Technical summary
In Ouro Preto, Minas Gerais, FBEI (external gear) serves Quadrilátero Ferrífero with 12 sizes (1/8" to 6"), pressure up to 22 kgf/cm² and field-validated materials. Cabreúva-SP at 497 km, 48-72h logistics lead time.


FB Bombas serves Ouro Preto from its Cabreúva-SP factory, with transport via BR-381 Rodovia Fernão Dias and application-engineering support for dimensioning according to the actual operation profile. Under the IBGE Metropolitana de Belo Horizonte mesoregion grouping, Ouro Preto shares per-capita GDP, workforce profile and environmental-licensing patterns with adjacent cities — macroeconomic variables that reinforce predictability of local B2B demand. Ouro Preto is part of an industrial corridor with Mariana, Ouro Branco Mg and Itabirito, a configuration that favors freight consolidation, consignment stock and regional-scale synchronized PMs. For projects in Ouro Preto that demand formal technical qualification, FB Bombas series cover ASME B73.1 (FBCN), API 676 (FBE/FBEI), NFPA 20 and NBR 16704 (FBFS systems) — a combination that removes the need for additional suppliers across fire-fighting and process scope. In Ouro Preto, Mineração and Metalurgia concentrate the largest share of demand for rotating equipment — a technical agenda well known to the FB application team, with proposals sized against the actual system curve. The mining cluster of Mariana is 9 km from Ouro Preto, generating economic spillover and correlated technical demand — common in pumping projects involving both cities. The FB Bombas FBCN series answers mineração demand in Ouro Preto — FBCN centrifugal pumps for industrial water transfer, pulps and slurries in mining operations. Operating range: High flow up to 1,200 m³/h, Abrasive resistance, Multiple construction materials. In Ouro Preto, Minas Gerais, FB Bombas serves mineração projects with the FBCN series — dedicated application engineering for sizing against the actual system curve, CRCC Petrobras certification and technical compliance with ASME B73.1 (centrifugal), API 676 (gear) and NFPA 20 / NBR 16704 (fire fighting). In Ouro Preto, FB Bombas serves projects with in-house application engineering: system-curve analysis, NPSH balance (available vs required), series selection (FBE / FBCN / FBOT / FBEI / FBFS) and API 682 sealing plan. Logistically, the city connects to Cabreúva-SP via BR-381 Rodovia Fernão Dias, complemented by alternatives BR-381, BR-040, BR-262 and BR-116 — a network that supports technical service within tight operational windows. Ouro Preto requires pumping of óleos hidráulicos, fluidos de corte, água de processo and lamas diluídas, a fluid set for which FB Bombas already has product series with field-validated material selection.
FB Bombas serves Ouro Preto from its Cabreúva-SP factory, with transport via BR-381 Rodovia Fernão Dias and application-engineering support for dimensioning according to the actual operation profile. Under the IBGE Metropolitana de Belo Horizonte mesoregion grouping, Ouro Preto shares per-capita GDP, workforce profile and environmental-licensing patterns with adjacent cities — macroeconomic variables that reinforce predictability of local B2B demand. Ouro Preto is part of an industrial corridor with Mariana, Ouro Branco Mg and Itabirito, a configuration that favors freight consolidation, consignment stock and regional-scale synchronized PMs. For projects in Ouro Preto that demand formal technical qualification, FB Bombas series cover ASME B73.1 (FBCN), API 676 (FBE/FBEI), NFPA 20 and NBR 16704 (FBFS systems) — a combination that removes the need for additional suppliers across fire-fighting and process scope. In Ouro Preto, Mineração and Metalurgia concentrate the largest share of demand for rotating equipment — a technical agenda well known to the FB application team, with proposals sized against the actual system curve. The mining cluster of Mariana is 9 km from Ouro Preto, generating economic spillover and correlated technical demand — common in pumping projects involving both cities. The FB Bombas FBCN series answers mineração demand in Ouro Preto — FBCN centrifugal pumps for industrial water transfer, pulps and slurries in mining operations. Operating range: High flow up to 1,200 m³/h, Abrasive resistance, Multiple construction materials. In Ouro Preto, Minas Gerais, FB Bombas serves mineração projects with the FBCN series — dedicated application engineering for sizing against the actual system curve, CRCC Petrobras certification and technical compliance with ASME B73.1 (centrifugal), API 676 (gear) and NFPA 20 / NBR 16704 (fire fighting). In Ouro Preto, FB Bombas serves projects with in-house application engineering: system-curve analysis, NPSH balance (available vs required), series selection (FBE / FBCN / FBOT / FBEI / FBFS) and API 682 sealing plan. Logistically, the city connects to Cabreúva-SP via BR-381 Rodovia Fernão Dias, complemented by alternatives BR-381, BR-040, BR-262 and BR-116 — a network that supports technical service within tight operational windows. Ouro Preto requires pumping of óleos hidráulicos, fluidos de corte, água de processo and lamas diluídas, a fluid set for which FB Bombas already has product series with field-validated material selection.

