I have a series or model
Review the equipment, dimensions and family documentation. For replacement, also provide the identification of your existing pump.
View the catalog
Direct service from our factory in Cabreúva, Brazil. Explore FB Bombas series and tell us what your operation needs to transfer or circulate.
Do you already know the pump or need help defining it? Choose the next step for your industrial project.
Review the equipment, dimensions and family documentation. For replacement, also provide the identification of your existing pump.
View the catalogTell us which fluid you need to transfer or circulate and how the pump will be used. You can start the conversation without all the technical details.
Describe my applicationSelection depends on the fluid and operating conditions. Location identifies the project and delivery destination.

External gear pumps for viscous fluid transfer. Check size-specific limits and availability with our sales team.
Explore models
Internal gear pumps for viscous fluid transfer. Review the configuration, materials and series documentation.
Explore modelsApplication context and points to confirm during technical and commercial review.
For projects in Guarapari, Espírito Santo, FB Bombas provides service from its factory in Cabreúva, Brazil. FBE external gear pumps and FBEI internal gear pumps have their own documentation and operating conditions. Provide the fluid, viscosity at operating temperature and any known flow and pressure data. The team reviews the appropriate configuration.
Identify the fluid by its trade name and available composition. Add viscosity at operating temperature, solids content and startup conditions. These data allow materials and sealing to be assessed before the configuration is confirmed.
If the project involves plants in different municipalities, list destinations, equipment and technical requirements by facility. The proposal can then describe each supply scope and its transport and service conditions.
State whether the requirement is an expansion, new installation or equipment replacement. For replacement, pump identification and its dimensional drawing help check the duty point and existing interfaces.
For gear pumps in Guarapari, review FBE external gear pumps and FBEI internal gear pumps separately. Their models, drives and limits are not interchangeable; provide viscosity at startup and operating temperatures to assess the configuration.
In the request for Guarapari, describe the fluid source and destination, operating duty and installation constraints. If a pump is already in use, its model and identification complement process data; they do not replace checking current conditions.
Support for Guarapari starts through the factory channels in Cabreúva, Brazil. Have the equipment identification and a description of operating conditions ready to support maintenance, spare-parts or replacement review.
For economic context, IBGE records GDP of R$ 3.4 billion for Guarapari in 2023. In the 2021 gross value added breakdown, industry accounts for approximately 12.7% and agriculture for approximately 3%. Reference years differ because the 2022–2023 publication does not include a sector breakdown. These data describe the municipality; pumping requirements need to be specified for your plant’s process.
For fluids with varying properties in the process in Guarapari, provide composition, temperature and viscosity ranges plus startup and cleaning conditions. Identify each product that will pass through the assembly to guide the review of materials, sealing and drive.
If the operation in Guarapari uses different fluids, record composition, viscosity, temperature and solids content separately for each circuit. Compatibility with one product does not establish that the pump will serve every other plant process.
To describe the industrial application in Guarapari, identify the process stage and whether the pump will transfer, circulate or feed another item of equipment. The same plant may have circuits with different fluid, flow, pressure and duty requirements.
Source: IBGE — Municipal GDP and methodologyAbout 735 km in a straight line between the factory in Cabreúva, São Paulo, and the geographic center of the municipality (IBGE centroid). It is not a road route, freight cost or lead time.
Haversine formula, treating the Earth as a sphere with a radius of 6,371 km, between the factory’s reference coordinates (Av. Adolpho João Traldi, 80 - Jacaré, Cabreúva-SP) and the municipal centroid published by IBGE in its Geographic Mesh API, retrieved on September 24, 2026. The centroid is a reference point of the municipal territory, not the municipal seat or the delivery location. The result is rounded to multiples of 5 km; below 20 km, only “less than 20 km” is shown.
IBGE Mesh API documentationThe schedule for Guarapari should distinguish equipment availability, preparation for dispatch and transport. The proposal confirms dates and responsibilities for each stage according to the requested configuration.
Before dispatch to Guarapari, confirm the approved configuration, contracted documentation and delivery details with the sales team.
To review the FBE / FBEI families for the project in Guarapari, send the fluid and any known flow, pressure or head and temperature data. For replacement, add the installed pump’s identification and drawing. The team confirms the configuration and proposal scope.
