Skip to main content
FB Bombas industrial facility in Cabreúva-SP, Brazil
100% Brazilian Company
FBCN Centrifugal Pumps

FBCN Centrifugal Pumps in Vargem

Just 63 km separate Vargem from the refining cluster of Sao Jose Dos Campos — a distance that enables joint technical visits and dilution of mobilization cost across multiple customers. Logistically, the city connects to Cabreúva-SP via SP-300 Rodovia Marechal Rondon (via Rodoanel SP-021), complemented by alternatives SP-300, SP-021, SP-330, BR-116 and BR-374 — a network that supports technical service within tight operational windows. Brazilian industrial-pump manufacturer since 1944, FB Bombas supplies Vargem, São Paulo with the FBE, FBCN, FBOT, FBEI series and FBFS fire-fighting systems — designed and produced in Cabreúva-SP with API 610 / API 676 compliance, ASME B73.1 normalization (interchangeable with global manufacturers) and a traceable Data Book on every unit shipped. FB Bombas technical service in Vargem covers centrifugal- and gear-pump sizing, commissioning support, assisted startup and operator training — a scope that spans the full technical-supply cycle. Typical fluids in Vargem's industrial operations include óleos industriais and água industrial — a vector that determines whether the correct specification is the FBE/FBEI (gear) or FBCN/FBOT (centrifugal / thermal oil) series. The city sits within the IBGE mesoregion Macro Metropolitana Paulista, a regional grouping of municipalities with similar economic and logistics profiles — useful for comparative analysis and technical-visit routing. Service to Vargem is coordinated from the Cabreúva-SP factory, route SP-300 Rodovia Marechal Rondon (via Rodoanel SP-021) (87 km), with a technical team for selection, commissioning and replacement support.

Nationwide Service
77km from factory
80+

Years

API

Certified

100%

Warranty

80+
Years in Market
CRCC
Petrobras Approved
27
States Served
API 610/676
Certified Pumps

Technical summary

Direct answer for industrial projects — recommended series, standards compliance and logistics.

Technical summary

FBCN centrifugal pumps (FB Bombas) in Vargem, São Paulo: sized for local industry, flow up to 2,200 m³/h, API 610 and ASME B73.1 compliance. Cabreúva-SP at 87 km, typical critical-parts lead time: 24-48h.

Local technical content

FBCN Centrifugal Pumps Industrial in Vargem

Local context

Just 63 km separate Vargem from the refining cluster of Sao Jose Dos Campos — a distance that enables joint technical visits and dilution of mobilization cost across multiple customers. Logistically, the city connects to Cabreúva-SP via SP-300 Rodovia Marechal Rondon (via Rodoanel SP-021), complemented by alternatives SP-300, SP-021, SP-330, BR-116 and BR-374 — a network that supports technical service within tight operational windows. Brazilian industrial-pump manufacturer since 1944, FB Bombas supplies Vargem, São Paulo with the FBE, FBCN, FBOT, FBEI series and FBFS fire-fighting systems — designed and produced in Cabreúva-SP with API 610 / API 676 compliance, ASME B73.1 normalization (interchangeable with global manufacturers) and a traceable Data Book on every unit shipped. FB Bombas technical service in Vargem covers centrifugal- and gear-pump sizing, commissioning support, assisted startup and operator training — a scope that spans the full technical-supply cycle. Typical fluids in Vargem's industrial operations include óleos industriais and água industrial — a vector that determines whether the correct specification is the FBE/FBEI (gear) or FBCN/FBOT (centrifugal / thermal oil) series. The city sits within the IBGE mesoregion Macro Metropolitana Paulista, a regional grouping of municipalities with similar economic and logistics profiles — useful for comparative analysis and technical-visit routing. Service to Vargem is coordinated from the Cabreúva-SP factory, route SP-300 Rodovia Marechal Rondon (via Rodoanel SP-021) (87 km), with a technical team for selection, commissioning and replacement support.

Technical solutions

Lead time for critical parts to Vargem is typically 24-48h — a function of distance (87 km) and the available road modal. The technical profile of the refino cluster near Vargem involves crude oil, derivatives, high temperature (up to 260°C in FBCN, 350°C in FBOT) and API 610 qualification — information that guides preliminary sizing of FB series. Technical fit in Vargem points to FBEI and FBCN as the series suitable for typical local operations — a baseline recommendation; the final specification depends on the specific process parameters. In Vargem, transferência geral and utilidades form the typical-use portfolio — guiding series selection, sealing configuration and internal coating according to fluid abrasiveness or aggressiveness.

