Technical summary
FBEI gear pumps (FB Bombas) in Pedro Canário, Espírito Santo: sized for local industry, viscous fluids up to 350°C, API 676 compliance and in-house manufacturing in Cabreúva-SP at 930 km. Typical critical-parts lead time: 72-96h.


FB Bombas serves Pedro Canário from its Cabreúva-SP factory, with transport via BR-262 (via BR-381 Fernão Dias até MG) and application-engineering support for dimensioning according to the actual operation profile. Pedro Canário sits 172 km from the pulp-and-paper cluster centered in Aracruz, a proximity that usually means shared suppliers and aligned maintenance standards. Industrial plants in Pedro Canário rely on FB Bombas spares held in scheduled stock: semi-open and open impellers, wear rings in various materials, dual cartridge seals API 682 Plan 53 and SKF/FAG bearings per the original spec. The BR-262 (via BR-381 Fernão Dias até MG) corridor combined with highways BR-262 and BR-101 composes the freight mesh to Pedro Canário — a cost variable in pricing skids, pump-motor sets and indivisible cargo with escort. For pumping projects in Pedro Canário, FB Bombas provides dedicated application engineering — pre-sizing against the actual system curve, material selection (AISI 316) and on-site commissioning support. In Pedro Canário, Espírito Santo, FB Bombas serves local industry projects with the FBE, FBCN, FBOT and FBEI series — dedicated application engineering for sizing against the actual system curve, CRCC Petrobras certification and technical compliance with ASME B73.1 (centrifugal), API 676 (gear) and NFPA 20 / NBR 16704 (fire fighting). FB Bombas maintains in Pedro Canário the technical portfolio of CRCC Petrobras + API 676 + ASME B73.1 (API 610 on engineered-to-order projects) — a regulatory base that spans refining, petrochemicals, mining, sanitation, pulp and paper, sugar-ethanol and steel. Typical fluids in Pedro Canário's industrial operations include óleos industriais and água industrial — a vector that determines whether the correct specification is the FBE/FBEI (gear) or FBCN/FBOT (centrifugal / thermal oil) series.
FB Bombas serves Pedro Canário from its Cabreúva-SP factory, with transport via BR-262 (via BR-381 Fernão Dias até MG) and application-engineering support for dimensioning according to the actual operation profile. Pedro Canário sits 172 km from the pulp-and-paper cluster centered in Aracruz, a proximity that usually means shared suppliers and aligned maintenance standards. Industrial plants in Pedro Canário rely on FB Bombas spares held in scheduled stock: semi-open and open impellers, wear rings in various materials, dual cartridge seals API 682 Plan 53 and SKF/FAG bearings per the original spec. The BR-262 (via BR-381 Fernão Dias até MG) corridor combined with highways BR-262 and BR-101 composes the freight mesh to Pedro Canário — a cost variable in pricing skids, pump-motor sets and indivisible cargo with escort. For pumping projects in Pedro Canário, FB Bombas provides dedicated application engineering — pre-sizing against the actual system curve, material selection (AISI 316) and on-site commissioning support. In Pedro Canário, Espírito Santo, FB Bombas serves local industry projects with the FBE, FBCN, FBOT and FBEI series — dedicated application engineering for sizing against the actual system curve, CRCC Petrobras certification and technical compliance with ASME B73.1 (centrifugal), API 676 (gear) and NFPA 20 / NBR 16704 (fire fighting). FB Bombas maintains in Pedro Canário the technical portfolio of CRCC Petrobras + API 676 + ASME B73.1 (API 610 on engineered-to-order projects) — a regulatory base that spans refining, petrochemicals, mining, sanitation, pulp and paper, sugar-ethanol and steel. Typical fluids in Pedro Canário's industrial operations include óleos industriais and água industrial — a vector that determines whether the correct specification is the FBE/FBEI (gear) or FBCN/FBOT (centrifugal / thermal oil) series.