Years
Compliant
Tested
Direct answer for industrial projects — recommended series, standards compliance and logistics.
In Ouro Preto, Minas Gerais, FBEI (external gear) serves Quadrilátero Ferrífero with 12 sizes (1/8" to 6"), pressure up to 22 kgf/cm² and field-validated materials. Cabreúva-SP at 497 km, 48-72h logistics lead time.
FB Bombas serves Ouro Preto from its Cabreúva-SP factory, with transport via BR-381 Rodovia Fernão Dias and application-engineering support for dimensioning according to the actual operation profile. Under the IBGE Metropolitana de Belo Horizonte mesoregion grouping, Ouro Preto shares per-capita GDP, workforce profile and environmental-licensing patterns with adjacent cities — macroeconomic variables that reinforce predictability of local B2B demand. Ouro Preto is part of an industrial corridor with Mariana, Ouro Branco Mg and Itabirito, a configuration that favors freight consolidation, consignment stock and regional-scale synchronized PMs. For projects in Ouro Preto that demand formal technical qualification, FB Bombas series cover ASME B73.1 (FBCN), API 676 (FBE/FBEI), NFPA 20 and NBR 16704 (FBFS systems) — a combination that removes the need for additional suppliers across fire-fighting and process scope. In Ouro Preto, Mineração and Metalurgia concentrate the largest share of demand for rotating equipment — a technical agenda well known to the FB application team, with proposals sized against the actual system curve. The mining cluster of Mariana is 9 km from Ouro Preto, generating economic spillover and correlated technical demand — common in pumping projects involving both cities. The FB Bombas FBCN series answers mineração demand in Ouro Preto — FBCN centrifugal pumps for industrial water transfer, pulps and slurries in mining operations. Operating range: High flow up to 1,200 m³/h, Abrasive resistance, Multiple construction materials. In Ouro Preto, Minas Gerais, FB Bombas serves mineração projects with the FBCN series — dedicated application engineering for sizing against the actual system curve, CRCC Petrobras certification and technical compliance with ASME B73.1 (centrifugal), API 676 (gear) and NFPA 20 / NBR 16704 (fire fighting). In Ouro Preto, FB Bombas serves projects with in-house application engineering: system-curve analysis, NPSH balance (available vs required), series selection (FBE / FBCN / FBOT / FBEI / FBFS) and API 682 sealing plan. Logistically, the city connects to Cabreúva-SP via BR-381 Rodovia Fernão Dias, complemented by alternatives BR-381, BR-040, BR-262 and BR-116 — a network that supports technical service within tight operational windows. Ouro Preto requires pumping of óleos hidráulicos, fluidos de corte, água de processo and lamas diluídas, a fluid set for which FB Bombas already has product series with field-validated material selection.
Ouro Preto receives equipment after hydraulic testing and ISO 21940 G2.5 balancing — traceable report attached to the Data Book. ASME B73.1 for horizontal normalized centrifugal pumps — consolidated market standard: this is the normative package applied in Ouro Preto — defining acceptance testing, dimensional tolerances, material requirements and the Data Book delivered to the customer. The applicable operating envelope spans FBCN centrifugal pumps with flow up to 2,200 m³/h, head up to 135 m and temperature up to 260°C (thermal oil via FBOT up to 350°C) — sufficient for most industrial applications identified in Ouro Preto. The mineracao cluster near Ouro Preto brings a technical agenda of diluted slurries, process water with abrasive solids and slurry pumps when applicable — a reference FB Bombas uses as a benchmark for initial sizing and series selection. The hidráulica industrial, recalque de água, barragens de rejeito and resfriamento de moldes set accounts for a large share of industrial demand in Ouro Preto; FB Bombas keeps documented history of analogous applications for sizing benchmarks. In Ouro Preto, FBEI and FBCN+FBOT cover the technical range observed in the field — from primary transfer and circulation to replacing an installed pump carrying the same ASME B73.1 dimensional designation. In Ouro Preto, materials such as cast iron with proper coating or stainless steels when the fluid requires answer the requirements of óleos hidráulicos, fluidos de corte and água de processo — a combination that drives service life of casing, impeller, shaft and shaft sleeve, refined via corrosion analysis using removal rates (mpy). For the industrial park of Ouro Preto, the FBE series answers the services kinetic hydraulics cannot cover: transfer with stable flow under fluctuating pressure, dosing proportional to speed and high-viscosity fluids — the typical case of água de mina e lamas diluídas. Sizing validates starting torque at the coldest condition of the year — the classic mistake that shears keys in undersized pumps.
