Technical summary
In Floriano, Piauí, FBOT covers caju with ASME B73.1 normalized hydraulics — direct dimensional interchangeability with market references. Cabreúva-SP (1892 km), 96h to 7 days lead time.


Service to Floriano is coordinated from the Cabreúva-SP factory, route BR-316 (via MA) (1892 km), with a technical team for selection, commissioning and replacement support. The city sits within the IBGE mesoregion Sudoeste Piauiense, a regional grouping of municipalities with similar economic and logistics profiles — useful for comparative analysis and technical-visit routing. Positioned in the top 10 of PI, Floriano sustains continuous volume of industrial operations — a profile compatible with structured supply of rotating equipment and recurring technical support. FB Bombas is the national industrial-pump manufacturer serving Floriano (PI) with direct factory service from Cabreúva-SP. For caju — the dominant industrial calling of Floriano — we recommend the FBE, FBCN, FBOT and FBEI series, with field-validated materials, cartridge mechanical seal and characteristic curve certified on an hydraulic bench. For pumping projects in Floriano, FB Bombas provides dedicated application engineering — pre-sizing against the actual system curve, material selection (AISI 316) and on-site commissioning support. FB Bombas maintains in Floriano the technical portfolio of CRCC Petrobras + API 610 + API 676 + ASME B73.1 — a regulatory base that spans refining, petrochemicals, mining, sanitation, food, pulp and paper, sugar-ethanol and steel. Floriano is served by the BR-316 (via MA) axis and also by highways BR-316, BR-135 and BR-343 for heavy-cargo movement — relevant for delivery of mounted skids and large pump-and-motor sets. The óleos comestíveis, água de processo and óleo térmico profile observed in Floriano maps to a precise set of FB series: high viscosity → FBE/FBEI; water and low viscosity → FBCN; heat transfer → FBOT; fire protection → FBFS. Floriano's productive fabric is dominated by caju and alimentos — sectors where FB Bombas maintains an installed base with normalized series (ASME B73.1) interchangeable with global majors.
Service to Floriano is coordinated from the Cabreúva-SP factory, route BR-316 (via MA) (1892 km), with a technical team for selection, commissioning and replacement support. The city sits within the IBGE mesoregion Sudoeste Piauiense, a regional grouping of municipalities with similar economic and logistics profiles — useful for comparative analysis and technical-visit routing. Positioned in the top 10 of PI, Floriano sustains continuous volume of industrial operations — a profile compatible with structured supply of rotating equipment and recurring technical support. FB Bombas is the national industrial-pump manufacturer serving Floriano (PI) with direct factory service from Cabreúva-SP. For caju — the dominant industrial calling of Floriano — we recommend the FBE, FBCN, FBOT and FBEI series, with field-validated materials, cartridge mechanical seal and characteristic curve certified on an hydraulic bench. For pumping projects in Floriano, FB Bombas provides dedicated application engineering — pre-sizing against the actual system curve, material selection (AISI 316) and on-site commissioning support. FB Bombas maintains in Floriano the technical portfolio of CRCC Petrobras + API 610 + API 676 + ASME B73.1 — a regulatory base that spans refining, petrochemicals, mining, sanitation, food, pulp and paper, sugar-ethanol and steel. Floriano is served by the BR-316 (via MA) axis and also by highways BR-316, BR-135 and BR-343 for heavy-cargo movement — relevant for delivery of mounted skids and large pump-and-motor sets. The óleos comestíveis, água de processo and óleo térmico profile observed in Floriano maps to a precise set of FB series: high viscosity → FBE/FBEI; water and low viscosity → FBCN; heat transfer → FBOT; fire protection → FBFS. Floriano's productive fabric is dominated by caju and alimentos — sectors where FB Bombas maintains an installed base with normalized series (ASME B73.1) interchangeable with global majors.

