Technical summary
The FBEI gear-pump line is specified in Nova Olinda do Norte, Amazonas for local industry — flow and pressure set by the actual system curve. Cabreúva-SP factory (2512 km), API 676 and direct technical service from FB engineering.


The óleos industriais and água industrial profile observed in Nova Olinda do Norte maps to a precise set of FB series: high viscosity → FBE/FBEI; water and low viscosity → FBCN; heat transfer → FBOT; fire protection → FBFS. Under the IBGE Centro Amazonense mesoregion grouping, Nova Olinda do Norte shares per-capita GDP, workforce profile and environmental-licensing patterns with adjacent cities — macroeconomic variables that reinforce predictability of local B2B demand. For pumping projects in Nova Olinda do Norte, FB Bombas provides dedicated application engineering — pre-sizing against the actual system curve, material selection (AISI 316) and on-site commissioning support. Through 135-km proximity to the free-trade zone cluster of Manaus, Nova Olinda do Norte inherits technical-qualification standards (CRCC, sector audits and customer-side homologation standards) and approved suppliers — a favorable context for normalized FB solutions. Road access runs via BR-174 (via RR) / acesso fluvial, with branches through BR-174, BR-319 and BR-230 — a corridor that sets delivery times for rotating equipment and the logistics of technical service. FB Bombas pumps installed in Nova Olinda do Norte, Amazonas meet CRCC Petrobras certification, ASME B73.1 (centrifugal) and API 676 (gear) compliance — credentials FB has sustained as a Brazilian manufacturer since 1944. In Nova Olinda do Norte, Amazonas, FB Bombas serves local industry projects with the FBE, FBCN, FBOT and FBEI series — dedicated application engineering for sizing against the actual system curve, CRCC Petrobras certification and technical compliance with ASME B73.1 (centrifugal), API 676 (gear) and NFPA 20 / NBR 16704 (fire fighting). Cabreúva-SP → Nova Olinda do Norte (2512 km via BR-174 (via RR) / acesso fluvial): origin of FB manufacturing since 1944, with vertical integration on a single site — CNC machining, assembly hydraulic bench and ISO 21940 G2.5 balancing — every unit ships with a traceable Data Book.
The óleos industriais and água industrial profile observed in Nova Olinda do Norte maps to a precise set of FB series: high viscosity → FBE/FBEI; water and low viscosity → FBCN; heat transfer → FBOT; fire protection → FBFS. Under the IBGE Centro Amazonense mesoregion grouping, Nova Olinda do Norte shares per-capita GDP, workforce profile and environmental-licensing patterns with adjacent cities — macroeconomic variables that reinforce predictability of local B2B demand. For pumping projects in Nova Olinda do Norte, FB Bombas provides dedicated application engineering — pre-sizing against the actual system curve, material selection (AISI 316) and on-site commissioning support. Through 135-km proximity to the free-trade zone cluster of Manaus, Nova Olinda do Norte inherits technical-qualification standards (CRCC, sector audits and customer-side homologation standards) and approved suppliers — a favorable context for normalized FB solutions. Road access runs via BR-174 (via RR) / acesso fluvial, with branches through BR-174, BR-319 and BR-230 — a corridor that sets delivery times for rotating equipment and the logistics of technical service. FB Bombas pumps installed in Nova Olinda do Norte, Amazonas meet CRCC Petrobras certification, ASME B73.1 (centrifugal) and API 676 (gear) compliance — credentials FB has sustained as a Brazilian manufacturer since 1944. In Nova Olinda do Norte, Amazonas, FB Bombas serves local industry projects with the FBE, FBCN, FBOT and FBEI series — dedicated application engineering for sizing against the actual system curve, CRCC Petrobras certification and technical compliance with ASME B73.1 (centrifugal), API 676 (gear) and NFPA 20 / NBR 16704 (fire fighting). Cabreúva-SP → Nova Olinda do Norte (2512 km via BR-174 (via RR) / acesso fluvial): origin of FB manufacturing since 1944, with vertical integration on a single site — CNC machining, assembly hydraulic bench and ISO 21940 G2.5 balancing — every unit ships with a traceable Data Book.

