Technical summary
FBCN centrifugal pumps (FB Bombas) in Novo Lino, Alagoas: sized for local industry, flow up to 2,200 m³/h, API 610 and ASME B73.1 compliance. Cabreúva-SP at 2011 km, typical critical-parts lead time: 96h to 7 days.


FB Bombas pumps installed in Novo Lino, Alagoas meet CRCC Petrobras certification, API 610 (centrifugal) and API 676 (gear) compliance — credentials FB has sustained as a Brazilian manufacturer since 1944. Road access runs via BR-101 (via SE/BA), with branches through BR-101, BR-104 and BR-316 — a corridor that sets delivery times for rotating equipment and the logistics of technical service. Brazilian industrial-pump manufacturer since 1944, FB Bombas supplies Novo Lino, Alagoas with the FBE, FBCN, FBOT, FBEI series and FBFS fire-fighting systems — designed and produced in Cabreúva-SP with API 610 / API 676 compliance, ASME B73.1 normalization (interchangeable with global manufacturers) and a traceable Data Book on every unit shipped. In Novo Lino, óleos industriais and água industrial make up the fluid portfolio served by local plants — each with its own requirements on available NPSH, in-service viscosity and sealing strategy (Plan 11/13/52/53 by criticality). Novo Lino sits 80 km from the sugar-and-ethanol cluster centered in Maceio, a proximity that usually means shared suppliers and aligned maintenance standards. The IBGE classification places Novo Lino in the Leste Alagoano mesoregion — an area whose industrial profile directly influences demand for rotating equipment. Based in Cabreúva-SP at 2011 km via BR-101 (via SE/BA), FB Bombas delivers to Novo Lino industrial pumps manufactured in-house since 1944 plus continuous technical support.
FB Bombas pumps installed in Novo Lino, Alagoas meet CRCC Petrobras certification, API 610 (centrifugal) and API 676 (gear) compliance — credentials FB has sustained as a Brazilian manufacturer since 1944. Road access runs via BR-101 (via SE/BA), with branches through BR-101, BR-104 and BR-316 — a corridor that sets delivery times for rotating equipment and the logistics of technical service. Brazilian industrial-pump manufacturer since 1944, FB Bombas supplies Novo Lino, Alagoas with the FBE, FBCN, FBOT, FBEI series and FBFS fire-fighting systems — designed and produced in Cabreúva-SP with API 610 / API 676 compliance, ASME B73.1 normalization (interchangeable with global manufacturers) and a traceable Data Book on every unit shipped. In Novo Lino, óleos industriais and água industrial make up the fluid portfolio served by local plants — each with its own requirements on available NPSH, in-service viscosity and sealing strategy (Plan 11/13/52/53 by criticality). Novo Lino sits 80 km from the sugar-and-ethanol cluster centered in Maceio, a proximity that usually means shared suppliers and aligned maintenance standards. The IBGE classification places Novo Lino in the Leste Alagoano mesoregion — an area whose industrial profile directly influences demand for rotating equipment. Based in Cabreúva-SP at 2011 km via BR-101 (via SE/BA), FB Bombas delivers to Novo Lino industrial pumps manufactured in-house since 1944 plus continuous technical support.