Years
Certified
Warranty
Direct answer for industrial projects — recommended series, standards compliance and logistics.
In Floriano, Piauí, FBOT covers caju with ASME B73.1 normalized hydraulics — direct dimensional interchangeability with market references. Cabreúva-SP (1892 km), 96h to 7 days lead time.
Service to Floriano is coordinated from the Cabreúva-SP factory, route BR-316 (via MA) (1892 km), with a technical team for selection, commissioning and replacement support. The city sits within the IBGE mesoregion Sudoeste Piauiense, a regional grouping of municipalities with similar economic and logistics profiles — useful for comparative analysis and technical-visit routing. Positioned in the top 10 of PI, Floriano sustains continuous volume of industrial operations — a profile compatible with structured supply of rotating equipment and recurring technical support. FB Bombas is the national industrial-pump manufacturer serving Floriano (PI) with direct factory service from Cabreúva-SP. For caju — the dominant industrial calling of Floriano — we recommend the FBE, FBCN, FBOT and FBEI series, with field-validated materials, cartridge mechanical seal and characteristic curve certified on an hydraulic bench. For pumping projects in Floriano, FB Bombas provides dedicated application engineering — pre-sizing against the actual system curve, material selection (AISI 316) and on-site commissioning support. FB Bombas maintains in Floriano the technical portfolio of CRCC Petrobras + API 610 + API 676 + ASME B73.1 — a regulatory base that spans refining, petrochemicals, mining, sanitation, food, pulp and paper, sugar-ethanol and steel. Floriano is served by the BR-316 (via MA) axis and also by highways BR-316, BR-135 and BR-343 for heavy-cargo movement — relevant for delivery of mounted skids and large pump-and-motor sets. The óleos comestíveis, água de processo and óleo térmico profile observed in Floriano maps to a precise set of FB series: high viscosity → FBE/FBEI; water and low viscosity → FBCN; heat transfer → FBOT; fire protection → FBFS. Floriano's productive fabric is dominated by caju and alimentos — sectors where FB Bombas maintains an installed base with normalized series (ASME B73.1) interchangeable with global majors.
For Floriano (1892 km from Cabreúva-SP), the critical-parts logistics cycle runs in 96h to 7 days — a workable window for regular PM campaigns with controlled risk of extended downtime. For óleos comestíveis, água de processo and óleo térmico, the materials recommendation in Floriano converges on austenitic stainless steels (AISI 304/316) with attention to thermal expansion, a starting point adjustable based on field-observed corrosion. Floriano receives equipment after hydraulic testing and ISO 21940 G2.5 balancing — traceable report attached to the Data Book. FBEI and FBOT: this is the set of FB series with initial technical fit for Floriano, respecting fluid characteristics and the regional operating regime. In Floriano, the sealing strategy starts at single cartridge mechanical seal (Plan 11/13) for general service, upgradable to dual when the fluid requires secondary containment — combined with API 682 plan selection (Plan 11/13/52/53/62) and specific commissioning care. Typical applications mapped for Floriano include transferência de óleos, pasteurização and limpeza CIP — each with its own requirements for NPSH, acceptable pulsation and start-up strategy.
In Floriano, very high industrial concentration — territory for multi-customer technical-visit campaigns — a characteristic that sizes FB's commercial strategy: application-engineering coverage, visit cadence and depth of consignment stock. In Floriano, the medium complexity index in the fluid mix sets moderate fluid roster — concentration in a few main technical categories — a factor adjusting both technical-spec depth and materials-catalogue scope. In Floriano, logistics is a significant economic factor — order consolidation and integrated packages are recommended — a variable entering the decision between CIF/FOB freight, order consolidation and contractual delivery window. Floriano ranks among the 10 largest cities in the state at relevant industrial scale — an input that defines commercial priority and relationship type (one-shot, annual program, master agreement). In Floriano, caju accounts for a large share of the pumping load — combining utility lines (water, steam, compressed air) with dedicated process circuits. For Floriano, series FBEI for transferência de óleos and series FBOT for pasteurização and limpeza CIP — initial reference for technical discussion with application engineering. In Floriano, óleos comestíveis, água de processo and óleo térmico form the typical fluid set — guiding both series selection (gear, centrifugal, thermal oil) and constructive detail (closed/open/semi-open impeller). The FBFS line serves Floriano with fire-protection systems compliant with NFPA 20, NBR 16704 and NBR 10897, in electric, diesel and hybrid configurations. Being among the 10 most populous cities in PI, is a regional benchmark of economic activity, Floriano presents volume and application diversity that justify FB Bombas' structured service.
Cabreúva-SP to Floriano: 1892 km via BR-316 (via MA), a consolidated corridor with carriers qualified by FB Bombas for heavy-equipment cargo. Federal highways BR-316, BR-135 and BR-343 make up the access network to Floriano, offering routing flexibility for equipment cargo. Floriano sits in a region where alternative modals (cabotage, emergency air) are considered in situations of operational urgency. Floriano receives equipment within 72h to 7 days, depending on modal and dry season counted from dispatch at the Cabreúva-SP factory. Floriano: technical service is organized as technical visits planned as a mission — concentrated agenda to cover multiple plants in a single trip — the model FB Bombas uses to ensure support without overloading operations.
FB engineers serve Floriano for the FBCN series with a sized proposal — duty point, fluid, field conditions and supply lead time.
Talk to engineeringFor over 82 years, we have manufactured industrial pumps in Cabreúva-SP. From north to south, we serve the country's main industrial hubs with gear (FBE/FBEI) and centrifugal (FBCN/FBOT) pumps — engineered, machined and assembled in our own manufacturing facility.
Our engineering team sizes each pump for the customer's actual application, with bench testing before shipping. This technical rigor — combined with direct support from our team — is what has sustained the trust of groups like Petrobras, Vale and CSN for generations.

