Technical summary
FBCN centrifugal pumps (FB Bombas) in Novo Oriente de Minas, Minas Gerais: sized for local industry, flow up to 2,200 m³/h, ASME B73.1 compliance. Cabreúva-SP at 900 km, typical critical-parts lead time: 72-96h.


In Novo Oriente de Minas, óleos industriais and água industrial make up the fluid portfolio served by local plants — each with its own requirements on available NPSH, in-service viscosity and sealing strategy (Plan 11/13/52/53 by criticality). In Novo Oriente de Minas, Minas Gerais, FB Bombas serves local industry projects with the FBE, FBCN, FBOT and FBEI series — dedicated application engineering for sizing against the actual system curve, CRCC Petrobras certification and technical compliance with ASME B73.1 (centrifugal), API 676 (gear) and NFPA 20 / NBR 16704 (fire fighting). Road access runs via BR-381 Rodovia Fernão Dias, with branches through BR-381, BR-040, BR-262 and BR-116 — a corridor that sets delivery times for rotating equipment and the logistics of technical service. CRCC Petrobras registration valid in MG qualifies FB Bombas for direct supply to Novo Oriente de Minas in refining and petrochemical operations, with FBE (API 676) and FBCN (ASME B73.1) series and materials specified per NACE MR0175 for sour service with H2S. The pulp-and-paper cluster of Eunapolis is 209 km from Novo Oriente de Minas, generating economic spillover and correlated technical demand — common in pumping projects involving both cities. Membership in the Vale do Mucuri mesoregion (IBGE) places Novo Oriente de Minas in a regional economic mesh — a factor FB Bombas uses to optimize multi-city maintenance campaigns and consolidate freight across customers along the same axis. Based in Cabreúva-SP at 900 km via BR-381 Rodovia Fernão Dias, FB Bombas delivers to Novo Oriente de Minas industrial pumps manufactured in-house since 1944 plus continuous technical support.
In Novo Oriente de Minas, óleos industriais and água industrial make up the fluid portfolio served by local plants — each with its own requirements on available NPSH, in-service viscosity and sealing strategy (Plan 11/13/52/53 by criticality). In Novo Oriente de Minas, Minas Gerais, FB Bombas serves local industry projects with the FBE, FBCN, FBOT and FBEI series — dedicated application engineering for sizing against the actual system curve, CRCC Petrobras certification and technical compliance with ASME B73.1 (centrifugal), API 676 (gear) and NFPA 20 / NBR 16704 (fire fighting). Road access runs via BR-381 Rodovia Fernão Dias, with branches through BR-381, BR-040, BR-262 and BR-116 — a corridor that sets delivery times for rotating equipment and the logistics of technical service. CRCC Petrobras registration valid in MG qualifies FB Bombas for direct supply to Novo Oriente de Minas in refining and petrochemical operations, with FBE (API 676) and FBCN (ASME B73.1) series and materials specified per NACE MR0175 for sour service with H2S. The pulp-and-paper cluster of Eunapolis is 209 km from Novo Oriente de Minas, generating economic spillover and correlated technical demand — common in pumping projects involving both cities. Membership in the Vale do Mucuri mesoregion (IBGE) places Novo Oriente de Minas in a regional economic mesh — a factor FB Bombas uses to optimize multi-city maintenance campaigns and consolidate freight across customers along the same axis. Based in Cabreúva-SP at 900 km via BR-381 Rodovia Fernão Dias, FB Bombas delivers to Novo Oriente de Minas industrial pumps manufactured in-house since 1944 plus continuous technical support.

