Skip to main content
FB Bombas industrial facility in Cabreúva-SP, Brazil
100% Brazilian Company
FBE Gear Pumps

FBE Gear Pumps in Presidente Bernardes

Cabreúva-SP → Presidente Bernardes (476 km via SP-300 Rodovia Marechal Rondon (via Rodoanel SP-021)): origin of FB manufacturing since 1944, with vertical integration on a single site — CNC machining, assembly hydraulic bench and ISO 21940 G2.5 balancing — every unit ships with a traceable Data Book. Presidente Bernardes is served by the SP-300 Rodovia Marechal Rondon (via Rodoanel SP-021) axis and also by highways SP-300, SP-021, SP-330, BR-116 and BR-374 for heavy-cargo movement — relevant for delivery of mounted skids and large pump-and-motor sets. FB Bombas pumps installed in Presidente Bernardes, São Paulo meet CRCC Petrobras certification, API 610 (centrifugal) and API 676 (gear) compliance — credentials FB has sustained as a Brazilian manufacturer since 1944. Brazilian industrial-pump manufacturer since 1944, FB Bombas supplies Presidente Bernardes, São Paulo with the FBE, FBCN, FBOT, FBEI series and FBFS fire-fighting systems — designed and produced in Cabreúva-SP with API 610 / API 676 compliance, ASME B73.1 normalization (interchangeable with global manufacturers) and a traceable Data Book on every unit shipped. Only 140 km from the pulp-and-paper cluster of Tres Lagoas, Presidente Bernardes benefits from logistics spillover and movement of technical professionals — FB Bombas has a service track record in the region. FB Bombas application engineering serves Presidente Bernardes with custom technical sizing: system characteristic curve, available NPSH, in-service viscosity and mechanical-seal strategy (API Plan 11, 13, 52 or 53 by criticality). The fluid roster in Presidente Bernardes (óleos industriais and água industrial) demands attention to viscosity, operating temperature and chemical compatibility — variables that FB application engineering uses to recommend the proper series.

Nationwide Service
481km from factory
80+

Years

API

Certified

100%

Warranty

80+
Years in Market
CRCC
Petrobras Approved
27
States Served
API 610/676
Certified Pumps

Technical summary

Direct answer for industrial projects — recommended series, standards compliance and logistics.

Technical summary

The FBEI gear-pump line is specified in Presidente Bernardes, São Paulo for local industry — flow and pressure set by the actual system curve. Cabreúva-SP factory (476 km), API 676 and direct technical service from FB engineering.

Local technical content

FBE Gear Pumps Industrial in Presidente Bernardes

Local context

Cabreúva-SP → Presidente Bernardes (476 km via SP-300 Rodovia Marechal Rondon (via Rodoanel SP-021)): origin of FB manufacturing since 1944, with vertical integration on a single site — CNC machining, assembly hydraulic bench and ISO 21940 G2.5 balancing — every unit ships with a traceable Data Book. Presidente Bernardes is served by the SP-300 Rodovia Marechal Rondon (via Rodoanel SP-021) axis and also by highways SP-300, SP-021, SP-330, BR-116 and BR-374 for heavy-cargo movement — relevant for delivery of mounted skids and large pump-and-motor sets. FB Bombas pumps installed in Presidente Bernardes, São Paulo meet CRCC Petrobras certification, API 610 (centrifugal) and API 676 (gear) compliance — credentials FB has sustained as a Brazilian manufacturer since 1944. Brazilian industrial-pump manufacturer since 1944, FB Bombas supplies Presidente Bernardes, São Paulo with the FBE, FBCN, FBOT, FBEI series and FBFS fire-fighting systems — designed and produced in Cabreúva-SP with API 610 / API 676 compliance, ASME B73.1 normalization (interchangeable with global manufacturers) and a traceable Data Book on every unit shipped. Only 140 km from the pulp-and-paper cluster of Tres Lagoas, Presidente Bernardes benefits from logistics spillover and movement of technical professionals — FB Bombas has a service track record in the region. FB Bombas application engineering serves Presidente Bernardes with custom technical sizing: system characteristic curve, available NPSH, in-service viscosity and mechanical-seal strategy (API Plan 11, 13, 52 or 53 by criticality). The fluid roster in Presidente Bernardes (óleos industriais and água industrial) demands attention to viscosity, operating temperature and chemical compatibility — variables that FB application engineering uses to recommend the proper series.

