Technical summary
For local industry in Taperoá, Bahia, FB Bombas sizes FBEI, FBCN series from its Cabreúva-SP factory (1377 km). ASME B73.1 standardization, hydraulic testing, Petrobras CRCC and 72-96h logistics lead time.


Gear pumps (internal & external) and centrifugal pumps manufactured in Cabreúva/SP. Serving Taperoá and region — factory 1367km away. Technical response within 24h.
Gear pumps (internal & external) and centrifugal pumps manufactured in Cabreúva/SP. Serving Taperoá and region — factory 1367km away. Technical response within 24h.

Years
Compliant
Tested
Direct answer for industrial projects — recommended series, standards compliance and logistics.
For local industry in Taperoá, Bahia, FB Bombas sizes FBEI, FBCN series from its Cabreúva-SP factory (1377 km). ASME B73.1 standardization, hydraulic testing, Petrobras CRCC and 72-96h logistics lead time.
FB Bombas serves Taperoá from its Cabreúva-SP factory, with transport via BR-116 (via Fernão Dias BR-381 até MG) and application-engineering support for dimensioning according to the actual operation profile. Just 111 km separate Taperoá from the refining cluster of Sao Francisco Do Conde — a distance that enables joint technical visits and dilution of mobilization cost across multiple customers. Taperoá requires pumping of óleos industriais and água industrial, a fluid set for which FB Bombas already has product series with field-validated material selection. The road network BR-116, BR-101 and BR-324, with BR-116 (via Fernão Dias BR-381 até MG) as the main axis, defines response time for critical-part shipments and technical visits to Taperoá. For projects in Taperoá that demand formal technical qualification, FB Bombas series cover ASME B73.1 (FBCN), API 676 (FBE/FBEI), NFPA 20 and NBR 16704 (FBFS systems) — a combination that removes the need for additional suppliers across fire-fighting and process scope. For pumping projects in Taperoá, FB Bombas provides dedicated application engineering — pre-sizing against the actual system curve, material selection (AISI 316) and on-site commissioning support. In Taperoá, Bahia, FB Bombas serves local industry projects with the FBE, FBCN, FBOT and FBEI series — dedicated application engineering for sizing against the actual system curve, CRCC Petrobras certification and technical compliance with ASME B73.1 (centrifugal), API 676 (gear) and NFPA 20 / NBR 16704 (fire fighting).
Lead time for critical parts to Taperoá is typically 72-96h — a function of distance (1377 km) and the available road modal. In Taperoá, influence from the refino cluster translates into crude oil, derivatives, high temperature (up to 260°C in FBCN, 350°C in FBOT) and API 610 requirements met via engineered-to-order projects — variables that enter both preliminary sizing and the selection of materials and constructive configurations. For óleos industriais and água industrial, the materials recommendation in Taperoá converges on AISI 316 or for chloride resistance in marine atmosphere, a starting point adjustable based on field-observed corrosion. FBEI and FBCN: this is the set of FB series with initial technical fit for Taperoá, respecting fluid characteristics and the regional operating regime.
Taperoá: medium density — regular and predictable opportunity pipeline — a variable influencing commercial strategy and service logistics. A GDP of R$ 255 million (IBGE, 2023) with a services profile (30.3% of value added in 2021) places Taperoá's local demand in the utilities field: building pressurization, light process water and fire-fighting systems. Taperoá: low fluid complexity, lean fluid roster — technical operation focused on few main vectors. The refino cluster around Taperoá concentrates applications crude transfer, distillation-tower circulation, charge pumps for reactors and movement of derivatives — a technical package where FB Bombas has commissioning, retrofit and long-term support history. Use cases in Taperoá (series FBEI for transferência geral and series FBCN for utilidades) follow the FB technical playbook with benchmarking against an analogous installed base in a comparable region. The fluid catalogue in Taperoá (óleos industriais and água industrial) demands case-by-case technical analysis: pour point, Saybolt viscosity at operating temperature, suspended solids and pH profile.
1377 km separate the Cabreúva-SP factory from Taperoá via BR-116 (via Fernão Dias BR-381 até MG) — an axis sized for movement of pumps, skids and pump-and-motor sets. Logistics lead time to Taperoá is 48-72h, with possible technical stop — variable with cargo type, season and specific optimizations. The factory-to-Taperoá logistics cycle begins with documented dispatch: invoice, packing list, test certificates and the equipment's technical manual.
FB engineers serve Taperoá with a formal technical proposal: curve-based sizing, materials, NPSH, field conditions and lead time. First engineering response within 1 business day; complete proposal within 3-5 business days.
Talk to engineeringFor over 82 years, we have manufactured industrial pumps in Cabreúva-SP. From north to south, we serve the country's main industrial hubs with gear (FBE/FBEI) and centrifugal (FBCN/FBOT) pumps — engineered, machined and assembled in our own manufacturing facility.
Our engineering team sizes each pump for the customer's actual application, with bench testing before shipping. This technical rigor — combined with direct support from our team — is what has sustained the trust of groups like Petrobras, Vale and CSN for generations.