Years
Compliant
Tested
Direct answer for industrial projects — recommended series, standards compliance and logistics.
FBEI gear pumps (FB Bombas) in Pedro Canário, Espírito Santo: sized for local industry, viscous fluids up to 350°C, API 676 compliance and in-house manufacturing in Cabreúva-SP at 930 km. Typical critical-parts lead time: 72-96h.
FB Bombas serves Pedro Canário from its Cabreúva-SP factory, with transport via BR-262 (via BR-381 Fernão Dias até MG) and application-engineering support for dimensioning according to the actual operation profile. Pedro Canário sits 172 km from the pulp-and-paper cluster centered in Aracruz, a proximity that usually means shared suppliers and aligned maintenance standards. Industrial plants in Pedro Canário rely on FB Bombas spares held in scheduled stock: semi-open and open impellers, wear rings in various materials, dual cartridge seals API 682 Plan 53 and SKF/FAG bearings per the original spec. The BR-262 (via BR-381 Fernão Dias até MG) corridor combined with highways BR-262 and BR-101 composes the freight mesh to Pedro Canário — a cost variable in pricing skids, pump-motor sets and indivisible cargo with escort. For pumping projects in Pedro Canário, FB Bombas provides dedicated application engineering — pre-sizing against the actual system curve, material selection (AISI 316) and on-site commissioning support. In Pedro Canário, Espírito Santo, FB Bombas serves local industry projects with the FBE, FBCN, FBOT and FBEI series — dedicated application engineering for sizing against the actual system curve, CRCC Petrobras certification and technical compliance with ASME B73.1 (centrifugal), API 676 (gear) and NFPA 20 / NBR 16704 (fire fighting). FB Bombas maintains in Pedro Canário the technical portfolio of CRCC Petrobras + API 676 + ASME B73.1 (API 610 on engineered-to-order projects) — a regulatory base that spans refining, petrochemicals, mining, sanitation, pulp and paper, sugar-ethanol and steel. Typical fluids in Pedro Canário's industrial operations include óleos industriais and água industrial — a vector that determines whether the correct specification is the FBE/FBEI (gear) or FBCN/FBOT (centrifugal / thermal oil) series.
100% of pumps bound for Pedro Canário pass through the Cabreúva-SP hydraulic bench — acceptance testing with multi-point curve readings and G2.5 dynamic balancing. FBEI and FBCN: this is the set of FB series with initial technical fit for Pedro Canário, respecting fluid characteristics and the regional operating regime. In Pedro Canário, transferência geral and utilidades form the typical-use portfolio — guiding series selection, sealing configuration and internal coating according to fluid abrasiveness or aggressiveness. For óleos industriais and água industrial in Pedro Canário, the baseline is austenitic stainless steels (AISI 304/316) with attention to thermal expansion — FB engineering tunes from immersion tests, field history and iron/stainless/duplex compatibility within the local fluid classes. What defines the FBE external gear pump in Pedro Canário is its behavior under variable pressure: being positive displacement, flow follows speed and practically ignores backpressure swings in the line — the typical case of óleos e água industrial. Two installation requirements follow from this physics: a sized relief valve on the discharge and, for fluids that harden when cold, a heating jacket on the pump body.
Pedro Canário: low fluid complexity, lean fluid roster — technical operation focused on few main vectors. Pedro Canário: medium density — regular and predictable opportunity pipeline — a variable influencing commercial strategy and service logistics. In Pedro Canário, value added is dominated by services (33.3%, IBGE 2021), with a 2023 GDP of R$ 545 million — a profile where pumping demand concentrates on building infrastructure, sanitation, HVAC and utilities, FBCN centrifugal territory. Pedro Canário: óleos industriais and água industrial. Each fluid defines a distinct set of pump requirements — flow, available NPSH, sealing strategy. The FBFS line serves Pedro Canário with fire-protection systems compliant with NFPA 20, NBR 16704 and NBR 10897, in electric, diesel and hybrid configurations. white/black liquor circulation, recovery-boiler feed and low-to-medium consistency stock pumping: this is the typical application set around the papel-celulose cluster in which Pedro Canário sits. For Pedro Canário, series FBEI for transferência geral and series FBCN for utilidades — initial reference for technical discussion with application engineering.
48-72h, with possible technical stop: this is the typical delivery interval Cabreúva-SP → Pedro Canário, based on a consolidated road route and FB-qualified logistics operators. BR-262 and BR-101 broaden FB's transport flexibility to Pedro Canário — useful in tight-window PM campaigns or for cargo whose gauge requires routes with specific bridges/curves. The BR-262 (via BR-381 Fernão Dias até MG) corridor (930 km) is the logistics spine for FB deliveries to Pedro Canário — a factor entering FOB pricing and the commissioning lead-time curve. The factory-to-Pedro Canário dispatch includes technical packaging (impact protection, moisture sealing), multilingual documentation (PT/EN/ES when required) and approved-carrier tracking.
For projects with FBE pumps in Pedro Canário, talk to FB application engineering: viscosity analysis, available NPSH, seal materials and operating regime — technical response within 24-48 business hours.
Talk to engineeringFor over 82 years, we have manufactured industrial pumps in Cabreúva-SP. From north to south, we serve the country's main industrial hubs with gear (FBE/FBEI) and centrifugal (FBCN/FBOT) pumps — engineered, machined and assembled in our own manufacturing facility.
Our engineering team sizes each pump for the customer's actual application, with bench testing before shipping. This technical rigor — combined with direct support from our team — is what has sustained the trust of groups like Petrobras, Vale and CSN for generations.

