Skip to main content
FB Bombas industrial facility in Cabreúva-SP, Brazil
100% Brazilian Company
Local Service

Gear & Centrifugal Pumps in Planalto

Gear pumps (internal & external) and centrifugal pumps manufactured in Cabreúva/SP. Serving Planalto and region — factory 1178km away.

Nationwide Service
1178km from factory
80+

Years

API

Certified

100%

Warranty

80+
Years in Market
CRCC
Petrobras Approved
27
States Served
API 610/676
Certified Pumps

Technical summary

Direct answer for industrial projects — recommended series, standards compliance and logistics.

Technical summary

In Planalto, Bahia, FB Bombas offers FBEI, FBCN series sized for local industry. In-house factory in Cabreúva-SP (1189 km), direct technical service from engineering and 72-96h logistics lead time for critical parts. Standards: API 610/676 and ASME B73.1.

Local technical content

Industrial Pumps in Planalto — Bahia

Local context

In Planalto, Bahia, FB Bombas serves local industry projects with the FBE, FBCN, FBOT and FBEI series — dedicated application engineering for sizing against the actual system curve, CRCC Petrobras certification and technical compliance with API 610 (centrifugal), API 676 (gear) and NFPA 20 / NBR 16704 (fire fighting). Road access runs via BR-116 (via Fernão Dias BR-381 até MG), with branches through BR-116, BR-101 and BR-324 — a corridor that sets delivery times for rotating equipment and the logistics of technical service. The fluid roster in Planalto (óleos industriais and água industrial) demands attention to viscosity, operating temperature and chemical compatibility — variables that FB application engineering uses to recommend the proper series. FB Bombas application engineering owns technical specification in Planalto — from customer data sheet to the final Data Book delivered with the pump, through application review, FAT on the hydraulic bench and on-site SAT support. Only 212 km from the pulp-and-paper cluster of Eunapolis, Planalto benefits from logistics spillover and movement of technical professionals — FB Bombas has a service track record in the region. For projects in Planalto that demand formal technical qualification, FB Bombas series cover API 610 (FBCN), API 676 (FBE/FBEI), NFPA 20 and NBR 16704 (FBFS systems) — a combination that removes the need for additional suppliers across fire-fighting and process scope. Service to Planalto is coordinated from the Cabreúva-SP factory, route BR-116 (via Fernão Dias BR-381 até MG) (1189 km), with a technical team for selection, commissioning and replacement support.

Technical solutions

For the technical profile observed in Planalto, FB Bombas application engineering recommends FBEI and FBCN as a starting point for sizing, subject to refinement per Q×H curve, available NPSH and actual fluid temperature. Material selection for óleos industriais and água industrial in Planalto considers austenitic stainless steels (AISI 304/316) with attention to thermal expansion — a specification FB Bombas details on a matweb sheet after fluid chemical analysis. Planalto: transferência geral and utilidades. This application mix is covered by the recommended FB series, with case-by-case fine tuning. Technical-and-commercial support for Planalto is covered from Cabreúva-SP, with typical lead time for critical parts of 72-96h via dedicated carrier.

Why FB Bombas

Demand in Planalto is characterized by medium density — regular and predictable opportunity pipeline, a typical regional pattern of the mesoregion. Technically, Planalto shows low complexity in its fluid mix — lean fluid roster — technical operation focused on few main vectors. Observed seasonal pattern: annual maintenance shutdowns concentrate demand into predictable windows. Planalto follows the same rhythm as the nearby papel-celulose cluster. Use cases in Planalto (series FBEI for transferência geral and series FBCN for utilidades) follow the FB technical playbook with benchmarking against an analogous installed base in a comparable region. The fluid catalogue in Planalto (óleos industriais and água industrial) demands case-by-case technical analysis: pour point, Saybolt viscosity at operating temperature, suspended solids and pH profile. The papel-celulose cluster around Planalto concentrates applications white/black liquor circulation, recovery-boiler feed and low-to-medium consistency stock pumping — a technical package where FB Bombas has commissioning, retrofit and long-term support history.

Logistics & support

1189 km separate the Cabreúva-SP factory from Planalto via BR-116 (via Fernão Dias BR-381 até MG) — an axis sized for movement of pumps, skids and pump-and-motor sets. Alternative routing to Planalto can use BR-116, BR-101 and BR-324, which helps in heavy-traffic situations or maintenance on specific roads. The factory-to-Planalto logistics cycle begins with documented dispatch: invoice, packing list, test certificates and the equipment's technical manual.

Request your proposal

For projects in Planalto, talk to FB engineering: technical analysis of the duty point, series and materials recommendation, hydraulic-test scope and Data Book. Direct service.

Talk to engineering
for Planalto
Why FB Bombas

National leadership in industrial pumping

For over 82 years, we have manufactured industrial pumps in Cabreúva-SP. From north to south, we serve the country's main industrial hubs with gear (FBE/FBEI) and centrifugal (FBCN/FBOT) pumps — engineered, machined and assembled in our own manufacturing facility.

Our engineering team sizes each pump for the customer's actual application, with bench testing before shipping. This technical rigor — combined with direct support from our team — is what has sustained the trust of groups like Petrobras, Vale and CSN for generations.

FB Bombas manufacturing plant in Cabreúva-SP — Brazilian industrial pump manufacturer
Brazil Differentiators

Advantages for your Industrial Operation

Four differentiators that make FB Bombas the choice of leading Brazilian industries.

Complete National Coverage

Technical support across all 27 Brazilian states, from inland regions to major industrial capitals.

Brazil-Wide Logistics

Nationwide deliveries through partner carrier network with optimized lead times.

Dedicated Engineering

Technical team available for sizing, project work and after-sales support across any region.

