Technical summary
In Pedro Alexandre, Bahia, FBEI (external gear) serves agronegócio with 12 sizes (1/8" to 6"), pressure up to 22 kgf/cm² and field-validated materials. Cabreúva-SP at 1774 km, 96h to 7 days logistics lead time.


The fluid roster in Pedro Alexandre (defensivos viscosos and água) demands attention to viscosity, operating temperature and chemical compatibility — variables that FB application engineering uses to recommend the proper series. Pedro Alexandre's productive fabric is dominated by agronegócio — sectors where FB Bombas maintains an installed base with normalized series (ASME B73.1) interchangeable with global majors. In Pedro Alexandre, Bahia, FB Bombas serves agronegócio projects with the FBCN series — dedicated application engineering for sizing against the actual system curve, CRCC Petrobras certification and technical compliance with API 610 (centrifugal), API 676 (gear) and NFPA 20 / NBR 16704 (fire fighting). Only 240 km from the sugar-and-ethanol cluster of Maceio, Pedro Alexandre benefits from logistics spillover and movement of technical professionals — FB Bombas has a service track record in the region. Membership in the Nordeste Baiano mesoregion (IBGE) places Pedro Alexandre in a regional economic mesh — a factor FB Bombas uses to optimize multi-city maintenance campaigns and consolidate freight across customers along the same axis. In Pedro Alexandre, FB Bombas serves projects with in-house application engineering: system-curve analysis, NPSH balance (available vs required), series selection (FBE / FBCN / FBOT / FBEI / FBFS) and API 682 sealing plan. Based in Cabreúva-SP at 1774 km via BR-116 (via Fernão Dias BR-381 até MG), FB Bombas delivers to Pedro Alexandre industrial pumps manufactured in-house since 1944 plus continuous technical support.
The fluid roster in Pedro Alexandre (defensivos viscosos and água) demands attention to viscosity, operating temperature and chemical compatibility — variables that FB application engineering uses to recommend the proper series. Pedro Alexandre's productive fabric is dominated by agronegócio — sectors where FB Bombas maintains an installed base with normalized series (ASME B73.1) interchangeable with global majors. In Pedro Alexandre, Bahia, FB Bombas serves agronegócio projects with the FBCN series — dedicated application engineering for sizing against the actual system curve, CRCC Petrobras certification and technical compliance with API 610 (centrifugal), API 676 (gear) and NFPA 20 / NBR 16704 (fire fighting). Only 240 km from the sugar-and-ethanol cluster of Maceio, Pedro Alexandre benefits from logistics spillover and movement of technical professionals — FB Bombas has a service track record in the region. Membership in the Nordeste Baiano mesoregion (IBGE) places Pedro Alexandre in a regional economic mesh — a factor FB Bombas uses to optimize multi-city maintenance campaigns and consolidate freight across customers along the same axis. In Pedro Alexandre, FB Bombas serves projects with in-house application engineering: system-curve analysis, NPSH balance (available vs required), series selection (FBE / FBCN / FBOT / FBEI / FBFS) and API 682 sealing plan. Based in Cabreúva-SP at 1774 km via BR-116 (via Fernão Dias BR-381 até MG), FB Bombas delivers to Pedro Alexandre industrial pumps manufactured in-house since 1944 plus continuous technical support.