Fluid-roster complexity in Ouro Preto is high — diversified fluid roster — requires a broad catalogue of materials and sealing configurations. Typical seasonality of the mineracao cluster (24/7 operation with annual scheduled outages — concentrated PM windows and continuous demand for critical parts) directly impacts supply scheduling and PMs in Ouro Preto. Ouro Preto has a specific regional profile, with industrial demand sized to its scale — a feature that enters the sizing of the service strategy. Economically, delivery to Ouro Preto brings balanced logistics — freight is a contained fraction of equipment cost. The demand profile in Ouro Preto reflects medium density — regular and predictable opportunity pipeline. The economic base of Ouro Preto confirms the profile: industry accounted for 69.8% of municipal value added (IBGE, 2021), and 2023 GDP totaled R$ 6.8 billion — a scale that sustains recurring demand for process pumps, utilities and installed-fleet replacement. Ouro Preto: óleos hidráulicos, fluidos de corte and água de processo. Each fluid defines a distinct set of pump requirements — flow, available NPSH, sealing strategy. The FBFS line serves Ouro Preto with fire-protection systems compliant with NFPA 20, NBR 16704 and NBR 10897, in electric, diesel and hybrid configurations. Ouro Preto is embedded in a microregion with dense industrial neighborhood, a context that favors shared technical-service logistics and distributed parts inventory. process-water booster, slurry pumping, pit dewatering and tailings dam services: this is the typical application set around the mineracao cluster in which Ouro Preto sits. Ouro Preto has mineração as its main industrial-pump application front — from primary transfer to internal circulation in process equipment. Custom solutions for Ouro Preto may include skids with integrated control panel, hydraulic retrofit and mobile units for temporary campaigns. For Ouro Preto, series FBEI for hidráulica industrial and series FBCN+FBOT for recalque de água and barragens de rejeito — initial reference for technical discussion with application engineering.
For Ouro Preto, 24-48h via federal highways is the standard contractual transit window — compressible via emergency air modal for critical parts, on specific demand. The BR-381, BR-040, BR-262 and BR-116 mesh provides logistics redundancy for Ouro Preto — when one route is restricted (rains, construction, accidents), delivery is rerouted without compromising the critical lead time. In Ouro Preto, large sets arrive via lowboy or platform trailers with special transit permit — operation coordinated by FB logistics engineering. For Ouro Preto, FB service follows the planned technical visits with 1-2 day mobilization window — direct coordination with the customer model — application engineers conduct pre-scheduled visits while remote support via documentation and phone covers point queries. Cabreúva-SP → Ouro Preto via BR-381 Rodovia Fernão Dias (497 km): a corridor with regular FB freight history, supporting indivisible loads and sets with escort when the gauge demands. For Ouro Preto, FB dispatch is preceded by: hydrostatic test at 1.5× design pressure, performance run with curve points, G2.5 dynamic balancing and Data Book closure — all traceable by serial number.
For projects with FBE pumps in Ouro Preto, talk to FB application engineering: viscosity analysis, available NPSH, seal materials and operating regime — technical response within 24-48 business hours.
Talk to engineeringFor over 82 years, we have manufactured industrial pumps in Cabreúva-SP. From north to south, we serve the country's main industrial hubs with gear (FBE/FBEI) and centrifugal (FBCN/FBOT) pumps — engineered, machined and assembled in our own manufacturing facility.
Our engineering team sizes each pump for the customer's actual application, with bench testing before shipping. This technical rigor — combined with direct support from our team — is what has sustained the trust of groups like Petrobras, Vale and CSN for generations.