Strategic Stock

Original parts in stock for all series, ensuring operational continuity with zero downtime.

Discover FB Bombas

Own factory in Cabreúva/SP with full production capability, serving Planalto and all of Brazil

FB Bombas manufacturing plant with CNC machines and technical team in Cabreúva SP Brazil

Own Manufacturing

Engineering, CNC machining and assembly — all integrated in our Cabreúva/SP factory.

FB Bombas fire fighting system delivered to customer

Custom Projects

We size and build complete systems, ready for installation at your industrial plant.

FB Bombas replacement parts warehouse for industrial pumps

Replacement Parts

We keep original parts in stock for all series, ensuring continuity of your operation.

FBCN centrifugal pumps on FB Bombas factory floor

Industrial Production

Production line with centrifugal and gear pumps assembled and tested in our manufacturing plant.

FB Bombas serves Planalto and the entire Bahia region with gear pumps (internal & external) and centrifugal pumps for your industrial application. Request a quote and receive a personalized proposal.

Request Quote
FB Bombas production line with FBCN centrifugal pumps on the factory floor
Industrial Capacity

Production line dedicated to industrial pumps

Our manufacturing plant in Cabreúva-SP integrates engineering, CNC machining and assembly under one roof. Every pump is validated through bench testing before reaching the customer — ensuring it ships ready for real application.

350°C
Max. Temp. FBOT
1,350 l/min
Max. Flow FBE
2,200 m³/h
Max. Flow FBCN

Companies that Trust FB Bombas

Present in the largest industrial projects in Brazil and Latin America

Petrobras - Cliente FB Bombas
Vale - Cliente FB Bombas
BASF - Cliente FB Bombas
CSN - Cliente FB Bombas
WEG - Cliente FB Bombas
Cargill - Cliente FB Bombas
Ipiranga - Cliente FB Bombas
Mahle - Cliente FB Bombas
3M - Cliente FB Bombas

Neighboring cities served in the same region

FB Bombas serves Planalto and neighboring municipalities with the same technical team — optimized visits and supply in joint campaigns.

Frequently Asked Questions about Planalto

Yes. The FBCN series follows ASME B73.1 normalization (North American dimensional standard for end-suction process pumps) — which makes the pump-and-motor set interchangeable with global manufacturers (KSB, Sulzer, Goulds, Flowserve) already installed in plants in Planalto. For retrofits, the existing baseplate, suction/discharge piping and foundations are usually preserved; what changes is the rotating set. FB application engineering performs the dimensional gap analysis prior to supply.

Shorter delivery times (no import dependency), direct technical support from FB engineering, replacement parts with in-house manufacturing, prices in local currency (no exchange rate exposure) and on-site service for projects in Planalto and surrounding areas. FB Bombas has been manufacturing in Brazil since 1944.

The FB Bombas rotating set is balanced per ISO 21940 G2.5 (a balancing grade equivalent to API 610 requirements for heavy-duty service) — required for critical projects in Planalto with continuous regime, plants with online vibration monitoring or applications with high cost of unplanned downtime. For machines running above 3,600 RPM or with rotating mass over 50 kg, balancing is performed on two planes with a piezoelectric sensor.

Yes. FB Bombas manufactures pumps for stationary fire protection systems in compliance with NFPA (National Fire Protection Association) and ABNT NBR 16704 standards, serving building and industrial projects that require these certifications.

FB Bombas manufactures three major lines: FBE (external gear) for viscous fluids, FBEI (internal gear) for lubricating fluids, FBCN (normalized centrifugal) for water and low-viscosity fluids, and FBOT (specific centrifugal) for thermal oil circuits. We also serve fire protection systems in compliance with NFPA and NBR 16704.

Yes. FB Bombas’ application engineering analyzes the installed pump specifications (flow, pressure, viscosity, temperature) and proposes dimensional or functional technical equivalence with one of our series. Many clients in Planalto have already made this replacement with gains in lead time, cost and local support.

Yes. FB Bombas offers technical training for operations and maintenance teams in Planalto, with modules on: sizing and reading the characteristic curve, identifying cavitation through NPSH, mechanical-seal troubleshooting, laser alignment, ISO 10816 vibration analysis and PM (preventive maintenance) practice with bearing and wear-ring replacement. Training can be delivered at the customer plant or at the Cabreúva/SP factory, in person or hybrid.

For critical parts (mechanical seal, impeller, shaft, wear ring, bearings) during a plant shutdown in Planalto, FB Bombas runs an emergency flow: pre-invoicing, priority dispatch and alternative modal (express road or air transport depending on distance and criticality). Typical lead time varies by region, with a window negotiable case by case. For customers with an installed base and scheduled PM, part of the stock can be kept on consignment at the plant.

FB Bombas holds: active CRCC at Petrobras (supplier registry for Oil & Gas); compliance with API 676 (international standard for positive displacement pumps — FBE series); compliance with API 610 (standard for centrifugal pumps in refineries — FBCN series); compliance with NFPA (National Fire Protection Association) standards and ABNT NBR 16704 for stationary fire protection pump systems.

Maximum temperature depends on the series: FBE and FBEI operate up to 350°C with heating jacket and special sealing; FBOT operates up to 350°C in thermal oil circuits; FBCN operates up to 250°C with proper materials and sealing. Correct sizing of sealing and materials is essential for safe operation.

Need gear or centrifugal pumps in Planalto?

Fill out the form and our technical team will contact you to size the ideal pump — gear (FBE/FBEI) or centrifugal (FBCN/FBOT).

How we reach youFour required fields. Engineering replies after briefing analysis.
Add technical application dataFlow, fluid, viscosity. More detail means a sharper first reply — all optional.
Your messageDeadline, project standard, notes. Attachments by e-mail afterwards.

Reply after briefing analysis