Technical solutions

Presidente Bernardes: transferência geral and utilidades. This application mix is covered by the recommended FB series, with case-by-case fine tuning. Presidente Bernardes typically calls for FBEI and FBCN — an initial recommendation based on local productFit, dominant industrial cluster and identified fluid profile; final technical approval is refined by application engineering. In Presidente Bernardes, the sealing strategy starts at single cartridge mechanical seal (Plan 11/13) for general service, upgradable to dual when the fluid requires secondary containment — combined with API 682 plan selection (Plan 11/13/52/53/62) and specific commissioning care. Presidente Bernardes receives equipment after hydraulic testing and ISO 21940 G2.5 balancing — traceable report attached to the Data Book.

Why FB Bombas

In Presidente Bernardes, the low complexity index in the fluid mix sets lean fluid roster — technical operation focused on few main vectors — a factor adjusting both technical-spec depth and materials-catalogue scope. In Presidente Bernardes, medium density — regular and predictable opportunity pipeline — a characteristic that sizes FB's commercial strategy: application-engineering coverage, visit cadence and depth of consignment stock. In Presidente Bernardes, papel-celulose-cluster seasonality manifests as annual maintenance shutdowns concentrate demand into predictable windows — information FB Bombas uses to schedule plant capacity and ready-to-ship inventory. Presidente Bernardes: óleos industriais and água industrial. Each fluid defines a distinct set of pump requirements — flow, available NPSH, sealing strategy. white/black liquor circulation, recovery-boiler feed and low-to-medium consistency stock pumping: this is the typical application set around the papel-celulose cluster in which Presidente Bernardes sits. For Presidente Bernardes, series FBEI for transferência geral and series FBCN for utilidades — initial reference for technical discussion with application engineering.

Logistics & support

Logistics lead time to Presidente Bernardes is 24-48h via federal highways — variable with cargo type, season and specific optimizations. 476 km separate the Cabreúva-SP factory from Presidente Bernardes via SP-300 Rodovia Marechal Rondon (via Rodoanel SP-021) — an axis sized for movement of pumps, skids and pump-and-motor sets. The factory-to-Presidente Bernardes logistics cycle begins with documented dispatch: invoice, packing list, test certificates and the equipment's technical manual.

Request your proposal

For projects with FBE pumps in Presidente Bernardes, talk to FB application engineering: viscosity analysis, available NPSH, seal materials and operating regime — technical response within 24-48 business hours.

Talk to engineering
for Presidente Bernardes
Why FB Bombas

National leadership in industrial pumping

For over 82 years, we have manufactured industrial pumps in Cabreúva-SP. From north to south, we serve the country's main industrial hubs with gear (FBE/FBEI) and centrifugal (FBCN/FBOT) pumps — engineered, machined and assembled in our own manufacturing facility.

Our engineering team sizes each pump for the customer's actual application, with bench testing before shipping. This technical rigor — combined with direct support from our team — is what has sustained the trust of groups like Petrobras, Vale and CSN for generations.

FB Bombas manufacturing plant in Cabreúva-SP — Brazilian industrial pump manufacturer
Brazil Differentiators

Advantages for your Industrial Operation

Four differentiators that make FB Bombas the choice of leading Brazilian industries.

Complete National Coverage

Technical support across all 27 Brazilian states, from inland regions to major industrial capitals.

Brazil-Wide Logistics

Nationwide deliveries through partner carrier network with optimized lead times.

Dedicated Engineering

Technical team available for sizing, project work and after-sales support across any region.

Strategic Stock

Original parts in stock for all series, ensuring operational continuity with zero downtime.

Discover FB Bombas

Own factory in Cabreúva/SP with full production capability, serving Presidente Bernardes and all of Brazil

FB Bombas manufacturing plant with CNC machines and technical team in Cabreúva SP Brazil

Own Manufacturing

Engineering, CNC machining and assembly — all integrated in our Cabreúva/SP factory.

FB Bombas fire fighting system delivered to customer

Custom Projects

We size and build complete systems, ready for installation at your industrial plant.

FB Bombas replacement parts warehouse for industrial pumps

Replacement Parts

We keep original parts in stock for all series, ensuring continuity of your operation.

FBCN centrifugal pumps on FB Bombas factory floor

Industrial Production

Production line with centrifugal and gear pumps assembled and tested in our manufacturing plant.

FB Bombas serves Presidente Bernardes and the entire São Paulo region with gear pumps (internal & external) and centrifugal pumps for your industrial application. Request a quote and receive a personalized proposal.

