Technical summary
The FBCN (normalized centrifugal) line is specified in Peri Mirim, Maranhão for local industry — head up to 138 m, temperature up to 260°C. API 610, in-house manufacturing in Cabreúva-SP (2318 km).


Road access runs via BR-135 (via Belém-Brasília BR-153), with branches through BR-135, BR-222 and BR-316 — a corridor that sets delivery times for rotating equipment and the logistics of technical service. FB Bombas maintains an installed base in Peri Mirim with a structure of spare parts (impeller, shaft, wear ring, cartridge mechanical seal, bearings) and scheduled preventive maintenance — direct supply from the Cabreúva-SP factory, no intermediaries. The fluid roster in Peri Mirim (óleos industriais and água industrial) demands attention to viscosity, operating temperature and chemical compatibility — variables that FB application engineering uses to recommend the proper series. The mining cluster of Barcarena is 435 km from Peri Mirim, generating economic spillover and correlated technical demand — common in pumping projects involving both cities. In Peri Mirim, Maranhão, FB Bombas serves local industry projects with the FBE, FBCN, FBOT and FBEI series — dedicated application engineering for sizing against the actual system curve, CRCC Petrobras certification and technical compliance with API 610 (centrifugal), API 676 (gear) and NFPA 20 / NBR 16704 (fire fighting). FB Bombas maintains in Peri Mirim the technical portfolio of CRCC Petrobras + API 610 + API 676 + ASME B73.1 — a regulatory base that spans refining, petrochemicals, mining, sanitation, food, pulp and paper, sugar-ethanol and steel. Service to Peri Mirim is coordinated from the Cabreúva-SP factory, route BR-135 (via Belém-Brasília BR-153) (2318 km), with a technical team for selection, commissioning and replacement support.
Road access runs via BR-135 (via Belém-Brasília BR-153), with branches through BR-135, BR-222 and BR-316 — a corridor that sets delivery times for rotating equipment and the logistics of technical service. FB Bombas maintains an installed base in Peri Mirim with a structure of spare parts (impeller, shaft, wear ring, cartridge mechanical seal, bearings) and scheduled preventive maintenance — direct supply from the Cabreúva-SP factory, no intermediaries. The fluid roster in Peri Mirim (óleos industriais and água industrial) demands attention to viscosity, operating temperature and chemical compatibility — variables that FB application engineering uses to recommend the proper series. The mining cluster of Barcarena is 435 km from Peri Mirim, generating economic spillover and correlated technical demand — common in pumping projects involving both cities. In Peri Mirim, Maranhão, FB Bombas serves local industry projects with the FBE, FBCN, FBOT and FBEI series — dedicated application engineering for sizing against the actual system curve, CRCC Petrobras certification and technical compliance with API 610 (centrifugal), API 676 (gear) and NFPA 20 / NBR 16704 (fire fighting). FB Bombas maintains in Peri Mirim the technical portfolio of CRCC Petrobras + API 610 + API 676 + ASME B73.1 — a regulatory base that spans refining, petrochemicals, mining, sanitation, food, pulp and paper, sugar-ethanol and steel. Service to Peri Mirim is coordinated from the Cabreúva-SP factory, route BR-135 (via Belém-Brasília BR-153) (2318 km), with a technical team for selection, commissioning and replacement support.

