Technical summary
FBEI gear pumps (FB Bombas) in Taió, Santa Catarina: sized for local industry, viscous fluids up to 350°C, API 676 compliance and in-house manufacturing in Cabreúva-SP at 512 km. Typical critical-parts lead time: 48-72h.


The óleos industriais and água industrial profile observed in Taió maps to a precise set of FB series: high viscosity → FBE/FBEI; water and low viscosity → FBCN; heat transfer → FBOT; fire protection → FBFS. The road network BR-116, BR-101 and BR-282, with BR-116 Rodovia Régis Bittencourt as the main axis, defines response time for critical-part shipments and technical visits to Taió. Under the IBGE Vale do Itajaí mesoregion grouping, Taió shares per-capita GDP, workforce profile and environmental-licensing patterns with adjacent cities — macroeconomic variables that reinforce predictability of local B2B demand. In Taió, Santa Catarina, FB Bombas serves local industry projects with the FBE, FBCN, FBOT and FBEI series — dedicated application engineering for sizing against the actual system curve, CRCC Petrobras certification and technical compliance with ASME B73.1 (centrifugal), API 676 (gear) and NFPA 20 / NBR 16704 (fire fighting). FB Bombas application engineering serves Taió with custom technical sizing: system characteristic curve, available NPSH, in-service viscosity and mechanical-seal strategy (API Plan 11, 13, 52 or 53 by criticality). For the Taió, Santa Catarina market, FB Bombas offers industrial pumps with certified hydraulic tests, ASME B73.1 (dimensional interchangeability) and a traceable Data Book per unit — a technical package that shortens the customer homologation cycle. From the Cabreúva-SP factory, 512 km via BR-116 Rodovia Régis Bittencourt, FB Bombas reaches Taió with FBE, FBCN, FBOT inventory and engineering capability for special projects.
The óleos industriais and água industrial profile observed in Taió maps to a precise set of FB series: high viscosity → FBE/FBEI; water and low viscosity → FBCN; heat transfer → FBOT; fire protection → FBFS. The road network BR-116, BR-101 and BR-282, with BR-116 Rodovia Régis Bittencourt as the main axis, defines response time for critical-part shipments and technical visits to Taió. Under the IBGE Vale do Itajaí mesoregion grouping, Taió shares per-capita GDP, workforce profile and environmental-licensing patterns with adjacent cities — macroeconomic variables that reinforce predictability of local B2B demand. In Taió, Santa Catarina, FB Bombas serves local industry projects with the FBE, FBCN, FBOT and FBEI series — dedicated application engineering for sizing against the actual system curve, CRCC Petrobras certification and technical compliance with ASME B73.1 (centrifugal), API 676 (gear) and NFPA 20 / NBR 16704 (fire fighting). FB Bombas application engineering serves Taió with custom technical sizing: system characteristic curve, available NPSH, in-service viscosity and mechanical-seal strategy (API Plan 11, 13, 52 or 53 by criticality). For the Taió, Santa Catarina market, FB Bombas offers industrial pumps with certified hydraulic tests, ASME B73.1 (dimensional interchangeability) and a traceable Data Book per unit — a technical package that shortens the customer homologation cycle. From the Cabreúva-SP factory, 512 km via BR-116 Rodovia Régis Bittencourt, FB Bombas reaches Taió with FBE, FBCN, FBOT inventory and engineering capability for special projects.