Years
Certified
Warranty
Direct answer for industrial projects — recommended series, standards compliance and logistics.
FBCN centrifugal pumps (FB Bombas) in Novo Lino, Alagoas: sized for local industry, flow up to 2,200 m³/h, API 610 and ASME B73.1 compliance. Cabreúva-SP at 2011 km, typical critical-parts lead time: 96h to 7 days.
FB Bombas pumps installed in Novo Lino, Alagoas meet CRCC Petrobras certification, API 610 (centrifugal) and API 676 (gear) compliance — credentials FB has sustained as a Brazilian manufacturer since 1944. Road access runs via BR-101 (via SE/BA), with branches through BR-101, BR-104 and BR-316 — a corridor that sets delivery times for rotating equipment and the logistics of technical service. Brazilian industrial-pump manufacturer since 1944, FB Bombas supplies Novo Lino, Alagoas with the FBE, FBCN, FBOT, FBEI series and FBFS fire-fighting systems — designed and produced in Cabreúva-SP with API 610 / API 676 compliance, ASME B73.1 normalization (interchangeable with global manufacturers) and a traceable Data Book on every unit shipped. In Novo Lino, óleos industriais and água industrial make up the fluid portfolio served by local plants — each with its own requirements on available NPSH, in-service viscosity and sealing strategy (Plan 11/13/52/53 by criticality). Novo Lino sits 80 km from the sugar-and-ethanol cluster centered in Maceio, a proximity that usually means shared suppliers and aligned maintenance standards. The IBGE classification places Novo Lino in the Leste Alagoano mesoregion — an area whose industrial profile directly influences demand for rotating equipment. Based in Cabreúva-SP at 2011 km via BR-101 (via SE/BA), FB Bombas delivers to Novo Lino industrial pumps manufactured in-house since 1944 plus continuous technical support.
In Novo Lino, transferência geral and utilidades form the typical-use portfolio — guiding series selection, sealing configuration and internal coating according to fluid abrasiveness or aggressiveness. Material selection for óleos industriais and água industrial in Novo Lino considers AISI 316 or for chloride resistance in marine atmosphere — a specification FB Bombas details on a matweb sheet after fluid chemical analysis. Technical fit in Novo Lino points to FBEI and FBCN as the series suitable for typical local operations — a baseline recommendation; the final specification depends on the specific process parameters. For Novo Lino (2011 km from Cabreúva-SP), the critical-parts logistics cycle runs in 96h to 7 days — a workable window for regular PM campaigns with controlled risk of extended downtime.
In Novo Lino, low industrial density — typically standalone projects, without regional cumulative volume — a characteristic that sizes FB's commercial strategy: application-engineering coverage, visit cadence and depth of consignment stock. In Novo Lino, sucroalcooleiro-cluster seasonality manifests as concentrated harvest season (Apr-Nov) creates short maintenance windows and intense parts demand during milling — information FB Bombas uses to schedule plant capacity and ready-to-ship inventory. In Novo Lino, the low complexity index in the fluid mix sets lean fluid roster — technical operation focused on few main vectors — a factor adjusting both technical-spec depth and materials-catalogue scope. For Novo Lino, series FBEI for transferência geral and series FBCN for utilidades — initial reference for technical discussion with application engineering. juice circulation, molasses transfer, vinasse boost and thermal oil for evaporators: this is the typical application set around the sucroalcooleiro cluster in which Novo Lino sits. Novo Lino: óleos industriais and água industrial. Each fluid defines a distinct set of pump requirements — flow, available NPSH, sealing strategy.
2011 km separate the Cabreúva-SP factory from Novo Lino via BR-101 (via SE/BA) — an axis sized for movement of pumps, skids and pump-and-motor sets. Alternative routing to Novo Lino can use BR-101, BR-104 and BR-316, which helps in heavy-traffic situations or maintenance on specific roads. The technical-service model in Novo Lino is structured as technical visits planned as a mission — concentrated agenda to cover multiple plants in a single trip.
Technical inquiry for the FBCN series in Novo Lino: real-curve sizing, material recommendation and sealing configuration. Direct service from the FB team.
Talk to engineeringFor over 82 years, we have manufactured industrial pumps in Cabreúva-SP. From north to south, we serve the country's main industrial hubs with gear (FBE/FBEI) and centrifugal (FBCN/FBOT) pumps — engineered, machined and assembled in our own manufacturing facility.
Our engineering team sizes each pump for the customer's actual application, with bench testing before shipping. This technical rigor — combined with direct support from our team — is what has sustained the trust of groups like Petrobras, Vale and CSN for generations.

Four differentiators that make FB Bombas the choice of leading Brazilian industries.
Technical support across all 27 Brazilian states, from inland regions to major industrial capitals.
Nationwide deliveries through partner carrier network with optimized lead times.
Technical team available for sizing, project work and after-sales support across any region.
Original parts in stock for all series, ensuring operational continuity with zero downtime.
Own factory in Cabreúva/SP with full production capability, serving Novo Lino and all of Brazil

Engineering, CNC machining and assembly — all integrated in our Cabreúva/SP factory.

We size and build complete systems, ready for installation at your industrial plant.