What changes when the pump comes straight from the manufacturer: engineering, stock and logistics under one roof in Cabreúva-SP.
Technical support across all 27 Brazilian states, from inland regions to major industrial capitals.
Nationwide deliveries through partner carrier network with optimized lead times.
Technical team available for sizing, project work and after-sales support across any region.
Original spare parts for the FBE, FBEI, FBCN and FBOT series stocked at our own factory, ready to ship.
Own factory in Cabreúva/SP with full production capability, serving Pedro Canário and all of Brazil

Engineering, CNC machining and assembly — all integrated in our Cabreúva/SP factory.

We size and build complete systems, ready for installation at your industrial plant.

We keep original parts in stock for all series, ensuring continuity of your operation.

Production line with centrifugal and gear pumps assembled and tested in our manufacturing plant.
FB Bombas serves Pedro Canário and the entire Espírito Santo region with gear pumps (internal & external) and centrifugal pumps for your industrial application. Request a quote and receive a personalized proposal.
Request QuoteFour catalog series, fire-fighting systems and engineered-to-order — in-house manufacturing and hydrostatic testing on 100% of pumps
Our technical team is ready to develop the ideal solution for your application
Contact Us
Our manufacturing plant in Cabreúva-SP integrates engineering, CNC machining and assembly under one roof. Every pump is validated through bench testing before reaching the customer — ensuring it ships ready for real application.
Present in the largest industrial projects in Brazil and Latin America









See specific solutions for Pedro Canário
Brazilian sectors for which FB Bombas sizes equipment — complete technical guides per application.
Regional service from Pedro Canário — same series, same factory in Cabreúva/SP.
Yes. Correct sizing is the main lever for energy efficiency — an oversized or undersized pump wastes energy. FB Bombas engineering calculates the optimal operating point considering the actual process conditions in Pedro Canário, optimizing the flow/pressure/power ratio.
It does. FB Bombas' retrofit service for existing installations encompasses updated seals, replaced worn components, adjustment to new fluids and improved hydraulic performance. To evaluate each case, the reference is the technical report on the current installation.
There are three channels: WhatsApp +55 11 97287-4837, email comercial@fbbombas.com.br and the form on our website. Technical questions get priority response within the same business day — the reply comes directly from application engineering.
Yes. Every FB Bombas pump delivered to Pedro Canário comes with a complete technical Data Book: hydraulic test certificate, material certificates (stainless, duplex, ductile cast iron per spec), ISO 21940 G2.5 balancing report, characteristic curve measured on the bench, API 682 mechanical-seal data sheets, operation and maintenance manual, and as-built drawings. All documentation is traceable by the unit serial number.
Yes. ASME B73.1 dimensional compliance — the North American standard for horizontal end-suction process centrifugal pumps — is a feature of the FBCN series and enables retrofit on existing baseplates in Pedro Canário plants, regardless of which brand occupied the base, provided the designation coincides. Shaft, suction/discharge flanges, casing feet and impeller centerline obey the standard, so the new pump takes the position without touching piping or baseplate.
It is compatible when the dimension designation is the same. ASME B73.1 (North American dimensional standard for end-suction process pumps), adopted in the FBCN series, defines an envelope common to the whole normalized fleet operating in Pedro Canário plants, whoever manufactured the installed unit. In a typical retrofit, baseplate, suction/discharge piping and foundations are preserved, and FB Bombas supplies the complete new pump — not loose parts for third-party equipment. The dimensional and hydraulic gap analysis is executed by application engineering before supplying.
Application engineering starts from four variables — flow, differential pressure, temperature and viscosity — and refines with available NPSH, duty cycle and chemical compatibility. The study is free for customers in Pedro Canário and results in the exact model recommendation, not a generic family.
It offers both. The FAT (Factory Acceptance Test) takes place on the Cabreúva/SP bench and covers hydraulic testing, characteristic-curve measurement (Q × H), hydraulic efficiency, NPSHr and ISO 10816 vibration; when the customer specifies, inspection witnesses the tests. In the SAT (Site Acceptance Test) of Pedro Canário projects, application engineering supports commissioning with startup checklist, laser alignment and capture of the baseline vibration signature.
Who serves Pedro Canário is the FB Bombas factory team itself in Cabreúva/SP. In practice: direct access to application engineering for sizing, a complete technical quotation returned within 3-5 business days and original parts supplied at factory pricing. Depending on project criticality, on-site technical visits to Pedro Canário are added to the plan.
Yes. The entire metropolitan region and the microregions around Pedro Canário receive from FB Bombas the same technical support and logistics structure. With this regional reach, industrial plants spread across several cities are served in a coordinated manner.
Fill out the form and our technical team will contact you to size the ideal pump — gear (FBE/FBEI) or centrifugal (FBCN/FBOT).