Technical summary
For industrial water and low-viscosity fluids in comércio (Ouricuri, Pernambuco), FB engineering recommends FBCN. ASME B73.1 compliance and hydraulic testing, 96h to 7 days lead time from Cabreúva-SP.


Service to Ouricuri is coordinated from the Cabreúva-SP factory, route BR-101 (via AL) (1873 km), with a technical team for selection, commissioning and replacement support. The road network BR-101, BR-232 and BR-116, with BR-101 (via AL) as the main axis, defines response time for critical-part shipments and technical visits to Ouricuri. Ouricuri sits 474 km from the industrial district cluster centered in Maracanau, a proximity that usually means shared suppliers and aligned maintenance standards. Under the IBGE Sertão Pernambucano mesoregion grouping, Ouricuri shares per-capita GDP, workforce profile and environmental-licensing patterns with adjacent cities — macroeconomic variables that reinforce predictability of local B2B demand. In Ouricuri, Pernambuco, FB Bombas serves comércio projects with the FBCN series — dedicated application engineering for sizing against the actual system curve, CRCC Petrobras certification and technical compliance with ASME B73.1 (centrifugal), API 676 (gear) and NFPA 20 / NBR 16704 (fire fighting). FB Bombas application engineering owns technical specification in Ouricuri — from customer data sheet to the final Data Book delivered with the pump, through application review, FAT on the hydraulic bench and on-site SAT support. FB Bombas serves Ouricuri with a complete aftermarket package for FB pumps — factory spare parts, preventive maintenance, vibration troubleshooting (ISO 10816 analysis), ISO 21940 G2.5 balancing and replacement of a normalized pump on the existing ASME B73.1 baseplate. Comércio operations in Ouricuri map to the FB Bombas FBCN series. FBCN pumps for building systems, water and utilities in commercial establishments. Certified characteristic curve covers Compact, Silent, Low consumption. Ouricuri's productive fabric is dominated by comércio — sectors where FB Bombas maintains an installed base with normalized series (ASME B73.1) interchangeable with global majors.
Service to Ouricuri is coordinated from the Cabreúva-SP factory, route BR-101 (via AL) (1873 km), with a technical team for selection, commissioning and replacement support. The road network BR-101, BR-232 and BR-116, with BR-101 (via AL) as the main axis, defines response time for critical-part shipments and technical visits to Ouricuri. Ouricuri sits 474 km from the industrial district cluster centered in Maracanau, a proximity that usually means shared suppliers and aligned maintenance standards. Under the IBGE Sertão Pernambucano mesoregion grouping, Ouricuri shares per-capita GDP, workforce profile and environmental-licensing patterns with adjacent cities — macroeconomic variables that reinforce predictability of local B2B demand. In Ouricuri, Pernambuco, FB Bombas serves comércio projects with the FBCN series — dedicated application engineering for sizing against the actual system curve, CRCC Petrobras certification and technical compliance with ASME B73.1 (centrifugal), API 676 (gear) and NFPA 20 / NBR 16704 (fire fighting). FB Bombas application engineering owns technical specification in Ouricuri — from customer data sheet to the final Data Book delivered with the pump, through application review, FAT on the hydraulic bench and on-site SAT support. FB Bombas serves Ouricuri with a complete aftermarket package for FB pumps — factory spare parts, preventive maintenance, vibration troubleshooting (ISO 10816 analysis), ISO 21940 G2.5 balancing and replacement of a normalized pump on the existing ASME B73.1 baseplate. Comércio operations in Ouricuri map to the FB Bombas FBCN series. FBCN pumps for building systems, water and utilities in commercial establishments. Certified characteristic curve covers Compact, Silent, Low consumption. Ouricuri's productive fabric is dominated by comércio — sectors where FB Bombas maintains an installed base with normalized series (ASME B73.1) interchangeable with global majors.