Four differentiators that make FB Bombas the choice of leading Brazilian industries.
Technical support across all 27 Brazilian states, from inland regions to major industrial capitals.
Nationwide deliveries through partner carrier network with optimized lead times.
Technical team available for sizing, project work and after-sales support across any region.
Original parts in stock for all series, ensuring operational continuity with zero downtime.
Own factory in Cabreúva/SP with full production capability, serving Floriano and all of Brazil

Engineering, CNC machining and assembly — all integrated in our Cabreúva/SP factory.

We size and build complete systems, ready for installation at your industrial plant.

We keep original parts in stock for all series, ensuring continuity of your operation.

Production line with centrifugal and gear pumps assembled and tested in our manufacturing plant.
FB Bombas serves Floriano and the entire Piauí region with gear pumps (internal & external) and centrifugal pumps for your industrial application. Request a quote and receive a personalized proposal.
Request QuoteSoluções completas em bombeamento industrial com tecnologia de ponta
Our technical team is ready to develop the ideal solution for your application
Fale Conosco
Our manufacturing plant in Cabreúva-SP integrates engineering, CNC machining and assembly under one roof. Every pump is validated through bench testing before reaching the customer — ensuring it ships ready for real application.
Present in the largest industrial projects in Brazil and Latin America
See specific solutions for Floriano
Brazilian sectors for which FB Bombas sizes equipment — complete technical guides per application.
Regional service from Floriano — same series, same factory in Cabreúva/SP.
Yes. The FAT (Factory Acceptance Test) is executed on the factory bench in Cabreúva/SP, with hydraulic test, characteristic-curve measurement (Q × H), hydraulic efficiency, NPSHr and ISO 10816 vibration — witnessed by customer inspection when specified. For projects in Floriano, the SAT (Site Acceptance Test) is supported by application engineering during commissioning, with startup checklist, laser alignment and baseline vibration-signature capture.
Lead time depends on the chosen series, construction materials and stock availability. For standard configuration pumps, lead times are shorter; for special or custom constructions, the schedule is informed in the technical proposal. Logistics for Floriano is handled by our regular road operator.
FB Bombas has been manufacturing industrial pumps since 1944, with over 82 years of continuous experience. The factory in Cabreúva/SP operates with engineering, manufacturing and testing under one roof, ensuring total quality control on every unit supplied to Floriano and all of Brazil.
Yes. FB Bombas serves the entire metropolitan region and microregions neighboring Floriano with the same technical support and logistics structure. This regional reach allows serving industrial plants distributed across multiple cities in a coordinated way.
Yes. FB Bombas is a Brazilian industrial-pump manufacturer since 1944, with a factory in Cabreúva/SP and a technical team for projects in Floriano. The FBCN (centrifugal), FBE/FBEI (gear) and FBOT (thermal oil) series cover applications typically served by global manufacturers such as KSB, Sulzer, Imbil and Grundfos — with advantages in lead time (no import), direct support without intermediaries, fast spare-parts availability and Portuguese-speaking application engineering. For retrofits, ASME B73.1 normalization ensures dimensional interchangeability with existing baseplates.
Shorter delivery times (no import dependency), direct technical support from FB engineering, replacement parts with in-house manufacturing, prices in local currency (no exchange rate exposure) and on-site service for projects in Floriano and surrounding areas. FB Bombas has been manufacturing in Brazil since 1944.
For critical parts (mechanical seal, impeller, shaft, wear ring, bearings) during a plant shutdown in Floriano, FB Bombas runs an emergency flow: pre-invoicing, priority dispatch and alternative modal (express road or air transport depending on distance and criticality). Typical lead time varies by region, with a window negotiable case by case. For customers with an installed base and scheduled PM, part of the stock can be kept on consignment at the plant.
Maximum temperature depends on the series: FBE and FBEI operate up to 350°C with heating jacket and special sealing; FBOT operates up to 350°C in thermal oil circuits; FBCN operates up to 250°C with proper materials and sealing. Correct sizing of sealing and materials is essential for safe operation.
Yes. The FBE and FBCN lines were designed with easy access to wear-prone components, allowing disassembly and inspection with conventional tools. Detailed technical manuals and direct factory replacement parts availability simplify maintenance routines.
The FB Bombas rotating set is balanced per ISO 21940 G2.5 (a balancing grade equivalent to API 610 requirements for heavy-duty service) — required for critical projects in Floriano with continuous regime, plants with online vibration monitoring or applications with high cost of unplanned downtime. For machines running above 3,600 RPM or with rotating mass over 50 kg, balancing is performed on two planes with a piezoelectric sensor.
Fill out the form and our technical team will contact you to size the ideal pump — gear (FBE/FBEI) or centrifugal (FBCN/FBOT).