Skip to main content
FB Bombas industrial facility in Cabreúva-SP, Brazil
100% Brazilian Company
FBCN Centrifugal Pumps

FBCN Centrifugal Pumps in Pedro Alexandre

The sugar-and-ethanol cluster of Maceio is 240 km from Pedro Alexandre, generating economic spillover and correlated technical demand — common in pumping projects involving both cities. The BR-116 (via Fernão Dias BR-381 até MG) corridor combined with highways BR-116, BR-101 and BR-324 composes the freight mesh to Pedro Alexandre — a cost variable in pricing skids, pump-motor sets and indivisible cargo with escort. In Pedro Alexandre, FB Bombas serves projects with in-house application engineering: system-curve analysis, NPSH balance (available vs required), series selection (FBE / FBCN / FBOT / FBEI / FBFS) and API 682 sealing plan. In Pedro Alexandre, óleos industriais and água industrial make up the fluid portfolio served by local plants — each with its own requirements on available NPSH, in-service viscosity and sealing strategy (Plan 11/13/52/53 by criticality). FB Bombas is the national industrial-pump manufacturer serving Pedro Alexandre (BA) with direct factory service from Cabreúva-SP. For local industry — the dominant industrial calling of Pedro Alexandre — we recommend the FBE, FBCN, FBOT and FBEI series, with field-validated materials, cartridge mechanical seal and characteristic curve certified on an hydraulic bench. CRCC Petrobras certification valid in BA qualifies FB Bombas for direct supply to Pedro Alexandre in refining and petrochemical operations, with FBE and FBCN series compliant with API 610 / API 676 and materials specified per NACE MR0175 for sour service with H2S. FB Bombas serves Pedro Alexandre from its Cabreúva-SP factory, with transport via BR-116 (via Fernão Dias BR-381 até MG) and application-engineering support for dimensioning according to the actual operation profile.

Nationwide Service
1764km from factory
80+

Years

API

Certified

100%

Warranty

80+
Years in Market
CRCC
Petrobras Approved
27
States Served
API 610/676
Certified Pumps

Technical summary

Direct answer for industrial projects — recommended series, standards compliance and logistics.

Technical summary

The FBCN (normalized centrifugal) line is specified in Pedro Alexandre, Bahia for local industry — head up to 138 m, temperature up to 260°C. API 610, in-house manufacturing in Cabreúva-SP (1774 km).

Local technical content

FBCN Centrifugal Pumps Industrial in Pedro Alexandre

Local context

The sugar-and-ethanol cluster of Maceio is 240 km from Pedro Alexandre, generating economic spillover and correlated technical demand — common in pumping projects involving both cities. The BR-116 (via Fernão Dias BR-381 até MG) corridor combined with highways BR-116, BR-101 and BR-324 composes the freight mesh to Pedro Alexandre — a cost variable in pricing skids, pump-motor sets and indivisible cargo with escort. In Pedro Alexandre, FB Bombas serves projects with in-house application engineering: system-curve analysis, NPSH balance (available vs required), series selection (FBE / FBCN / FBOT / FBEI / FBFS) and API 682 sealing plan. In Pedro Alexandre, óleos industriais and água industrial make up the fluid portfolio served by local plants — each with its own requirements on available NPSH, in-service viscosity and sealing strategy (Plan 11/13/52/53 by criticality). FB Bombas is the national industrial-pump manufacturer serving Pedro Alexandre (BA) with direct factory service from Cabreúva-SP. For local industry — the dominant industrial calling of Pedro Alexandre — we recommend the FBE, FBCN, FBOT and FBEI series, with field-validated materials, cartridge mechanical seal and characteristic curve certified on an hydraulic bench. CRCC Petrobras certification valid in BA qualifies FB Bombas for direct supply to Pedro Alexandre in refining and petrochemical operations, with FBE and FBCN series compliant with API 610 / API 676 and materials specified per NACE MR0175 for sour service with H2S. FB Bombas serves Pedro Alexandre from its Cabreúva-SP factory, with transport via BR-116 (via Fernão Dias BR-381 até MG) and application-engineering support for dimensioning according to the actual operation profile.

Technical solutions

Typical applications mapped for Pedro Alexandre include transferência geral and utilidades — each with its own requirements for NPSH, acceptable pulsation and start-up strategy. FBEI and FBCN: this is the set of FB series with initial technical fit for Pedro Alexandre, respecting fluid characteristics and the regional operating regime. The technical profile of the sucroalcooleiro cluster near Pedro Alexandre involves sugarcane juice, vinasse, molasses and thermal oil for evaporators — 24/7 operation during harvest — information that guides preliminary sizing of FB series. Technical-and-commercial support for Pedro Alexandre is covered from Cabreúva-SP, with typical lead time for critical parts of 96h to 7 days via dedicated carrier.