Years
Certified
Warranty
Direct answer for industrial projects — recommended series, standards compliance and logistics.
In Pedro Alexandre, Bahia, FBEI (external gear) serves agronegócio with 12 sizes (1/8" to 6"), pressure up to 22 kgf/cm² and field-validated materials. Cabreúva-SP at 1774 km, 96h to 7 days logistics lead time.
The fluid roster in Pedro Alexandre (defensivos viscosos and água) demands attention to viscosity, operating temperature and chemical compatibility — variables that FB application engineering uses to recommend the proper series. Pedro Alexandre's productive fabric is dominated by agronegócio — sectors where FB Bombas maintains an installed base with normalized series (ASME B73.1) interchangeable with global majors. In Pedro Alexandre, Bahia, FB Bombas serves agronegócio projects with the FBCN series — dedicated application engineering for sizing against the actual system curve, CRCC Petrobras certification and technical compliance with API 610 (centrifugal), API 676 (gear) and NFPA 20 / NBR 16704 (fire fighting). Only 240 km from the sugar-and-ethanol cluster of Maceio, Pedro Alexandre benefits from logistics spillover and movement of technical professionals — FB Bombas has a service track record in the region. Membership in the Nordeste Baiano mesoregion (IBGE) places Pedro Alexandre in a regional economic mesh — a factor FB Bombas uses to optimize multi-city maintenance campaigns and consolidate freight across customers along the same axis. In Pedro Alexandre, FB Bombas serves projects with in-house application engineering: system-curve analysis, NPSH balance (available vs required), series selection (FBE / FBCN / FBOT / FBEI / FBFS) and API 682 sealing plan. Based in Cabreúva-SP at 1774 km via BR-116 (via Fernão Dias BR-381 até MG), FB Bombas delivers to Pedro Alexandre industrial pumps manufactured in-house since 1944 plus continuous technical support.
What defines the FBE external gear pump in Pedro Alexandre is its behavior under variable pressure: being positive displacement, flow follows speed and practically ignores backpressure swings in the line — the typical case of defensivos e fertilizantes líquidos. Two installation requirements follow from this physics: a sized relief valve on the discharge and, for fluids that harden when cold, a heating jacket on the pump body. In Pedro Alexandre, transferência em armazéns and irrigação de processo form the typical-use portfolio — guiding series selection, sealing configuration and internal coating according to fluid abrasiveness or aggressiveness. FBEI and FBCN: this is the set of FB series with initial technical fit for Pedro Alexandre, respecting fluid characteristics and the regional operating regime. For Pedro Alexandre, the FB protocol includes hydrostatic test at 1.5× design pressure, performance run and ISO 21940 G2.5 balancing — all documented in the Data Book.
In Pedro Alexandre, the low complexity index in the fluid mix sets lean fluid roster — technical operation focused on few main vectors — a factor adjusting both technical-spec depth and materials-catalogue scope. In Pedro Alexandre, medium density — regular and predictable opportunity pipeline — a characteristic that sizes FB's commercial strategy: application-engineering coverage, visit cadence and depth of consignment stock. With an agribusiness profile (27% of value added in agriculture, IBGE 2021) and a 2023 GDP of R$ 179 million, Pedro Alexandre concentrates demand on pumping tied to agro processing — from syrups and molasses to effluents and line cleaning. Pedro Alexandre: defensivos viscosos and água. Each fluid defines a distinct set of pump requirements — flow, available NPSH, sealing strategy. Pedro Alexandre has agronegócio as its main industrial-pump application front — from primary transfer to internal circulation in process equipment. juice circulation, molasses transfer, vinasse boost and thermal oil for evaporators: this is the typical application set around the sucroalcooleiro cluster in which Pedro Alexandre sits.
For Pedro Alexandre, 72h to 7 days, depending on modal and dry season is the standard contractual transit window — compressible via emergency air modal for critical parts, on specific demand. Cabreúva-SP → Pedro Alexandre via BR-116 (via Fernão Dias BR-381 até MG) (1774 km): a corridor with regular FB freight history, supporting indivisible loads and sets with escort when the gauge demands. For Pedro Alexandre, FB dispatch is preceded by: hydrostatic test at 1.5× design pressure, performance run with curve points, G2.5 dynamic balancing and Data Book closure — all traceable by serial number.
Technical inquiry for the FBE series in Pedro Alexandre: real-curve sizing, material recommendation and sealing configuration. Direct service from the FB team.
Talk to engineeringFor over 82 years, we have manufactured industrial pumps in Cabreúva-SP. From north to south, we serve the country's main industrial hubs with gear (FBE/FBEI) and centrifugal (FBCN/FBOT) pumps — engineered, machined and assembled in our own manufacturing facility.
Our engineering team sizes each pump for the customer's actual application, with bench testing before shipping. This technical rigor — combined with direct support from our team — is what has sustained the trust of groups like Petrobras, Vale and CSN for generations.

What changes when the pump comes straight from the manufacturer: engineering, stock and logistics under one roof in Cabreúva-SP.
Technical support across all 27 Brazilian states, from inland regions to major industrial capitals.
Nationwide deliveries through partner carrier network with optimized lead times.
Technical team available for sizing, project work and after-sales support across any region.
Original spare parts for the FBE, FBEI, FBCN and FBOT series stocked at our own factory, ready to ship.
Own factory in Cabreúva/SP with full production capability, serving Pedro Alexandre and all of Brazil

Engineering, CNC machining and assembly — all integrated in our Cabreúva/SP factory.