Years
Certified
Warranty
Direct answer for industrial projects — recommended series, standards compliance and logistics.
The FBEI gear-pump line is specified in Nova Olinda do Norte, Amazonas for local industry — flow and pressure set by the actual system curve. Cabreúva-SP factory (2512 km), API 676 and direct technical service from FB engineering.
The óleos industriais and água industrial profile observed in Nova Olinda do Norte maps to a precise set of FB series: high viscosity → FBE/FBEI; water and low viscosity → FBCN; heat transfer → FBOT; fire protection → FBFS. Under the IBGE Centro Amazonense mesoregion grouping, Nova Olinda do Norte shares per-capita GDP, workforce profile and environmental-licensing patterns with adjacent cities — macroeconomic variables that reinforce predictability of local B2B demand. For pumping projects in Nova Olinda do Norte, FB Bombas provides dedicated application engineering — pre-sizing against the actual system curve, material selection (AISI 316) and on-site commissioning support. Through 135-km proximity to the free-trade zone cluster of Manaus, Nova Olinda do Norte inherits technical-qualification standards (CRCC, sector audits and customer-side homologation standards) and approved suppliers — a favorable context for normalized FB solutions. Road access runs via BR-174 (via RR) / acesso fluvial, with branches through BR-174, BR-319 and BR-230 — a corridor that sets delivery times for rotating equipment and the logistics of technical service. FB Bombas pumps installed in Nova Olinda do Norte, Amazonas meet CRCC Petrobras certification, ASME B73.1 (centrifugal) and API 676 (gear) compliance — credentials FB has sustained as a Brazilian manufacturer since 1944. In Nova Olinda do Norte, Amazonas, FB Bombas serves local industry projects with the FBE, FBCN, FBOT and FBEI series — dedicated application engineering for sizing against the actual system curve, CRCC Petrobras certification and technical compliance with ASME B73.1 (centrifugal), API 676 (gear) and NFPA 20 / NBR 16704 (fire fighting). Cabreúva-SP → Nova Olinda do Norte (2512 km via BR-174 (via RR) / acesso fluvial): origin of FB manufacturing since 1944, with vertical integration on a single site — CNC machining, assembly hydraulic bench and ISO 21940 G2.5 balancing — every unit ships with a traceable Data Book.
What defines the FBE external gear pump in Nova Olinda do Norte is its behavior under variable pressure: being positive displacement, flow follows speed and practically ignores backpressure swings in the line — the typical case of óleos e água industrial. Two installation requirements follow from this physics: a sized relief valve on the discharge and, for fluids that harden when cold, a heating jacket on the pump body. Technical fit in Nova Olinda do Norte points to FBEI and FBCN as the series suitable for typical local operations — a baseline recommendation; the final specification depends on the specific process parameters. In Nova Olinda do Norte, materials such as austenitic stainless steels (AISI 304/316) with attention to thermal expansion answer the requirements of óleos industriais and água industrial — a combination that drives service life of casing, impeller, shaft and shaft sleeve, refined via corrosion analysis using removal rates (mpy). The technical profile of the zona-franca cluster near Nova Olinda do Norte involves diverse fluids with strong presence of electronics, plastics and specialty chemicals — information that guides preliminary sizing of FB series. The pump-and-motor set shipped to Nova Olinda do Norte undergoes bench hydraulic testing and G2.5 dynamic balancing (ISO 21940), with a traceable report.
Technically, Nova Olinda do Norte shows low complexity in its fluid mix — lean fluid roster — technical operation focused on few main vectors. Demand in Nova Olinda do Norte is characterized by low industrial density — typically standalone projects, without regional cumulative volume, a typical regional pattern of the mesoregion. A GDP of R$ 355 million (IBGE, 2023) with a services profile (17.8% of value added in 2021) places Nova Olinda do Norte's local demand in the utilities field: building pressurization, light process water and fire-fighting systems. The fluid catalogue in Nova Olinda do Norte (óleos industriais and água industrial) demands case-by-case technical analysis: pour point, Saybolt viscosity at operating temperature, suspended solids and pH profile. For Nova Olinda do Norte, special solutions include ASME B73.1 dimensional retrofit with flange and footprint interchangeability, modular skids with integrated automation and mobile sets for decommissioning campaigns. The zona-franca cluster around Nova Olinda do Norte concentrates applications electronics, plastics and consumer goods with variable utility-pumping demand — a technical package where FB Bombas has commissioning, retrofit and long-term support history. Use cases in Nova Olinda do Norte (series FBEI for transferência geral and series FBCN for utilidades) follow the FB technical playbook with benchmarking against an analogous installed base in a comparable region.
Logistics lead time to Nova Olinda do Norte is 72h to 7 days, depending on modal and dry season — variable with cargo type, season and specific optimizations. Alternative routing to Nova Olinda do Norte can use BR-174, BR-319 and BR-230, which helps in heavy-traffic situations or maintenance on specific roads. 2512 km separate the Cabreúva-SP factory from Nova Olinda do Norte via BR-174 (via RR) / acesso fluvial — an axis sized for movement of pumps, skids and pump-and-motor sets. The factory-to-Nova Olinda do Norte logistics cycle begins with documented dispatch: invoice, packing list, test certificates and the equipment's technical manual.
Technical inquiry for the FBE series in Nova Olinda do Norte: real-curve sizing, material recommendation and sealing configuration. Direct service from the FB team.
Talk to engineeringFor over 82 years, we have manufactured industrial pumps in Cabreúva-SP. From north to south, we serve the country's main industrial hubs with gear (FBE/FBEI) and centrifugal (FBCN/FBOT) pumps — engineered, machined and assembled in our own manufacturing facility.
Our engineering team sizes each pump for the customer's actual application, with bench testing before shipping. This technical rigor — combined with direct support from our team — is what has sustained the trust of groups like Petrobras, Vale and CSN for generations.