Years
Compliant
Tested
Direct answer for industrial projects — recommended series, standards compliance and logistics.
FBCN centrifugal pumps (FB Bombas) in Novo Oriente de Minas, Minas Gerais: sized for local industry, flow up to 2,200 m³/h, ASME B73.1 compliance. Cabreúva-SP at 900 km, typical critical-parts lead time: 72-96h.
In Novo Oriente de Minas, óleos industriais and água industrial make up the fluid portfolio served by local plants — each with its own requirements on available NPSH, in-service viscosity and sealing strategy (Plan 11/13/52/53 by criticality). In Novo Oriente de Minas, Minas Gerais, FB Bombas serves local industry projects with the FBE, FBCN, FBOT and FBEI series — dedicated application engineering for sizing against the actual system curve, CRCC Petrobras certification and technical compliance with ASME B73.1 (centrifugal), API 676 (gear) and NFPA 20 / NBR 16704 (fire fighting). Road access runs via BR-381 Rodovia Fernão Dias, with branches through BR-381, BR-040, BR-262 and BR-116 — a corridor that sets delivery times for rotating equipment and the logistics of technical service. CRCC Petrobras registration valid in MG qualifies FB Bombas for direct supply to Novo Oriente de Minas in refining and petrochemical operations, with FBE (API 676) and FBCN (ASME B73.1) series and materials specified per NACE MR0175 for sour service with H2S. The pulp-and-paper cluster of Eunapolis is 209 km from Novo Oriente de Minas, generating economic spillover and correlated technical demand — common in pumping projects involving both cities. Membership in the Vale do Mucuri mesoregion (IBGE) places Novo Oriente de Minas in a regional economic mesh — a factor FB Bombas uses to optimize multi-city maintenance campaigns and consolidate freight across customers along the same axis. Based in Cabreúva-SP at 900 km via BR-381 Rodovia Fernão Dias, FB Bombas delivers to Novo Oriente de Minas industrial pumps manufactured in-house since 1944 plus continuous technical support.
Novo Oriente de Minas is served with a logistics lead time of 72-96h for critical parts from Cabreúva-SP, subject to case-by-case optimization. Novo Oriente de Minas: óleos industriais and água industrial suggest materials such as austenitic stainless steels (AISI 304/316) with attention to thermal expansion — a choice impacting both durability and cost of the pump-and-motor set. In Novo Oriente de Minas, FBEI and FBCN cover the technical range observed in the field — from primary transfer and circulation to replacing an installed pump carrying the same ASME B73.1 dimensional designation. FBCN sizing for the Novo Oriente de Minas circuit checks three points on the curve: the operating point (near BEP), available NPSH with margin over required — critical with hot fluid or suction lift — and end-of-curve power, which protects the motor against overload in off-design operation.
Novo Oriente de Minas shows a medium density — regular and predictable opportunity pipeline pattern, a structural factor that modulates predictability of recurring revenue and the viable contract type (spot, annual, multi-year). papel-celulose cluster near Novo Oriente de Minas imposes a annual maintenance shutdowns concentrate demand into predictable windows pace — syncing equipment purchases, PM contracting and regional technical-team mobilization. A GDP of R$ 151 million (IBGE, 2023) with a services profile (31.4% of value added in 2021) places Novo Oriente de Minas's local demand in the utilities field: building pressurization, light process water and fire-fighting systems. The papel-celulose cluster near Novo Oriente de Minas brings applications such as white/black liquor circulation, recovery-boiler feed and low-to-medium consistency stock pumping — a repertoire FB Bombas serves with dedicated series and field-validated materials. Typical use cases identified for Novo Oriente de Minas: series FBEI for transferência geral and series FBCN for utilidades. Typical fluids handled in Novo Oriente de Minas (óleos industriais and água industrial) require careful selection of seal and coating materials — a central variable in pump sizing.
900 km separate the Cabreúva-SP factory from Novo Oriente de Minas via BR-381 Rodovia Fernão Dias — an axis sized for movement of pumps, skids and pump-and-motor sets. Logistics lead time to Novo Oriente de Minas is 48-72h, with possible technical stop — variable with cargo type, season and specific optimizations. The technical-service model in Novo Oriente de Minas is structured as technical visits scheduled in advance, optimizing the specialized team's travel.
Technical inquiry for the FBCN series in Novo Oriente de Minas: real-curve sizing, material recommendation and sealing configuration. Direct service from the FB team.
Talk to engineeringFor over 82 years, we have manufactured industrial pumps in Cabreúva-SP. From north to south, we serve the country's main industrial hubs with gear (FBE/FBEI) and centrifugal (FBCN/FBOT) pumps — engineered, machined and assembled in our own manufacturing facility.
Our engineering team sizes each pump for the customer's actual application, with bench testing before shipping. This technical rigor — combined with direct support from our team — is what has sustained the trust of groups like Petrobras, Vale and CSN for generations.

What changes when the pump comes straight from the manufacturer: engineering, stock and logistics under one roof in Cabreúva-SP.
Technical support across all 27 Brazilian states, from inland regions to major industrial capitals.
Nationwide deliveries through partner carrier network with optimized lead times.
Technical team available for sizing, project work and after-sales support across any region.
Original spare parts for the FBE, FBEI, FBCN and FBOT series stocked at our own factory, ready to ship.
Own factory in Cabreúva/SP with full production capability, serving Novo Oriente de Minas and all of Brazil

Engineering, CNC machining and assembly — all integrated in our Cabreúva/SP factory.

We size and build complete systems, ready for installation at your industrial plant.

We keep original parts in stock for all series, ensuring continuity of your operation.

