Technical summary
Sítio do Quinto, Bahia is FB Bombas territory: FBEI, FBCN series for local industry, vertically integrated manufacturing in Cabreúva-SP (1723 km), API 676/ASME B73.1 compliance and Petrobras CRCC. Typical lead time: 96h to 7 days.


Gear pumps (internal & external) and centrifugal pumps manufactured in Cabreúva/SP. Serving Sítio do Quinto and region — factory 1713km away. Technical response within 24h.
Gear pumps (internal & external) and centrifugal pumps manufactured in Cabreúva/SP. Serving Sítio do Quinto and region — factory 1713km away. Technical response within 24h.

Years
Compliant
Tested
Direct answer for industrial projects — recommended series, standards compliance and logistics.
Sítio do Quinto, Bahia is FB Bombas territory: FBEI, FBCN series for local industry, vertically integrated manufacturing in Cabreúva-SP (1723 km), API 676/ASME B73.1 compliance and Petrobras CRCC. Typical lead time: 96h to 7 days.
FB Bombas is a Brazilian manufacturer of industrial pumps serving Sítio do Quinto, Bahia, with the FBE, FBCN, FBOT and FBEI series applied to the local industry sector that dominates the region. Direct factory service from Cabreúva-SP, with application engineering for technical sizing and qualification under CRCC Petrobras / API 610 / ASME B73.1 per project specification. Sítio do Quinto sits 257 km from the refining cluster centered in Sao Francisco Do Conde, a proximity that usually means shared suppliers and aligned maintenance standards. Sítio do Quinto requires pumping of óleos industriais and água industrial, a fluid set for which FB Bombas already has product series with field-validated material selection. The city sits within the IBGE mesoregion Nordeste Baiano, a regional grouping of municipalities with similar economic and logistics profiles — useful for comparative analysis and technical-visit routing. FB Bombas application engineering owns technical specification in Sítio do Quinto — from customer data sheet to the final Data Book delivered with the pump, through application review, FAT on the hydraulic bench and on-site SAT support. Sítio do Quinto is served by the BR-116 (via Fernão Dias BR-381 até MG) axis and also by highways BR-116, BR-101 and BR-324 for heavy-cargo movement — relevant for delivery of mounted skids and large pump-and-motor sets. Service to Sítio do Quinto is coordinated from the Cabreúva-SP factory, route BR-116 (via Fernão Dias BR-381 até MG) (1723 km), with a technical team for selection, commissioning and replacement support.
Technical fit in Sítio do Quinto points to FBEI and FBCN as the series suitable for typical local operations — a baseline recommendation; the final specification depends on the specific process parameters. Sítio do Quinto: transferência geral and utilidades. This application mix is covered by the recommended FB series, with case-by-case fine tuning. For óleos industriais and água industrial in Sítio do Quinto, the baseline is austenitic stainless steels (AISI 304/316) with attention to thermal expansion — FB engineering tunes from immersion tests, field history and iron/stainless/duplex compatibility within the local fluid classes. Lead time for critical parts to Sítio do Quinto is typically 96h to 7 days — a function of distance (1723 km) and the available road modal.
In Sítio do Quinto, the low complexity index in the fluid mix sets lean fluid roster — technical operation focused on few main vectors — a factor adjusting both technical-spec depth and materials-catalogue scope. In Sítio do Quinto, medium density — regular and predictable opportunity pipeline — a characteristic that sizes FB's commercial strategy: application-engineering coverage, visit cadence and depth of consignment stock. In Sítio do Quinto, value added is dominated by services (29.2%, IBGE 2021), with a 2023 GDP of R$ 168 million — a profile where pumping demand concentrates on building infrastructure, sanitation, HVAC and utilities, FBCN centrifugal territory. In Sítio do Quinto, óleos industriais and água industrial form the typical fluid set — guiding both series selection (gear, centrifugal, thermal oil) and constructive detail (closed/open/semi-open impeller). Sítio do Quinto shows cases like series FBEI for transferência geral and series FBCN for utilidades — a package FB Bombas addresses with real-curve sizing, material recommendation and dimensioned seal configuration. In Sítio do Quinto, near a refino cluster, applications such as crude transfer, distillation-tower circulation, charge pumps for reactors and movement of derivatives make up the operational agenda — each backed by technical references in the FBE/FBCN/FBOT catalogues.
The main logistics axis between Cabreúva-SP and Sítio do Quinto is BR-116 (via Fernão Dias BR-381 até MG), totaling 1723 km — a route that sets the default delivery time for finished equipment. Typical transit time to Sítio do Quinto: 72h to 7 days, depending on modal and dry season — the window used in FB Bombas' standard commercial commitment. Dispatch from the Cabreúva-SP factory to Sítio do Quinto occurs after bench hydraulic testing and Data Book verification — mandatory steps in FB's quality control.
Technical inquiry for Sítio do Quinto: the FB Bombas team evaluates operating regime, fluid, available NPSH and construction configurations — return with a sized proposal within 3-5 business days.
Talk to engineeringFor over 82 years, we have manufactured industrial pumps in Cabreúva-SP. From north to south, we serve the country's main industrial hubs with gear (FBE/FBEI) and centrifugal (FBCN/FBOT) pumps — engineered, machined and assembled in our own manufacturing facility.
Our engineering team sizes each pump for the customer's actual application, with bench testing before shipping. This technical rigor — combined with direct support from our team — is what has sustained the trust of groups like Petrobras, Vale and CSN for generations.