Why FB Bombas

Vargem shows a low industrial density — typically standalone projects, without regional cumulative volume pattern, a structural factor that modulates predictability of recurring revenue and the viable contract type (spot, annual, multi-year). The low fluid-complexity profile in Vargem (lean fluid roster — technical operation focused on few main vectors) shapes FB's technical strategy: standardization versus case-by-case customization. refino cluster near Vargem imposes a scheduled outages every 3-5 years (turnaround) — synchronized demand peaks across the supply chain pace — syncing equipment purchases, PM contracting and regional technical-team mobilization. For Vargem, series FBEI for transferência geral and series FBCN for utilidades — initial reference for technical discussion with application engineering. crude transfer, distillation-tower circulation, charge pumps for reactors and movement of derivatives: this is the typical application set around the refino cluster in which Vargem sits. Vargem: óleos industriais and água industrial. Each fluid defines a distinct set of pump requirements — flow, available NPSH, sealing strategy.

Logistics & support

The main logistics axis between Cabreúva-SP and Vargem is SP-300 Rodovia Marechal Rondon (via Rodoanel SP-021), totaling 87 km — a route that sets the default delivery time for finished equipment. Typical transit time to Vargem: 12-24h via direct road modal — the window used in FB Bombas' standard commercial commitment. Technical-service coverage for Vargem involves in-person technical visits with rapid mobilization — Cabreúva → customer route in a few hours.

Request your proposal

FB engineers serve Vargem for the FBCN series with a sized proposal — duty point, fluid, field conditions and supply lead time.

Talk to engineering
for Vargem
Why FB Bombas

National leadership in industrial pumping

For over 82 years, we have manufactured industrial pumps in Cabreúva-SP. From north to south, we serve the country's main industrial hubs with gear (FBE/FBEI) and centrifugal (FBCN/FBOT) pumps — engineered, machined and assembled in our own manufacturing facility.

Our engineering team sizes each pump for the customer's actual application, with bench testing before shipping. This technical rigor — combined with direct support from our team — is what has sustained the trust of groups like Petrobras, Vale and CSN for generations.

FB Bombas manufacturing plant in Cabreúva-SP — Brazilian industrial pump manufacturer
Brazil Differentiators

Advantages for your Industrial Operation

Four differentiators that make FB Bombas the choice of leading Brazilian industries.

Complete National Coverage

Technical support across all 27 Brazilian states, from inland regions to major industrial capitals.

Brazil-Wide Logistics

Nationwide deliveries through partner carrier network with optimized lead times.

Dedicated Engineering

Technical team available for sizing, project work and after-sales support across any region.

Strategic Stock

Original parts in stock for all series, ensuring operational continuity with zero downtime.

Discover FB Bombas

Own factory in Cabreúva/SP with full production capability, serving Vargem and all of Brazil

FB Bombas manufacturing plant with CNC machines and technical team in Cabreúva SP Brazil

Own Manufacturing

Engineering, CNC machining and assembly — all integrated in our Cabreúva/SP factory.

FB Bombas fire fighting system delivered to customer

Custom Projects

We size and build complete systems, ready for installation at your industrial plant.

FB Bombas replacement parts warehouse for industrial pumps

Replacement Parts

We keep original parts in stock for all series, ensuring continuity of your operation.

FBCN centrifugal pumps on FB Bombas factory floor

Industrial Production

Production line with centrifugal and gear pumps assembled and tested in our manufacturing plant.

FB Bombas serves Vargem and the entire São Paulo region with gear pumps (internal & external) and centrifugal pumps for your industrial application. Request a quote and receive a personalized proposal.

Request Quote
FB Bombas production line with FBCN centrifugal pumps on the factory floor
Industrial Capacity

Production line dedicated to industrial pumps

Our manufacturing plant in Cabreúva-SP integrates engineering, CNC machining and assembly under one roof. Every pump is validated through bench testing before reaching the customer — ensuring it ships ready for real application.