Years
Compliant
Tested
Direct answer for industrial projects — recommended series, standards compliance and logistics.
For industrial water and low-viscosity fluids in comércio (Ouricuri, Pernambuco), FB engineering recommends FBCN. ASME B73.1 compliance and hydraulic testing, 96h to 7 days lead time from Cabreúva-SP.
Service to Ouricuri is coordinated from the Cabreúva-SP factory, route BR-101 (via AL) (1873 km), with a technical team for selection, commissioning and replacement support. The road network BR-101, BR-232 and BR-116, with BR-101 (via AL) as the main axis, defines response time for critical-part shipments and technical visits to Ouricuri. Ouricuri sits 474 km from the industrial district cluster centered in Maracanau, a proximity that usually means shared suppliers and aligned maintenance standards. Under the IBGE Sertão Pernambucano mesoregion grouping, Ouricuri shares per-capita GDP, workforce profile and environmental-licensing patterns with adjacent cities — macroeconomic variables that reinforce predictability of local B2B demand. In Ouricuri, Pernambuco, FB Bombas serves comércio projects with the FBCN series — dedicated application engineering for sizing against the actual system curve, CRCC Petrobras certification and technical compliance with ASME B73.1 (centrifugal), API 676 (gear) and NFPA 20 / NBR 16704 (fire fighting). FB Bombas application engineering owns technical specification in Ouricuri — from customer data sheet to the final Data Book delivered with the pump, through application review, FAT on the hydraulic bench and on-site SAT support. FB Bombas serves Ouricuri with a complete aftermarket package for FB pumps — factory spare parts, preventive maintenance, vibration troubleshooting (ISO 10816 analysis), ISO 21940 G2.5 balancing and replacement of a normalized pump on the existing ASME B73.1 baseplate. Comércio operations in Ouricuri map to the FB Bombas FBCN series. FBCN pumps for building systems, water and utilities in commercial establishments. Certified characteristic curve covers Compact, Silent, Low consumption. Ouricuri's productive fabric is dominated by comércio — sectors where FB Bombas maintains an installed base with normalized series (ASME B73.1) interchangeable with global majors.
For Ouricuri (1873 km from Cabreúva-SP), the critical-parts logistics cycle runs in 96h to 7 days — a workable window for regular PM campaigns with controlled risk of extended downtime. ASME B73.1 for horizontal normalized centrifugal pumps — consolidated market standard: this is the normative package applied in Ouricuri — defining acceptance testing, dimensional tolerances, material requirements and the Data Book delivered to the customer. The distrito-industrial cluster near Ouricuri brings a technical agenda of variable mix: specialty chemicals, hydraulic oils, purified water and thermal oil — a reference FB Bombas uses as a benchmark for initial sizing and series selection. For water, condensate and process fluids in Ouricuri, the FBCN adds two maintenance advantages: back-pull-out construction, which frees the rotating assembly without dismantling piping, and dimensional interchangeability with the international process-pump standard — direct retrofit on the existing baseplate.
Demand in Ouricuri is characterized by high industrial density — multiple plants in a small radius, meaningful cumulative demand, a typical regional pattern of the mesoregion. Ouricuri: belongs to the set of cities with relevant industrial scale in the state, a structural variable in the commercial offer. Observed seasonal pattern: variable seasonality depending on plant mix — individualized planning. Ouricuri follows the same rhythm as the nearby distrito-industrial cluster. In Ouricuri, value added is dominated by services (42.3%, IBGE 2021), with a 2023 GDP of R$ 1 billion — a profile where pumping demand concentrates on building infrastructure, sanitation, HVAC and utilities, FBCN centrifugal territory. In Ouricuri, comércio accounts for a large share of the pumping load — combining utility lines (water, steam, compressed air) with dedicated process circuits. For Ouricuri, the FBFS line offers a complete fire-protection package: main pump, jockey, control panel NFPA 20 and diesel fuel tank — scope per NFPA 20. In Ouricuri, engineered-to-order projects benefit from the FB combination: normalized baseline hydraulics + tailored customization (instrumentation, automation, special materials) with scope-defined lead time. Ouricuri, among the 50 most populous cities in PE, maintains a relevant industrial base, sustains a predictable B2B demand chain — an ideal profile for scheduled supply and multi-year replacement contracts. In Ouricuri, near a distrito-industrial cluster, applications such as diverse applications — specialty chemicals, hydraulic oils, purified water and thermal oils make up the operational agenda — each backed by technical references in the FBE/FBCN/FBOT catalogues.
The BR-101 (via AL) corridor (1873 km) is the logistics spine for FB deliveries to Ouricuri — a factor entering FOB pricing and the commissioning lead-time curve. Ouricuri can operate with consigned PM kits (seal + bearing + gaskets) — an approach that reduces interruption during point shutdowns and simplifies industrial inventory management. BR-101, BR-232 and BR-116 broaden FB's transport flexibility to Ouricuri — useful in tight-window PM campaigns or for cargo whose gauge requires routes with specific bridges/curves. 72h to 7 days, depending on modal and dry season: this is the typical delivery interval Cabreúva-SP → Ouricuri, based on a consolidated road route and FB-qualified logistics operators. The service structure for Ouricuri is sized as technical visits planned as a mission — concentrated agenda to cover multiple plants in a single trip, with escalation to additional visits in cases of commissioning, troubleshooting or complex retrofit.
For projects with FBCN pumps in Ouricuri, talk to FB application engineering: viscosity analysis, available NPSH, seal materials and operating regime — technical response within 24-48 business hours.
Talk to engineeringFor over 82 years, we have manufactured industrial pumps in Cabreúva-SP. From north to south, we serve the country's main industrial hubs with gear (FBE/FBEI) and centrifugal (FBCN/FBOT) pumps — engineered, machined and assembled in our own manufacturing facility.
Our engineering team sizes each pump for the customer's actual application, with bench testing before shipping. This technical rigor — combined with direct support from our team — is what has sustained the trust of groups like Petrobras, Vale and CSN for generations.

