and city, installation requirements and documents required by the buyer. Export scope and each party’s responsibilities are confirmed in the proposal.

Application details

Describe the fluid, application and project destination. Include the model and technical data you already have.

Your contact detailsComplete the fields marked as required.

Include the area code. No need to repeat +55.

Fluid, application or model, if you already know it.

Our team replies with the quote or with any questions we still have.