Why FB Bombas

The demand profile in Pedro Alexandre reflects medium density — regular and predictable opportunity pipeline. Fluid-roster complexity in Pedro Alexandre is low — lean fluid roster — technical operation focused on few main vectors. Typical seasonality of the sucroalcooleiro cluster (concentrated harvest season (Apr-Nov) creates short maintenance windows and intense parts demand during milling) directly impacts supply scheduling and PMs in Pedro Alexandre. Due to proximity to the sucroalcooleiro cluster, Pedro Alexandre shares a technical agenda with juice circulation, molasses transfer, vinasse boost and thermal oil for evaporators — a direct path to series and materials selection. Working with óleos industriais and água industrial in Pedro Alexandre demands attention to viscosity at operating temperature, residual abrasiveness and chemical compatibility — criteria FB engineering applies on every project. In Pedro Alexandre, series FBEI for transferência geral and series FBCN for utilidades — a combination that covers the typical local industrial demand.

Logistics & support

1774 km separate the Cabreúva-SP factory from Pedro Alexandre via BR-116 (via Fernão Dias BR-381 até MG) — an axis sized for movement of pumps, skids and pump-and-motor sets. Alternative routing to Pedro Alexandre can use BR-116, BR-101 and BR-324, which helps in heavy-traffic situations or maintenance on specific roads. The technical-service model in Pedro Alexandre is structured as technical visits planned as a mission — concentrated agenda to cover multiple plants in a single trip.

Request your proposal

For projects with FBCN pumps in Pedro Alexandre, talk to FB application engineering: viscosity analysis, available NPSH, seal materials and operating regime — technical response within 24-48 business hours.

Talk to engineering
for Pedro Alexandre
Why FB Bombas

National leadership in industrial pumping

For over 82 years, we have manufactured industrial pumps in Cabreúva-SP. From north to south, we serve the country's main industrial hubs with gear (FBE/FBEI) and centrifugal (FBCN/FBOT) pumps — engineered, machined and assembled in our own manufacturing facility.

Our engineering team sizes each pump for the customer's actual application, with bench testing before shipping. This technical rigor — combined with direct support from our team — is what has sustained the trust of groups like Petrobras, Vale and CSN for generations.

FB Bombas manufacturing plant in Cabreúva-SP — Brazilian industrial pump manufacturer
Brazil Differentiators

Advantages for your Industrial Operation

Four differentiators that make FB Bombas the choice of leading Brazilian industries.

Complete National Coverage

Technical support across all 27 Brazilian states, from inland regions to major industrial capitals.

Brazil-Wide Logistics

Nationwide deliveries through partner carrier network with optimized lead times.

Dedicated Engineering

Technical team available for sizing, project work and after-sales support across any region.

Strategic Stock

Original parts in stock for all series, ensuring operational continuity with zero downtime.

Discover FB Bombas

Own factory in Cabreúva/SP with full production capability, serving Pedro Alexandre and all of Brazil

FB Bombas manufacturing plant with CNC machines and technical team in Cabreúva SP Brazil

Own Manufacturing

Engineering, CNC machining and assembly — all integrated in our Cabreúva/SP factory.

FB Bombas fire fighting system delivered to customer

Custom Projects

We size and build complete systems, ready for installation at your industrial plant.

FB Bombas replacement parts warehouse for industrial pumps

Replacement Parts

We keep original parts in stock for all series, ensuring continuity of your operation.

FBCN centrifugal pumps on FB Bombas factory floor

Industrial Production

Production line with centrifugal and gear pumps assembled and tested in our manufacturing plant.

FB Bombas serves Pedro Alexandre and the entire Bahia region with gear pumps (internal & external) and centrifugal pumps for your industrial application. Request a quote and receive a personalized proposal.

Request Quote
FB Bombas production line with FBCN centrifugal pumps on the factory floor
Industrial Capacity

Production line dedicated to industrial pumps

Our manufacturing plant in Cabreúva-SP integrates engineering, CNC machining and assembly under one roof. Every pump is validated through bench testing before reaching the customer — ensuring it ships ready for real application.