Request Quote
FB Bombas production line with FBCN centrifugal pumps on the factory floor
Industrial Capacity

Production line dedicated to industrial pumps

Our manufacturing plant in Cabreúva-SP integrates engineering, CNC machining and assembly under one roof. Every pump is validated through bench testing before reaching the customer — ensuring it ships ready for real application.

350°C
Max. Temp. FBOT
1,350 l/min
Max. Flow FBE
2,200 m³/h
Max. Flow FBCN

Companies that Trust FB Bombas

Present in the largest industrial projects in Brazil and Latin America

Petrobras - Cliente FB Bombas
Vale - Cliente FB Bombas
BASF - Cliente FB Bombas
CSN - Cliente FB Bombas
WEG - Cliente FB Bombas
Cargill - Cliente FB Bombas
Ipiranga - Cliente FB Bombas
Mahle - Cliente FB Bombas
3M - Cliente FB Bombas

Gear Pumps in Nearby Cities

Regional service from Presidente Bernardes — same series, same factory in Cabreúva/SP.

Frequently Asked Questions about Presidente Bernardes

Contact can be made via WhatsApp at +55 11 97287-4837, email comercial@fbbombas.com.br or through the form on our website. Technical response is prioritized on the same business day, with direct reply from the application engineering team.

Lead time depends on the chosen series, construction materials and stock availability. For standard configuration pumps, lead times are shorter; for special or custom constructions, the schedule is informed in the technical proposal. Logistics for Presidente Bernardes is handled by our regular road operator.

Yes. The FAT (Factory Acceptance Test) is executed on the factory bench in Cabreúva/SP, with hydraulic test, characteristic-curve measurement (Q × H), hydraulic efficiency, NPSHr and ISO 10816 vibration — witnessed by customer inspection when specified. For projects in Presidente Bernardes, the SAT (Site Acceptance Test) is supported by application engineering during commissioning, with startup checklist, laser alignment and baseline vibration-signature capture.

For critical parts (mechanical seal, impeller, shaft, wear ring, bearings) during a plant shutdown in Presidente Bernardes, FB Bombas runs an emergency flow: pre-invoicing, priority dispatch and alternative modal (express road or air transport depending on distance and criticality). Typical lead time varies by region, with a window negotiable case by case. For customers with an installed base and scheduled PM, part of the stock can be kept on consignment at the plant.

Maximum temperature depends on the series: FBE and FBEI operate up to 350°C with heating jacket and special sealing; FBOT operates up to 350°C in thermal oil circuits; FBCN operates up to 250°C with proper materials and sealing. Correct sizing of sealing and materials is essential for safe operation.

Yes. The FBCN series complies with ASME B73.1 (North American standard for horizontal end-suction process centrifugal pumps) — a feature that enables dimensional retrofit on existing baseplates in Presidente Bernardes plants originally equipped with KSB, Sulzer, Goulds or Flowserve. Shaft dimensions, suction/discharge flanges, casing feet and impeller centerline follow the standard; the rotating set is swapped without changing piping or baseplate.

FB Bombas has been manufacturing industrial pumps since 1944, with over 82 years of continuous experience. The factory in Cabreúva/SP operates with engineering, manufacturing and testing under one roof, ensuring total quality control on every unit supplied to Presidente Bernardes and all of Brazil.

Mechanical seal configuration is defined by engineering according to the fluid, temperature and operating pressure. Options include single seals, double seals (tandem or back-to-back), cartridge seals and packing glands for specific applications. For hazardous fluids, double seals with barrier are recommended.

Yes. The FBE and FBCN lines were designed with easy access to wear-prone components, allowing disassembly and inspection with conventional tools. Detailed technical manuals and direct factory replacement parts availability simplify maintenance routines.

Yes. Since FB Bombas manufactures entirely in Cabreúva/SP, replacement parts for the FBE, FBEI, FBCN and FBOT series are available directly from the factory, with short lead times for scheduled stops and priority service for emergencies. This significantly reduces total cost of ownership.

Need gear or centrifugal pumps in Presidente Bernardes?

Fill out the form and our technical team will contact you to size the ideal pump — gear (FBE/FBEI) or centrifugal (FBCN/FBOT).

How we reach youFour required fields. Engineering replies after briefing analysis.
Add technical application dataFlow, fluid, viscosity. More detail means a sharper first reply — all optional.
Your messageDeadline, project standard, notes. Attachments by e-mail afterwards.

Reply after briefing analysis