We keep original parts in stock for all series, ensuring continuity of your operation.

Production line with centrifugal and gear pumps assembled and tested in our manufacturing plant.
FB Bombas serves Novo Lino and the entire Alagoas region with gear pumps (internal & external) and centrifugal pumps for your industrial application. Request a quote and receive a personalized proposal.
Request QuoteSoluções completas em bombeamento industrial com tecnologia de ponta
Our technical team is ready to develop the ideal solution for your application
Fale Conosco
Our manufacturing plant in Cabreúva-SP integrates engineering, CNC machining and assembly under one roof. Every pump is validated through bench testing before reaching the customer — ensuring it ships ready for real application.
Present in the largest industrial projects in Brazil and Latin America
See specific solutions for Novo Lino
Brazilian sectors for which FB Bombas sizes equipment — complete technical guides per application.
Regional service from Novo Lino — same series, same factory in Cabreúva/SP.
Shorter delivery times (no import dependency), direct technical support from FB engineering, replacement parts with in-house manufacturing, prices in local currency (no exchange rate exposure) and on-site service for projects in Novo Lino and surrounding areas. FB Bombas has been manufacturing in Brazil since 1944.
Yes. FB Bombas application engineering supports ISO 10816 vibration analysis (velocity RMS in mm/s) for diagnosing misalignment, imbalance, bearing defects and cavitation on pumps installed in Novo Lino. The service includes baseline capture at startup, spectral comparison during PM campaigns, and intervention recommendations (re-balancing, bearing replacement, laser alignment) before vibration exceeds the standard’s zone D.
Yes. FB Bombas serves the entire metropolitan region and microregions neighboring Novo Lino with the same technical support and logistics structure. This regional reach allows serving industrial plants distributed across multiple cities in a coordinated way.
To receive a technical quote for industrial pumps in Novo Lino, send via website form, WhatsApp +55 11 97287-4837 or email comercial@fbbombas.com.br the application data: fluid (name + viscosity at operating temperature), target flow (m³/h), discharge head (m), available NPSH, operating temperature and regime (continuous or intermittent). Application engineering responds with a preliminary technical proposal, characteristic curve, suggested materials and delivery lead time.
The FB Bombas rotating set is balanced per ISO 21940 G2.5 (a balancing grade equivalent to API 610 requirements for heavy-duty service) — required for critical projects in Novo Lino with continuous regime, plants with online vibration monitoring or applications with high cost of unplanned downtime. For machines running above 3,600 RPM or with rotating mass over 50 kg, balancing is performed on two planes with a piezoelectric sensor.
Yes. The FBCN series follows ASME B73.1 normalization (North American dimensional standard for end-suction process pumps) — which makes the pump-and-motor set interchangeable with global manufacturers (KSB, Sulzer, Goulds, Flowserve) already installed in plants in Novo Lino. For retrofits, the existing baseplate, suction/discharge piping and foundations are usually preserved; what changes is the rotating set. FB application engineering performs the dimensional gap analysis prior to supply.
Lead time depends on the chosen series, construction materials and stock availability. For standard configuration pumps, lead times are shorter; for special or custom constructions, the schedule is informed in the technical proposal. Logistics for Novo Lino is handled by our regular road operator.
Yes. In addition to the standard portfolio, FB Bombas develops custom solutions for special applications, including modifications in construction materials, sealing arrangements, integrated heating systems, skids, mobile assemblies and retrofit of existing installations. Special projects go through engineering before manufacturing.
For critical parts (mechanical seal, impeller, shaft, wear ring, bearings) during a plant shutdown in Novo Lino, FB Bombas runs an emergency flow: pre-invoicing, priority dispatch and alternative modal (express road or air transport depending on distance and criticality). Typical lead time varies by region, with a window negotiable case by case. For customers with an installed base and scheduled PM, part of the stock can be kept on consignment at the plant.
Yes. FB Bombas offers retrofit of existing installations, including seal upgrades, replacement of worn components, adaptation for new fluids and hydraulic performance improvement. The assessment is based on a technical report of the current installation.
Fill out the form and our technical team will contact you to size the ideal pump — gear (FBE/FBEI) or centrifugal (FBCN/FBOT).