What changes when the pump comes straight from the manufacturer: engineering, stock and logistics under one roof in Cabreúva-SP.
Technical support across all 27 Brazilian states, from inland regions to major industrial capitals.
Nationwide deliveries through partner carrier network with optimized lead times.
Technical team available for sizing, project work and after-sales support across any region.
Original spare parts for the FBE, FBEI, FBCN and FBOT series stocked at our own factory, ready to ship.
Own factory in Cabreúva/SP with full production capability, serving Taperoá and all of Brazil

Engineering, CNC machining and assembly — all integrated in our Cabreúva/SP factory.

We size and build complete systems, ready for installation at your industrial plant.

We keep original parts in stock for all series, ensuring continuity of your operation.

Production line with centrifugal and gear pumps assembled and tested in our manufacturing plant.
FB Bombas serves Taperoá and the entire Bahia region with gear pumps (internal & external) and centrifugal pumps for your industrial application. Request a quote and receive a personalized proposal.
Request QuoteFour catalog series, fire-fighting systems and engineered-to-order — in-house manufacturing and hydrostatic testing on 100% of pumps
Our technical team is ready to develop the ideal solution for your application
Contact Us
Our manufacturing plant in Cabreúva-SP integrates engineering, CNC machining and assembly under one roof. Every pump is validated through bench testing before reaching the customer — ensuring it ships ready for real application.
Present in the largest industrial projects in Brazil and Latin America









See specific solutions for Taperoá
Brazilian sectors for which FB Bombas sizes equipment — complete technical guides per application.
FB Bombas serves Taperoá and neighboring municipalities with the same technical team — optimized visits and supply in joint campaigns.
Yes. FB Bombas serves the entire metropolitan region and microregions neighboring Taperoá with the same technical support and logistics structure. This regional reach allows serving industrial plants distributed across multiple cities in a coordinated way.
It does. FB pumps for stationary fire protection systems follow the NFPA standard (National Fire Protection Association) and ABNT's NBR 16704, requirements demanded in building and industrial projects that call for these certifications.
They do. In the FBE and FBCN lines, wear-affected components sit in easily accessible positions, so conventional tools suffice for disassembly and inspection. Add detailed technical manuals and factory-direct availability of replacement parts — and maintenance becomes an uncomplicated routine.
Yes. As a Brazilian manufacturer accredited in FINAME — the BNDES Special Industrial Financing Agency —, FB Bombas qualifies equipment supplied to Taperoá for BNDES Finame financing lines (Industrial Working Capital, Modernization, Capital Goods), with preferential conditions for national industry. On the technical proposal, the commercial team includes the product's FINAME code to enter the customer's financial plan.
Shipment is by road via BR-116 (via Fernão Dias BR-381 até MG), with industrial packaging suited to the journey and tracking until delivery. Sizing, proposal and technical support run in parallel through remote channels — distance does not change the engineering scope, only the logistics planning, reflected in the proposal schedule.
Yes. Correct sizing is the main lever for energy efficiency — an oversized or undersized pump wastes energy. FB Bombas engineering calculates the optimal operating point considering the actual process conditions in Taperoá, optimizing the flow/pressure/power ratio.
Manufacturing in Brazil since 1944, FB Bombas delivers shorter lead times — with no import dependency —, direct technical support from FB engineering, in-house manufactured replacement parts, local-currency pricing free of exchange rate exposure, and on-site service for projects in Taperoá and surrounding areas.
The FB line covers a wide range: mineral and synthetic oils, asphalt (CAP), BPF fuel oils, petroleum derivatives, molasses, resins, viscous chemical and hydraulic products (FBE series); raw and treated water, process fluids, industrial effluents (FBCN series); thermal oil at elevated temperatures (FBOT series). Each application is sized according to fluid viscosity, temperature and chemical compatibility.
It does. When a special application demands something beyond the standard portfolio, FB Bombas develops the solution: modified construction materials, specific sealing arrangements, system-integrated heating, skids, mobile assemblies and retrofit of existing installations. Engineering reviews each special project as a step prior to manufacturing.
Each series has its thermal limit: with heating jacket and special sealing, FBE and FBEI reach 350°C; FBOT hits the same 350°C in thermal oil circuits; FBCN goes up to 260°C when fitted with proper materials and sealing. Safe operation requires correctly sized sealing and materials.
Fill out the form and our technical team will contact you to size the ideal pump — gear (FBE/FBEI) or centrifugal (FBCN/FBOT).