What changes when the pump comes straight from the manufacturer: engineering, stock and logistics under one roof in Cabreúva-SP.
Technical support across all 27 Brazilian states, from inland regions to major industrial capitals.
Nationwide deliveries through partner carrier network with optimized lead times.
Technical team available for sizing, project work and after-sales support across any region.
Original spare parts for the FBE, FBEI, FBCN and FBOT series stocked at our own factory, ready to ship.
Own factory in Cabreúva/SP with full production capability, serving Sítio do Quinto and all of Brazil

Engineering, CNC machining and assembly — all integrated in our Cabreúva/SP factory.

We size and build complete systems, ready for installation at your industrial plant.

We keep original parts in stock for all series, ensuring continuity of your operation.

Production line with centrifugal and gear pumps assembled and tested in our manufacturing plant.
FB Bombas serves Sítio do Quinto and the entire Bahia region with gear pumps (internal & external) and centrifugal pumps for your industrial application. Request a quote and receive a personalized proposal.
Request QuoteFour catalog series, fire-fighting systems and engineered-to-order — in-house manufacturing and hydrostatic testing on 100% of pumps
Our technical team is ready to develop the ideal solution for your application
Contact Us
Our manufacturing plant in Cabreúva-SP integrates engineering, CNC machining and assembly under one roof. Every pump is validated through bench testing before reaching the customer — ensuring it ships ready for real application.
Present in the largest industrial projects in Brazil and Latin America









See specific solutions for Sítio do Quinto
Brazilian sectors for which FB Bombas sizes equipment — complete technical guides per application.
FB Bombas serves Sítio do Quinto and neighboring municipalities with the same technical team — optimized visits and supply in joint campaigns.
There are three channels: WhatsApp +55 11 97287-4837, email comercial@fbbombas.com.br and the form on our website. Technical questions get priority response within the same business day — the reply comes directly from application engineering.
Yes — Sítio do Quinto is part of FB Bombas’ direct service area. Supply, engineering support and spare parts ship from the factory in Cabreúva/SP; sizing is done at no cost and, when the project is critical, the team evaluates an on-site technical visit.
Limits vary by series. FBE and FBEI: up to 350°C, provided a heating jacket and special sealing are used. FBOT: up to 350°C in thermal oil circuits. FBCN: up to 260°C, with materials and sealing suited to the service. Well-sized sealing and materials are a condition for safe operation in these ranges.
Shipment is by road via BR-116 (via Fernão Dias BR-381 até MG), with industrial packaging suited to the journey and tracking until delivery. Sizing, proposal and technical support run in parallel through remote channels — distance does not change the engineering scope, only the logistics planning, reflected in the proposal schedule.
Yes. Operations and maintenance teams in Sítio do Quinto count on FB Bombas technical training, structured in modules: sizing and characteristic-curve reading, identifying cavitation through NPSH, mechanical-seal troubleshooting, laser alignment, ISO 10816 vibration analysis and PM (preventive maintenance) practice with bearing and wear-ring replacement. Classes can happen at the customer plant or at the factory in Cabreúva/SP, in-person or hybrid format.
Yes. Since FB Bombas manufactures entirely in Cabreúva/SP, replacement parts for the FBE, FBEI, FBCN and FBOT series are available directly from the factory, with short lead times for scheduled stops and priority service for emergencies. This significantly reduces total cost of ownership.
It depends on the service: fluid, temperature and operating pressure determine the configuration, which engineering defines. Available options are single seal, double seal (tandem or back-to-back), cartridge version and, in specific applications, packing glands. Hazardous fluids call for a double seal with barrier — that is the recommended option.
Send the application data through the website form, WhatsApp +55 11 97287-4837 or email comercial@fbbombas.com.br: fluid (name and viscosity at operating temperature), target flow in m³/h, discharge head in m, available NPSH, operating temperature and regime — continuous or intermittent. After reviewing the briefing, application engineering returns a preliminary technical proposal, characteristic curve, suggested materials and delivery lead time for your project in Sítio do Quinto.
Yes. In addition to the standard portfolio, FB Bombas develops custom solutions for special applications, including modifications in construction materials, sealing arrangements, integrated heating systems, skids, mobile assemblies and retrofit of existing installations. Special projects go through engineering before manufacturing.
Shorter delivery times (no import dependency), direct technical support from FB engineering, replacement parts with in-house manufacturing, prices in local currency (no exchange rate exposure) and on-site service for projects in Sítio do Quinto and surrounding areas. FB Bombas has been manufacturing in Brazil since 1944.
Fill out the form and our technical team will contact you to size the ideal pump — gear (FBE/FBEI) or centrifugal (FBCN/FBOT).