Years
Compliant
Tested
Direct answer for industrial projects — recommended series, standards compliance and logistics.
FBEI gear pumps (FB Bombas) in Taió, Santa Catarina: sized for local industry, viscous fluids up to 350°C, API 676 compliance and in-house manufacturing in Cabreúva-SP at 512 km. Typical critical-parts lead time: 48-72h.
The óleos industriais and água industrial profile observed in Taió maps to a precise set of FB series: high viscosity → FBE/FBEI; water and low viscosity → FBCN; heat transfer → FBOT; fire protection → FBFS. The road network BR-116, BR-101 and BR-282, with BR-116 Rodovia Régis Bittencourt as the main axis, defines response time for critical-part shipments and technical visits to Taió. Under the IBGE Vale do Itajaí mesoregion grouping, Taió shares per-capita GDP, workforce profile and environmental-licensing patterns with adjacent cities — macroeconomic variables that reinforce predictability of local B2B demand. In Taió, Santa Catarina, FB Bombas serves local industry projects with the FBE, FBCN, FBOT and FBEI series — dedicated application engineering for sizing against the actual system curve, CRCC Petrobras certification and technical compliance with ASME B73.1 (centrifugal), API 676 (gear) and NFPA 20 / NBR 16704 (fire fighting). FB Bombas application engineering serves Taió with custom technical sizing: system characteristic curve, available NPSH, in-service viscosity and mechanical-seal strategy (API Plan 11, 13, 52 or 53 by criticality). For the Taió, Santa Catarina market, FB Bombas offers industrial pumps with certified hydraulic tests, ASME B73.1 (dimensional interchangeability) and a traceable Data Book per unit — a technical package that shortens the customer homologation cycle. From the Cabreúva-SP factory, 512 km via BR-116 Rodovia Régis Bittencourt, FB Bombas reaches Taió with FBE, FBCN, FBOT inventory and engineering capability for special projects.
What defines the FBE external gear pump in Taió is its behavior under variable pressure: being positive displacement, flow follows speed and practically ignores backpressure swings in the line — the typical case of óleos e água industrial. Two installation requirements follow from this physics: a sized relief valve on the discharge and, for fluids that harden when cold, a heating jacket on the pump body. For óleos industriais and água industrial in Taió, the baseline is cast iron with proper coating or stainless steels when the fluid requires — FB engineering tunes from immersion tests, field history and iron/stainless/duplex compatibility within the local fluid classes. Technical fit in Taió points to FBEI and FBCN as the series suitable for typical local operations — a baseline recommendation; the final specification depends on the specific process parameters. The pump-and-motor set shipped to Taió undergoes bench hydraulic testing and G2.5 dynamic balancing (ISO 21940), with a traceable report.
In Taió, the low complexity index in the fluid mix sets lean fluid roster — technical operation focused on few main vectors — a factor adjusting both technical-spec depth and materials-catalogue scope. In Taió, medium density — regular and predictable opportunity pipeline — a characteristic that sizes FB's commercial strategy: application-engineering coverage, visit cadence and depth of consignment stock. The economic fabric of Taió is diversified: services lead, but industry holds 24.5% of municipal value added (IBGE, 2021), over a 2023 GDP of R$ 1 billion — real demand for both process pumps and building utilities and sanitation. Taió: óleos industriais and água industrial. Each fluid defines a distinct set of pump requirements — flow, available NPSH, sealing strategy. For Taió, series FBEI for transferência geral and series FBCN for utilidades — initial reference for technical discussion with application engineering. bunker (BPF fuel oil), marine cooling water and liquid-bulk discharge: this is the typical application set around the portuario cluster in which Taió sits.
Taió receives equipment within 24-48h via federal highways counted from dispatch at the Cabreúva-SP factory. Cabreúva-SP to Taió: 512 km via BR-116 Rodovia Régis Bittencourt, a consolidated corridor with carriers qualified by FB Bombas for heavy-equipment cargo. Before shipment to Taió, each piece of equipment undergoes dimensional inspection, hydraulic testing and document verification.
For projects with FBE pumps in Taió, talk to FB application engineering: viscosity analysis, available NPSH, seal materials and operating regime — technical response within 24-48 business hours.
Talk to engineeringFor over 82 years, we have manufactured industrial pumps in Cabreúva-SP. From north to south, we serve the country's main industrial hubs with gear (FBE/FBEI) and centrifugal (FBCN/FBOT) pumps — engineered, machined and assembled in our own manufacturing facility.
Our engineering team sizes each pump for the customer's actual application, with bench testing before shipping. This technical rigor — combined with direct support from our team — is what has sustained the trust of groups like Petrobras, Vale and CSN for generations.

What changes when the pump comes straight from the manufacturer: engineering, stock and logistics under one roof in Cabreúva-SP.
Technical support across all 27 Brazilian states, from inland regions to major industrial capitals.
Nationwide deliveries through partner carrier network with optimized lead times.
Technical team available for sizing, project work and after-sales support across any region.
Original spare parts for the FBE, FBEI, FBCN and FBOT series stocked at our own factory, ready to ship.
Own factory in Cabreúva/SP with full production capability, serving Taió and all of Brazil

Engineering, CNC machining and assembly — all integrated in our Cabreúva/SP factory.