350°C
Max. Temp. FBOT
1,350 l/min
Max. Flow FBE
2,200 m³/h
Max. Flow FBCN

Companies that Trust FB Bombas

Present in the largest industrial projects in Brazil and Latin America

Petrobras - Cliente FB Bombas
Vale - Cliente FB Bombas
BASF - Cliente FB Bombas
CSN - Cliente FB Bombas
WEG - Cliente FB Bombas
Cargill - Cliente FB Bombas
Ipiranga - Cliente FB Bombas
Mahle - Cliente FB Bombas
3M - Cliente FB Bombas

Centrifugal Pumps in Nearby Cities

Regional service from Vargem — same series, same factory in Cabreúva/SP.

Frequently Asked Questions about Vargem

FB Bombas manufactures three major lines: FBE (external gear) for viscous fluids, FBEI (internal gear) for lubricating fluids, FBCN (normalized centrifugal) for water and low-viscosity fluids, and FBOT (specific centrifugal) for thermal oil circuits. We also serve fire protection systems in compliance with NFPA and NBR 16704.

Yes. FB Bombas serves the entire metropolitan region and microregions neighboring Vargem with the same technical support and logistics structure. This regional reach allows serving industrial plants distributed across multiple cities in a coordinated way.

Maximum temperature depends on the series: FBE and FBEI operate up to 350°C with heating jacket and special sealing; FBOT operates up to 350°C in thermal oil circuits; FBCN operates up to 250°C with proper materials and sealing. Correct sizing of sealing and materials is essential for safe operation.

Yes. FB Bombas serves Vargem and the entire surrounding region with supply, technical support and replacement parts directly from the factory in Cabreúva/SP. Support includes sizing at no cost and, for critical projects, on-site technical visits.

Yes. The FAT (Factory Acceptance Test) is executed on the factory bench in Cabreúva/SP, with hydraulic test, characteristic-curve measurement (Q × H), hydraulic efficiency, NPSHr and ISO 10816 vibration — witnessed by customer inspection when specified. For projects in Vargem, the SAT (Site Acceptance Test) is supported by application engineering during commissioning, with startup checklist, laser alignment and baseline vibration-signature capture.

The FB line covers a wide range: mineral and synthetic oils, asphalt (CAP), BPF fuel oils, petroleum derivatives, molasses, resins, viscous chemical and hydraulic products (FBE series); raw and treated water, process fluids, industrial effluents (FBCN series); thermal oil at elevated temperatures (FBOT series). Each application is sized according to fluid viscosity, temperature and chemical compatibility.

Yes. The FBE and FBCN lines were designed with easy access to wear-prone components, allowing disassembly and inspection with conventional tools. Detailed technical manuals and direct factory replacement parts availability simplify maintenance routines.

Yes. The FBCN series complies with ASME B73.1 (North American standard for horizontal end-suction process centrifugal pumps) — a feature that enables dimensional retrofit on existing baseplates in Vargem plants originally equipped with KSB, Sulzer, Goulds or Flowserve. Shaft dimensions, suction/discharge flanges, casing feet and impeller centerline follow the standard; the rotating set is swapped without changing piping or baseplate.

FB Bombas holds: active CRCC at Petrobras (supplier registry for Oil & Gas); compliance with API 676 (international standard for positive displacement pumps — FBE series); compliance with API 610 (standard for centrifugal pumps in refineries — FBCN series); compliance with NFPA (National Fire Protection Association) standards and ABNT NBR 16704 for stationary fire protection pump systems.

Yes. FB Bombas offers technical training for operations and maintenance teams in Vargem, with modules on: sizing and reading the characteristic curve, identifying cavitation through NPSH, mechanical-seal troubleshooting, laser alignment, ISO 10816 vibration analysis and PM (preventive maintenance) practice with bearing and wear-ring replacement. Training can be delivered at the customer plant or at the Cabreúva/SP factory, in person or hybrid.

Need gear or centrifugal pumps in Vargem?

Fill out the form and our technical team will contact you to size the ideal pump — gear (FBE/FBEI) or centrifugal (FBCN/FBOT).

How we reach youFour required fields. Engineering replies after briefing analysis.
Add technical application dataFlow, fluid, viscosity. More detail means a sharper first reply — all optional.
Your messageDeadline, project standard, notes. Attachments by e-mail afterwards.

Reply after briefing analysis