We size and build complete systems, ready for installation at your industrial plant.

We keep original parts in stock for all series, ensuring continuity of your operation.

Production line with centrifugal and gear pumps assembled and tested in our manufacturing plant.
FB Bombas serves Pedro Alexandre and the entire Bahia region with gear pumps (internal & external) and centrifugal pumps for your industrial application. Request a quote and receive a personalized proposal.
Request QuoteComplete pumping solutions for all industrial needs
Our technical team is ready to develop the ideal solution for your application
Contact Us
Our manufacturing plant in Cabreúva-SP integrates engineering, CNC machining and assembly under one roof. Every pump is validated through bench testing before reaching the customer — ensuring it ships ready for real application.
Present in the largest industrial projects in Brazil and Latin America
See specific solutions for Pedro Alexandre
Brazilian sectors for which FB Bombas sizes equipment — complete technical guides per application.
Regional service from Pedro Alexandre — same series, same factory in Cabreúva/SP.
Yes — with a structural advantage: since the FBE, FBEI, FBCN and FBOT series are manufactured entirely in Brazil, parts ship from the factory itself in Cabreúva/SP, with short lead times for planned shutdowns and priority handling for emergencies. The direct effect is a lower total cost of ownership.
Every FB pump leaves the factory with a warranty against manufacturing defects, under the terms detailed in the commercial proposal. The condition is that installation, operation and maintenance respect the manual's parameters and the sizing defined by engineering. For details on your project in Pedro Alexandre, talk to our technical team.
Yes. On the factory bench in Cabreúva/SP the FAT (Factory Acceptance Test) is carried out: hydraulic test with characteristic-curve measurement (Q × H), hydraulic efficiency, NPSHr and ISO 10816 vibration — witnessed by customer inspection when specified. The SAT (Site Acceptance Test) on Pedro Alexandre projects counts on application engineering during commissioning, including startup checklist, laser alignment and recording of the baseline vibration signature.
Three paths lead to a quote: the website form, WhatsApp +55 11 97287-4837 and the email comercial@fbbombas.com.br. With the application data in hand (fluid, flow, pressure, temperature), the technical team returns a proposal already sized for your scenario in Pedro Alexandre.
Yes. The process starts with FB Bombas' application engineering, which studies the installed pump's specifications — flow, pressure, viscosity, temperature — and indicates the dimensional or functional technical equivalence within our series. In Pedro Alexandre, many clients have already completed this swap and gained in lead time, cost and local support.
Shipment is by road via BR-116 (via Fernão Dias BR-381 até MG), with industrial packaging suited to the journey and tracking until delivery. Sizing, proposal and technical support run in parallel through remote channels — distance does not change the engineering scope, only the logistics planning, reflected in the proposal schedule.
Sizing is performed by FB Bombas’ application engineering team based on four key variables: desired flow, differential pressure, working temperature and fluid viscosity. Additional data such as available NPSH, operating cycle and fluid chemical compatibility are also considered. The service is free of charge for customers in Pedro Alexandre.
There is no single configuration — engineering selects the mechanical seal based on the fluid, temperature and operating pressure. The range includes single seals, double seals in tandem or back-to-back arrangement, cartridge seals and packing glands in specific applications. When the fluid is hazardous, the recommendation is a double seal with barrier.
They are. In energy consumption, nothing weighs more than sizing correctly: oversized or undersized pumps generate waste. FB Bombas engineering's job is to define the ideal operating point for the actual process conditions in Pedro Alexandre, optimizing flow, pressure and power together.
When there is a plant shutdown in Pedro Alexandre, FB Bombas triggers an emergency flow dedicated to critical parts (mechanical seal, impeller, shaft, wear ring, bearings): the order gets pre-invoicing, dispatch is prioritized and the modal can change — express road or air, decided by distance and criticality. The region defines the typical lead time, with a window negotiable for each case. For those with an installed base and scheduled PM, there is the option of consigning part of the stock at the plant.
Fill out the form and our technical team will contact you to size the ideal pump — gear (FBE/FBEI) or centrifugal (FBCN/FBOT).