Production line with centrifugal and gear pumps assembled and tested in our manufacturing plant.
FB Bombas serves Novo Oriente de Minas and the entire Minas Gerais region with gear pumps (internal & external) and centrifugal pumps for your industrial application. Request a quote and receive a personalized proposal.
Request QuoteFour catalog series, fire-fighting systems and engineered-to-order — in-house manufacturing and hydrostatic testing on 100% of pumps
Our technical team is ready to develop the ideal solution for your application
Contact Us
Our manufacturing plant in Cabreúva-SP integrates engineering, CNC machining and assembly under one roof. Every pump is validated through bench testing before reaching the customer — ensuring it ships ready for real application.
Present in the largest industrial projects in Brazil and Latin America









See specific solutions for Novo Oriente de Minas
Brazilian sectors for which FB Bombas sizes equipment — complete technical guides per application.
Regional service from Novo Oriente de Minas — same series, same factory in Cabreúva/SP.
In Novo Oriente de Minas, service comes directly from the factory in Cabreúva/SP, through the FB Bombas team. The customer speaks with application engineering for sizing, receives the complete technical quotation within 3-5 business days and buys original parts at factory pricing. When project criticality warrants it, on-site technical visits to Novo Oriente de Minas are scheduled.
Yes. With a factory in Cabreúva/SP and a technical team dedicated to projects in Novo Oriente de Minas, FB Bombas has manufactured industrial pumps in Brazil since 1944. Applications currently running on imported equipment are covered by the FBCN (centrifugal), FBE/FBEI (gear) and FBOT (thermal oil) series — adding advantages in lead time (no import), factory-direct technical support, spare parts for FB pumps and application engineering that works in Portuguese. In a normalized-line retrofit, the interchangeability set out in ASME B73.1 holds between units of the same standard dimension designation, whatever the original supplier.
Yes, provided the dimension designation coincides. By following ASME B73.1 — the North American dimensional standard for end-suction process pumps — the FBCN occupies the standardised installation envelope defined by the norm, which does not depend on who built the pump running in Novo Oriente de Minas plants. What is supplied is the complete pump: baseplate, suction/discharge piping and foundations usually remain. FB application engineering runs the dimensional gap analysis before supply, covering flow, head and required NPSH as well.
Just use one of the channels: WhatsApp +55 11 97287-4837, email comercial@fbbombas.com.br or the website form. Describe the application — fluid, flow, pressure, temperature — and the technical team replies with a proposal sized for your conditions in Novo Oriente de Minas.
Credentials include an active Petrobras CRCC, API 676 compliance on the FBE gear line, ASME B73.1 compliance on the FBCN centrifugal and adherence to NFPA 20 and NBR 16704 on fire-fighting systems. Technical documentation and data book accompany supplies upon requirement.
Yes. On the factory bench in Cabreúva/SP the FAT (Factory Acceptance Test) is carried out: hydraulic test with characteristic-curve measurement (Q × H), hydraulic efficiency, NPSHr and ISO 10816 vibration — witnessed by customer inspection when specified. The SAT (Site Acceptance Test) on Novo Oriente de Minas projects counts on application engineering during commissioning, including startup checklist, laser alignment and recording of the baseline vibration signature.
Three fluid fronts are covered by the FB series. FBE: mineral and synthetic oils, asphalt (CAP), BPF fuel oils, petroleum derivatives, molasses, resins, viscous chemical and hydraulic products. FBCN: raw and treated water, process fluids and industrial effluents. FBOT: thermal oil at elevated temperatures. Fluid viscosity, temperature and chemical compatibility guide the sizing of every application.
Yes. FB Bombas offers retrofit of existing installations, including seal upgrades, replacement of worn components, adaptation for new fluids and hydraulic performance improvement. The assessment is based on a technical report of the current installation.
Yes. Every FB Bombas pump delivered to Novo Oriente de Minas comes with a complete technical Data Book: hydraulic test certificate, material certificates (stainless, duplex, ductile cast iron per spec), ISO 21940 G2.5 balancing report, characteristic curve measured on the bench, API 682 mechanical-seal data sheets, operation and maintenance manual, and as-built drawings. All documentation is traceable by the unit serial number.
They do. In the FBE and FBCN lines, wear-affected components sit in easily accessible positions, so conventional tools suffice for disassembly and inspection. Add detailed technical manuals and factory-direct availability of replacement parts — and maintenance becomes an uncomplicated routine.
Fill out the form and our technical team will contact you to size the ideal pump — gear (FBE/FBEI) or centrifugal (FBCN/FBOT).