We size and build complete systems, ready for installation at your industrial plant.

We keep original parts in stock for all series, ensuring continuity of your operation.

Production line with centrifugal and gear pumps assembled and tested in our manufacturing plant.
FB Bombas serves Taió and the entire Santa Catarina region with gear pumps (internal & external) and centrifugal pumps for your industrial application. Request a quote and receive a personalized proposal.
Request QuoteFour catalog series, fire-fighting systems and engineered-to-order — in-house manufacturing and hydrostatic testing on 100% of pumps
Our technical team is ready to develop the ideal solution for your application
Contact Us
Our manufacturing plant in Cabreúva-SP integrates engineering, CNC machining and assembly under one roof. Every pump is validated through bench testing before reaching the customer — ensuring it ships ready for real application.
Present in the largest industrial projects in Brazil and Latin America









See specific solutions for Taió
Brazilian sectors for which FB Bombas sizes equipment — complete technical guides per application.
Regional service from Taió — same series, same factory in Cabreúva/SP.
Yes. Since FB Bombas manufactures entirely in Cabreúva/SP, replacement parts for the FBE, FBEI, FBCN and FBOT series are available directly from the factory, with short lead times for scheduled stops and priority service for emergencies. This significantly reduces total cost of ownership.
It does. FB Bombas' technical training program for operators and maintainers in Taió covers: characteristic-curve reading and sizing, cavitation identified via NPSH, mechanical-seal troubleshooting, laser alignment, vibration analyzed per ISO 10816 and preventive maintenance (PM) practice, including bearing and wear-ring replacement. Location and format are flexible — customer plant or the Cabreúva/SP factory, in person or hybrid.
Credentials include an active Petrobras CRCC, API 676 compliance on the FBE gear line, ASME B73.1 compliance on the FBCN centrifugal and adherence to NFPA 20 and NBR 16704 on fire-fighting systems. Technical documentation and data book accompany supplies upon requirement.
FB pumps are supplied with a warranty against manufacturing defects according to the terms detailed in the commercial proposal. The warranty assumes installation, operation and maintenance within the parameters specified in the manual and sizing performed by engineering. Consult our technical team for specific details of your project in Taió.
Yes. FB Bombas offers retrofit of existing installations, including seal upgrades, replacement of worn components, adaptation for new fluids and hydraulic performance improvement. The assessment is based on a technical report of the current installation.
Send the application data through the website form, WhatsApp +55 11 97287-4837 or email comercial@fbbombas.com.br: fluid (name and viscosity at operating temperature), target flow in m³/h, discharge head in m, available NPSH, operating temperature and regime — continuous or intermittent. After reviewing the briefing, application engineering returns a preliminary technical proposal, characteristic curve, suggested materials and delivery lead time for your project in Taió.
During a plant shutdown in Taió, critical parts — mechanical seal, impeller, shaft, wear ring, bearings — enter FB Bombas' emergency flow: pre-invoicing, priority dispatch and choice of alternative modal (express road or air, depending on distance and criticality). Typical lead time depends on the region and the window is negotiated case by case. Customers with an installed base and scheduled PM can keep part of the stock on consignment at the plant.
Yes — and the secret lies in correct sizing, the main lever for energy efficiency. Both an oversized and an undersized pump waste energy. That is why FB Bombas engineering determines the optimal operating point from the actual process conditions in Taió, balancing the flow/pressure/power ratio.
Application engineering starts from four variables — flow, differential pressure, temperature and viscosity — and refines with available NPSH, duty cycle and chemical compatibility. The study is free for customers in Taió and results in the exact model recommendation, not a generic family.
It does. When a special application demands something beyond the standard portfolio, FB Bombas develops the solution: modified construction materials, specific sealing arrangements, system-integrated heating, skids, mobile assemblies and retrofit of existing installations. Engineering reviews each special project as a step prior to manufacturing.
Fill out the form and our technical team will contact you to size the ideal pump — gear (FBE/FBEI) or centrifugal (FBCN/FBOT).