What changes when the pump comes straight from the manufacturer: engineering, stock and logistics under one roof in Cabreúva-SP.
Technical support across all 27 Brazilian states, from inland regions to major industrial capitals.
Nationwide deliveries through partner carrier network with optimized lead times.
Technical team available for sizing, project work and after-sales support across any region.
Original spare parts for the FBE, FBEI, FBCN and FBOT series stocked at our own factory, ready to ship.
Own factory in Cabreúva/SP with full production capability, serving Nova Olinda do Norte and all of Brazil

Engineering, CNC machining and assembly — all integrated in our Cabreúva/SP factory.

We size and build complete systems, ready for installation at your industrial plant.

We keep original parts in stock for all series, ensuring continuity of your operation.

Production line with centrifugal and gear pumps assembled and tested in our manufacturing plant.
FB Bombas serves Nova Olinda do Norte and the entire Amazonas region with gear pumps (internal & external) and centrifugal pumps for your industrial application. Request a quote and receive a personalized proposal.
Request QuoteComplete pumping solutions for all industrial needs
Our technical team is ready to develop the ideal solution for your application
Contact Us
Our manufacturing plant in Cabreúva-SP integrates engineering, CNC machining and assembly under one roof. Every pump is validated through bench testing before reaching the customer — ensuring it ships ready for real application.
Present in the largest industrial projects in Brazil and Latin America
See specific solutions for Nova Olinda do Norte
Brazilian sectors for which FB Bombas sizes equipment — complete technical guides per application.
Regional service from Nova Olinda do Norte — same series, same factory in Cabreúva/SP.
It depends on the configuration: standard-arrangement pumps have shorter lead times, while special constructions follow the schedule stated in the technical proposal. The deciding factor is the combination of series, materials and stock availability — and transport to Nova Olinda do Norte goes through our regular road operator.
Each series has its thermal limit: with heating jacket and special sealing, FBE and FBEI reach 350°C; FBOT hits the same 350°C in thermal oil circuits; FBCN goes up to 260°C when fitted with proper materials and sealing. Safe operation requires correctly sized sealing and materials.
Yes. Correct sizing is the main lever for energy efficiency — an oversized or undersized pump wastes energy. FB Bombas engineering calculates the optimal operating point considering the actual process conditions in Nova Olinda do Norte, optimizing the flow/pressure/power ratio.
To receive a technical quote for industrial pumps in Nova Olinda do Norte, send via website form, WhatsApp +55 11 97287-4837 or email comercial@fbbombas.com.br the application data: fluid (name + viscosity at operating temperature), target flow (m³/h), discharge head (m), available NPSH, operating temperature and regime (continuous or intermittent). Application engineering responds with a preliminary technical proposal, characteristic curve, suggested materials and delivery lead time.
The portfolio covers four in-house series: FBE (external gear) for viscous fluids, FBEI (internal gear) for low-pulsation services, FBCN (standardized centrifugal) for water and light fluids and FBOT (dedicated centrifugal) for thermal oil — plus complete fire-fighting systems per NFPA 20 and NBR 16704.
Yes. Every FB Bombas pump delivered to Nova Olinda do Norte comes with a complete technical Data Book: hydraulic test certificate, material certificates (stainless, duplex, ductile cast iron per spec), ISO 21940 G2.5 balancing report, characteristic curve measured on the bench, API 682 mechanical-seal data sheets, operation and maintenance manual, and as-built drawings. All documentation is traceable by the unit serial number.
They do. In the FBE and FBCN lines, wear-affected components sit in easily accessible positions, so conventional tools suffice for disassembly and inspection. Add detailed technical manuals and factory-direct availability of replacement parts — and maintenance becomes an uncomplicated routine.
Yes. FB Bombas application engineering supports ISO 10816 vibration analysis (velocity RMS in mm/s) for diagnosing misalignment, imbalance, bearing defects and cavitation on pumps installed in Nova Olinda do Norte. The service includes baseline capture at startup, spectral comparison during PM campaigns, and intervention recommendations (re-balancing, bearing replacement, laser alignment) before vibration exceeds the standard’s zone D.
Sizing is performed by FB Bombas’ application engineering team based on four key variables: desired flow, differential pressure, working temperature and fluid viscosity. Additional data such as available NPSH, operating cycle and fluid chemical compatibility are also considered. The service is free of charge for customers in Nova Olinda do Norte.
You can reach us on WhatsApp at +55 11 97287-4837, write to comercial@fbbombas.com.br or fill in the website form. Technical requests receive prioritized feedback within the same business day, coming straight from application engineering.
Fill out the form and our technical team will contact you to size the ideal pump — gear (FBE/FBEI) or centrifugal (FBCN/FBOT).