Years
Certified
Warranty
Direct answer for industrial projects — recommended series, standards compliance and logistics.
The FBCN (normalized centrifugal) line is specified in Peri Mirim, Maranhão for local industry — head up to 138 m, temperature up to 260°C. API 610, in-house manufacturing in Cabreúva-SP (2318 km).
Road access runs via BR-135 (via Belém-Brasília BR-153), with branches through BR-135, BR-222 and BR-316 — a corridor that sets delivery times for rotating equipment and the logistics of technical service. FB Bombas maintains an installed base in Peri Mirim with a structure of spare parts (impeller, shaft, wear ring, cartridge mechanical seal, bearings) and scheduled preventive maintenance — direct supply from the Cabreúva-SP factory, no intermediaries. The fluid roster in Peri Mirim (óleos industriais and água industrial) demands attention to viscosity, operating temperature and chemical compatibility — variables that FB application engineering uses to recommend the proper series. The mining cluster of Barcarena is 435 km from Peri Mirim, generating economic spillover and correlated technical demand — common in pumping projects involving both cities. In Peri Mirim, Maranhão, FB Bombas serves local industry projects with the FBE, FBCN, FBOT and FBEI series — dedicated application engineering for sizing against the actual system curve, CRCC Petrobras certification and technical compliance with API 610 (centrifugal), API 676 (gear) and NFPA 20 / NBR 16704 (fire fighting). FB Bombas maintains in Peri Mirim the technical portfolio of CRCC Petrobras + API 610 + API 676 + ASME B73.1 — a regulatory base that spans refining, petrochemicals, mining, sanitation, food, pulp and paper, sugar-ethanol and steel. Service to Peri Mirim is coordinated from the Cabreúva-SP factory, route BR-135 (via Belém-Brasília BR-153) (2318 km), with a technical team for selection, commissioning and replacement support.
Peri Mirim: transferência geral and utilidades. This application mix is covered by the recommended FB series, with case-by-case fine tuning. For óleos industriais and água industrial in Peri Mirim, the baseline is AISI 316 or for chloride resistance in marine atmosphere — FB engineering tunes from immersion tests, field history and iron/stainless/duplex compatibility within the local fluid classes. Peri Mirim typically calls for FBEI and FBCN — an initial recommendation based on local productFit, dominant industrial cluster and identified fluid profile; final technical approval is refined by application engineering. Technical-and-commercial support for Peri Mirim is covered from Cabreúva-SP, with typical lead time for critical parts of 96h to 7 days via dedicated carrier.
The demand profile in Peri Mirim reflects low industrial density — typically standalone projects, without regional cumulative volume. Typical seasonality of the mineracao cluster (24/7 operation with annual scheduled outages — concentrated PM windows and continuous demand for critical parts) directly impacts supply scheduling and PMs in Peri Mirim. Fluid-roster complexity in Peri Mirim is low — lean fluid roster — technical operation focused on few main vectors. For Peri Mirim, series FBEI for transferência geral and series FBCN for utilidades — initial reference for technical discussion with application engineering. process-water booster, slurry pumping, pit dewatering and tailings dam services: this is the typical application set around the mineracao cluster in which Peri Mirim sits. Peri Mirim: óleos industriais and água industrial. Each fluid defines a distinct set of pump requirements — flow, available NPSH, sealing strategy.
The main logistics axis between Cabreúva-SP and Peri Mirim is BR-135 (via Belém-Brasília BR-153), totaling 2318 km — a route that sets the default delivery time for finished equipment. Beyond the main route, Peri Mirim is accessible via BR-135, BR-222 and BR-316 — options that provide redundancy in case of blockages or restricted operating windows. Technical-service coverage for Peri Mirim involves technical visits planned as a mission — concentrated agenda to cover multiple plants in a single trip.
FB engineers serve Peri Mirim for the FBCN series with a sized proposal — duty point, fluid, field conditions and supply lead time.
Talk to engineeringFor over 82 years, we have manufactured industrial pumps in Cabreúva-SP. From north to south, we serve the country's main industrial hubs with gear (FBE/FBEI) and centrifugal (FBCN/FBOT) pumps — engineered, machined and assembled in our own manufacturing facility.
Our engineering team sizes each pump for the customer's actual application, with bench testing before shipping. This technical rigor — combined with direct support from our team — is what has sustained the trust of groups like Petrobras, Vale and CSN for generations.

Four differentiators that make FB Bombas the choice of leading Brazilian industries.
Technical support across all 27 Brazilian states, from inland regions to major industrial capitals.
Nationwide deliveries through partner carrier network with optimized lead times.
Technical team available for sizing, project work and after-sales support across any region.
Original parts in stock for all series, ensuring operational continuity with zero downtime.
Own factory in Cabreúva/SP with full production capability, serving Peri Mirim and all of Brazil

Engineering, CNC machining and assembly — all integrated in our Cabreúva/SP factory.