350°C
Max. Temp. FBOT
1,350 l/min
Max. Flow FBE
2,200 m³/h
Max. Flow FBCN

Companies that Trust FB Bombas

Present in the largest industrial projects in Brazil and Latin America

Petrobras - Cliente FB Bombas
Vale - Cliente FB Bombas
BASF - Cliente FB Bombas
CSN - Cliente FB Bombas
WEG - Cliente FB Bombas
Cargill - Cliente FB Bombas
Ipiranga - Cliente FB Bombas
Mahle - Cliente FB Bombas
3M - Cliente FB Bombas

Centrifugal Pumps in Nearby Cities

Regional service from Pedro Alexandre — same series, same factory in Cabreúva/SP.

Frequently Asked Questions about Pedro Alexandre

Yes. The FBE and FBCN lines were designed with easy access to wear-prone components, allowing disassembly and inspection with conventional tools. Detailed technical manuals and direct factory replacement parts availability simplify maintenance routines.

Yes. FB Bombas’ application engineering analyzes the installed pump specifications (flow, pressure, viscosity, temperature) and proposes dimensional or functional technical equivalence with one of our series. Many clients in Pedro Alexandre have already made this replacement with gains in lead time, cost and local support.

Sizing is performed by FB Bombas’ application engineering team based on four key variables: desired flow, differential pressure, working temperature and fluid viscosity. Additional data such as available NPSH, operating cycle and fluid chemical compatibility are also considered. The service is free of charge for customers in Pedro Alexandre.

To receive a technical quote for industrial pumps in Pedro Alexandre, send via website form, WhatsApp +55 11 97287-4837 or email comercial@fbbombas.com.br the application data: fluid (name + viscosity at operating temperature), target flow (m³/h), discharge head (m), available NPSH, operating temperature and regime (continuous or intermittent). Application engineering responds with a preliminary technical proposal, characteristic curve, suggested materials and delivery lead time.

Yes. FB Bombas offers technical training for operations and maintenance teams in Pedro Alexandre, with modules on: sizing and reading the characteristic curve, identifying cavitation through NPSH, mechanical-seal troubleshooting, laser alignment, ISO 10816 vibration analysis and PM (preventive maintenance) practice with bearing and wear-ring replacement. Training can be delivered at the customer plant or at the Cabreúva/SP factory, in person or hybrid.

Yes. Every FB Bombas pump delivered to Pedro Alexandre comes with a complete technical Data Book: hydraulic test certificate, material certificates (stainless, duplex, ductile cast iron per spec), ISO 21940 G2.5 balancing report, characteristic curve measured on the bench, API 682 mechanical-seal data sheets, operation and maintenance manual, and as-built drawings. All documentation is traceable by the unit serial number.

FB Bombas manufactures three major lines: FBE (external gear) for viscous fluids, FBEI (internal gear) for lubricating fluids, FBCN (normalized centrifugal) for water and low-viscosity fluids, and FBOT (specific centrifugal) for thermal oil circuits. We also serve fire protection systems in compliance with NFPA and NBR 16704.

Mechanical seal configuration is defined by engineering according to the fluid, temperature and operating pressure. Options include single seals, double seals (tandem or back-to-back), cartridge seals and packing glands for specific applications. For hazardous fluids, double seals with barrier are recommended.

Yes. The FBCN series complies with ASME B73.1 (North American standard for horizontal end-suction process centrifugal pumps) — a feature that enables dimensional retrofit on existing baseplates in Pedro Alexandre plants originally equipped with KSB, Sulzer, Goulds or Flowserve. Shaft dimensions, suction/discharge flanges, casing feet and impeller centerline follow the standard; the rotating set is swapped without changing piping or baseplate.

The FB line covers a wide range: mineral and synthetic oils, asphalt (CAP), BPF fuel oils, petroleum derivatives, molasses, resins, viscous chemical and hydraulic products (FBE series); raw and treated water, process fluids, industrial effluents (FBCN series); thermal oil at elevated temperatures (FBOT series). Each application is sized according to fluid viscosity, temperature and chemical compatibility.

Need gear or centrifugal pumps in Pedro Alexandre?

Fill out the form and our technical team will contact you to size the ideal pump — gear (FBE/FBEI) or centrifugal (FBCN/FBOT).

How we reach youFour required fields. Engineering replies after briefing analysis.
Add technical application dataFlow, fluid, viscosity. More detail means a sharper first reply — all optional.
Your messageDeadline, project standard, notes. Attachments by e-mail afterwards.

Reply after briefing analysis