What changes when the pump comes straight from the manufacturer: engineering, stock and logistics under one roof in Cabreúva-SP.
Technical support across all 27 Brazilian states, from inland regions to major industrial capitals.
Nationwide deliveries through partner carrier network with optimized lead times.
Technical team available for sizing, project work and after-sales support across any region.
Original spare parts for the FBE, FBEI, FBCN and FBOT series stocked at our own factory, ready to ship.
Own factory in Cabreúva/SP with full production capability, serving Ouricuri and all of Brazil

Engineering, CNC machining and assembly — all integrated in our Cabreúva/SP factory.

We size and build complete systems, ready for installation at your industrial plant.

We keep original parts in stock for all series, ensuring continuity of your operation.

Production line with centrifugal and gear pumps assembled and tested in our manufacturing plant.
FB Bombas serves Ouricuri and the entire Pernambuco region with gear pumps (internal & external) and centrifugal pumps for your industrial application. Request a quote and receive a personalized proposal.
Request QuoteFour catalog series, fire-fighting systems and engineered-to-order — in-house manufacturing and hydrostatic testing on 100% of pumps
Our technical team is ready to develop the ideal solution for your application
Contact Us
Our manufacturing plant in Cabreúva-SP integrates engineering, CNC machining and assembly under one roof. Every pump is validated through bench testing before reaching the customer — ensuring it ships ready for real application.
Present in the largest industrial projects in Brazil and Latin America









See specific solutions for Ouricuri
Brazilian sectors for which FB Bombas sizes equipment — complete technical guides per application.
Regional service from Ouricuri — same series, same factory in Cabreúva/SP.
FB Bombas has been manufacturing industrial pumps since 1944, with over 82 years of continuous experience. The factory in Cabreúva/SP operates with engineering, manufacturing and testing under one roof, ensuring total quality control on every unit supplied to Ouricuri and all of Brazil.
Yes. A complete technical Data Book accompanies each FB Bombas pump that reaches Ouricuri: hydraulic test certificate, material certificates (stainless steel, duplex and ductile cast iron per spec), ISO 21940 G2.5 balancing report, characteristic curve measured on the test bench, API 682 mechanical-seal data sheets, operation and maintenance manual and as-built drawings. The unit serial number traces all this documentation.
They do. The FBCN series dimensionally meets ASME B73.1, the North American standard for horizontal end-suction process centrifugal pumps. In practice, a Ouricuri plant running a normalized pump of the same designation achieves retrofit on the already-installed baseplate: since shaft dimensions, suction/discharge flanges, casing feet and impeller centerline follow the same standard, the FBCN pump takes the place of the previous one — piping and baseplate stay intact. Hydraulic equivalence (Q×H and NPSH) is checked separately, on the data sheet.
Contact can be made via WhatsApp at +55 11 97287-4837, email comercial@fbbombas.com.br or through the form on our website. Technical response is prioritized on the same business day, with direct reply from the application engineering team.
Yes, when the dimension designation matches. The FBCN series follows ASME B73.1 (North American dimensional standard for end-suction process pumps), which requires pumps of the same designation, from any source of supply, to be interchangeable as to mounting dimensions, suction and discharge nozzles, input shaft, baseplate and foundation bolt holes — in Ouricuri plants this applies to the installed normalized fleet. FB Bombas supplies the complete pump, not loose parts: baseplate, piping and foundation stay, and a new FBCN goes in. Before supply, application engineering checks the duty point (Q×H), available NPSH and flange class — a matching designation alone does not guarantee hydraulic equivalence.
Yes. FB Bombas manufactures pumps for stationary fire protection systems in compliance with NFPA (National Fire Protection Association) and ABNT NBR 16704 standards, serving building and industrial projects that require these certifications.
Shorter delivery times (no import dependency), direct technical support from FB engineering, replacement parts with in-house manufacturing, prices in local currency (no exchange rate exposure) and on-site service for projects in Ouricuri and surrounding areas. FB Bombas has been manufacturing in Brazil since 1944.
Yes. Since FB Bombas manufactures entirely in Cabreúva/SP, replacement parts for the FBE, FBEI, FBCN and FBOT series are available directly from the factory, with short lead times for scheduled stops and priority service for emergencies. This significantly reduces total cost of ownership.
Yes. As a Brazilian manufacturer accredited in FINAME — the BNDES Special Industrial Financing Agency —, FB Bombas qualifies equipment supplied to Ouricuri for BNDES Finame financing lines (Industrial Working Capital, Modernization, Capital Goods), with preferential conditions for national industry. On the technical proposal, the commercial team includes the product's FINAME code to enter the customer's financial plan.
Shipment is by road via BR-101 (via AL), with industrial packaging suited to the journey and tracking until delivery. Sizing, proposal and technical support run in parallel through remote channels — distance does not change the engineering scope, only the logistics planning, reflected in the proposal schedule.
Fill out the form and our technical team will contact you to size the ideal pump — gear (FBE/FBEI) or centrifugal (FBCN/FBOT).