We size and build complete systems, ready for installation at your industrial plant.

We keep original parts in stock for all series, ensuring continuity of your operation.

Production line with centrifugal and gear pumps assembled and tested in our manufacturing plant.
FB Bombas serves Peri Mirim and the entire Maranhão region with gear pumps (internal & external) and centrifugal pumps for your industrial application. Request a quote and receive a personalized proposal.
Request QuoteSoluções completas em bombeamento industrial com tecnologia de ponta
Our technical team is ready to develop the ideal solution for your application
Fale Conosco
Our manufacturing plant in Cabreúva-SP integrates engineering, CNC machining and assembly under one roof. Every pump is validated through bench testing before reaching the customer — ensuring it ships ready for real application.
Present in the largest industrial projects in Brazil and Latin America
See specific solutions for Peri Mirim
Brazilian sectors for which FB Bombas sizes equipment — complete technical guides per application.
Regional service from Peri Mirim — same series, same factory in Cabreúva/SP.
Yes. FB Bombas is a Brazilian manufacturer accredited in FINAME (BNDES Special Industrial Financing Agency), which qualifies equipment supplied to Peri Mirim for BNDES Finame financing lines (Industrial Working Capital, Modernization, Capital Goods) with preferential conditions for national industry. The commercial team provides the product FINAME code on the technical proposal for inclusion in the customer financial plan.
Yes. The FAT (Factory Acceptance Test) is executed on the factory bench in Cabreúva/SP, with hydraulic test, characteristic-curve measurement (Q × H), hydraulic efficiency, NPSHr and ISO 10816 vibration — witnessed by customer inspection when specified. For projects in Peri Mirim, the SAT (Site Acceptance Test) is supported by application engineering during commissioning, with startup checklist, laser alignment and baseline vibration-signature capture.
Maximum temperature depends on the series: FBE and FBEI operate up to 350°C with heating jacket and special sealing; FBOT operates up to 350°C in thermal oil circuits; FBCN operates up to 250°C with proper materials and sealing. Correct sizing of sealing and materials is essential for safe operation.
Sizing is performed by FB Bombas’ application engineering team based on four key variables: desired flow, differential pressure, working temperature and fluid viscosity. Additional data such as available NPSH, operating cycle and fluid chemical compatibility are also considered. The service is free of charge for customers in Peri Mirim.
Yes. Correct sizing is the main lever for energy efficiency — an oversized or undersized pump wastes energy. FB Bombas engineering calculates the optimal operating point considering the actual process conditions in Peri Mirim, optimizing the flow/pressure/power ratio.
Service to Peri Mirim is handled directly by the FB Bombas team at the Cabreúva/SP factory — no intermediaries, no resellers. That means direct contact with application engineering for sizing, technical quotes returned within 24h and original spare parts supplied without distributor markup. On-site technical visits to Peri Mirim are planned based on project criticality.
Yes. FB Bombas serves Peri Mirim and the entire surrounding region with supply, technical support and replacement parts directly from the factory in Cabreúva/SP. Support includes sizing at no cost and, for critical projects, on-site technical visits.
Yes. FB Bombas application engineering supports ISO 10816 vibration analysis (velocity RMS in mm/s) for diagnosing misalignment, imbalance, bearing defects and cavitation on pumps installed in Peri Mirim. The service includes baseline capture at startup, spectral comparison during PM campaigns, and intervention recommendations (re-balancing, bearing replacement, laser alignment) before vibration exceeds the standard’s zone D.
Yes. The FBE and FBCN lines were designed with easy access to wear-prone components, allowing disassembly and inspection with conventional tools. Detailed technical manuals and direct factory replacement parts availability simplify maintenance routines.
Yes. FB Bombas’ application engineering analyzes the installed pump specifications (flow, pressure, viscosity, temperature) and proposes dimensional or functional technical equivalence with one of our series. Many clients in Peri Mirim have already made this replacement with gains in lead time, cost and local support.
Fill out the form and our technical team will contact you to size the ideal pump — gear (FBE/FBEI) or centrifugal (FBCN/FBOT).