What changes when the pump comes straight from the manufacturer: engineering, stock and logistics under one roof in Cabreúva-SP.
Technical support across all 27 Brazilian states, from inland regions to major industrial capitals.
Nationwide deliveries through partner carrier network with optimized lead times.
Technical team available for sizing, project work and after-sales support across any region.
Original spare parts for the FBE, FBEI, FBCN and FBOT series stocked at our own factory, ready to ship.
Own factory in Cabreúva/SP with full production capability, serving Ouro Preto and all of Brazil

Engineering, CNC machining and assembly — all integrated in our Cabreúva/SP factory.

We size and build complete systems, ready for installation at your industrial plant.

We keep original parts in stock for all series, ensuring continuity of your operation.

Production line with centrifugal and gear pumps assembled and tested in our manufacturing plant.
FB Bombas serves Ouro Preto and the entire Minas Gerais region with gear pumps (internal & external) and centrifugal pumps for your industrial application. Request a quote and receive a personalized proposal.
Request QuoteFour catalog series, fire-fighting systems and engineered-to-order — in-house manufacturing and hydrostatic testing on 100% of pumps
Our technical team is ready to develop the ideal solution for your application
Contact Us
Our manufacturing plant in Cabreúva-SP integrates engineering, CNC machining and assembly under one roof. Every pump is validated through bench testing before reaching the customer — ensuring it ships ready for real application.
Present in the largest industrial projects in Brazil and Latin America









See specific solutions for Ouro Preto
Brazilian sectors for which FB Bombas sizes equipment — complete technical guides per application.
Regional service from Ouro Preto — same series, same factory in Cabreúva/SP.
The FBCN series is recommended for mine water pumping, beneficiation plant feeding and auxiliary systems. Materials are selected according to water characteristics (abrasiveness, pH) and flows/pressures are sized by factory engineering based on project elevations and distances.
Yes. The process starts with FB Bombas' application engineering, which studies the installed pump's specifications — flow, pressure, viscosity, temperature — and indicates the dimensional or functional technical equivalence within our series. In Ouro Preto, many clients have already completed this swap and gained in lead time, cost and local support.
Yes. The FBE and FBCN lines were designed with easy access to wear-prone components, allowing disassembly and inspection with conventional tools. Detailed technical manuals and direct factory replacement parts availability simplify maintenance routines.
The FB portfolio handles an extensive spectrum of fluids. The FBE series takes mineral and synthetic oils, asphalt (CAP), BPF fuel oils, petroleum derivatives, molasses, resins plus viscous chemical and hydraulic products; the FBCN series works with raw and treated water, process fluids and industrial effluents; the FBOT series is dedicated to thermal oil at elevated temperatures. Each case is sized considering viscosity, temperature and chemical compatibility.
For water, condensate and low-viscosity fluids, the recommendation is the FBCN standardized centrifugal — 53 models with bench-tested curves and back-pull-out maintenance, which frees the rotating assembly without dismantling the piping. The exact model comes from the circuit’s flow × head pair.
Yes. The entire metropolitan region and the microregions around Ouro Preto receive from FB Bombas the same technical support and logistics structure. With this regional reach, industrial plants spread across several cities are served in a coordinated manner.
It is compatible when the dimension designation is the same. ASME B73.1 (North American dimensional standard for end-suction process pumps), adopted in the FBCN series, defines an envelope common to the whole normalized fleet operating in Ouro Preto plants, whoever manufactured the installed unit. In a typical retrofit, baseplate, suction/discharge piping and foundations are preserved, and FB Bombas supplies the complete new pump — not loose parts for third-party equipment. The dimensional and hydraulic gap analysis is executed by application engineering before supplying.
Yes. Since FB Bombas manufactures entirely in Cabreúva/SP, replacement parts for the FBE, FBEI, FBCN and FBOT series are available directly from the factory, with short lead times for scheduled stops and priority service for emergencies. This significantly reduces total cost of ownership.
Manufacturing in Brazil since 1944, FB Bombas delivers shorter lead times — with no import dependency —, direct technical support from FB engineering, in-house manufactured replacement parts, local-currency pricing free of exchange rate exposure, and on-site service for projects in Ouro Preto and surrounding areas.
It does. FB Bombas' retrofit service for existing installations encompasses updated seals, replaced worn components, adjustment to new fluids and improved hydraulic performance. To evaluate each case, the reference is the technical report on the current installation.
Fill out the form and our technical team will contact you to size the ideal pump — gear (FBE/FBEI) or centrifugal (FBCN/FBOT).