Review process criteria and prepare the information for equipment selection.
FBE and FBEI selection for transferring CAP, bitumen, pitch and asphalt emulsions: product data, speed by viscosity, heating (chamber or jacket), start-up, materials and assembly documentation.
View applicationPump selection for B100 biodiesel production from vegetable oils and animal fats: reactor feed, methanol and catalyst, glycerin, washing, methanol recovery and storage — with material, sealing and motor criteria according to the project area classification.
View applicationFB Bombas technical guide to selecting liquid fuel transfer pumps — S10/S500 diesel, gasoline, ethanol, kerosene and jet fuel (JET-A1), heavy fuel oil and bunker — with the FBE (external gear) and FBCN (standardized centrifugal) series: viscosity, NPSH, overpressure protection, sealing and the installation standards (ABNT NBR IEC 60079, ABNT NBR 17505, NR-20 and NR-10), which are project requirements, not pump certifications.
View applicationJuice, mud, syrup, molasses, massecuite, must, wine, vinasse and ethanol: the data to measure at each point, the documented materials of the FBCN, FBE, FBEI and FBOT series and the NPSH, sealing and hazardous-area limits that decide the selection.
View applicationShare what you already know. Additional details can be clarified with the team during review.
What needs to be pumped, where it comes from and where it needs to go.
Flow, pressure or head, temperature and operating schedule, when known.
Series, model, identification and space or connection constraints, if a pump is already installed.
Project location, requested scope and documents required for your purchase.

FB Bombas is a Brazilian manufacturer with a history dating back to 1944. Our factory in Cabreúva, São Paulo, brings together CNC machining, assembly and a hydraulic test bench. The team reviews your application and confirms the configuration, documents and supply conditions in the proposal.
About FB BombasUse the family documentation and application guides to prepare your request.
Installation, operation and maintenance by series, with the document language identified.
Understand the process information needed to specify the equipment.
View applicationsSee the other pages for this city and for other cities. Service is provided by the factory in Cabreúva, Brazil.
Information to help you prepare your inquiry to FB Bombas.
It depends on the series, as set out in each manual: 10 kgf/cm² for the FBE (MTEC-01/01, Table 5), 1.5 times the operating pressure for the FBOT (MTEC-16/00), 1.5 times the working pressure for the FBME (MTEC-08/01) and per ANSI B73.1 for the FBCN (MTEC-03/00). The test is performed on the factory bench in Cabreúva, Brazil; certificates, additional tests and customer witnessing are defined in the proposal for supply to Guarapari.
Send the application in Guarapari, fluid, temperature and available flow, pressure or head data. For replacement, add the equipment model, identification and drawing. Also state the destination and purchase documentation requirements. The team confirms any additional data needed and the technical and commercial proposal scope.
Yes, for FB product lines. The FBE catalogue lists replacement components such as shafts, gears, bushing sets, covers, mechanical seal, lip seal and relief valve, and the FBEI and FBME manuals include spare-parts lists for two years of operation. For delivery to Guarapari, state the series, model, manufacturing number and component; compatibility, availability and lead time are confirmed in the quotation. Supply ships from the factory in Cabreúva, Brazil; the city page does not indicate local stock. Use original parts: the FBME service manual makes the operating and performance warranty conditional on original parts and FB’s consent.
It depends on the series. The published limits are up to 260 °C for the FBCN, 350 °C for the FBOT, 340 °C for the FBEI and 140 °C for the FBME. For the FBE, the 2026 catalogue gives a range of 10 °C to 500 °C; the limit of each configuration depends on materials and sealing. These are series limits: they do not automatically apply to every model, nor do they necessarily occur together with the other maximums. State the start-up, operating and cleaning temperatures of the process in Guarapari.
Use WhatsApp +55 11 97287-4837, telephone +55 11 4898-9200, comercial@fbbombas.com.br or the website form. To help the team, describe the application, project destination and any pump data already available.
Yes, once equivalence has been confirmed. FB Bombas replaces the installed pump with a complete FB pump and, before the order, assesses the installation and sends a data sheet and dimensional drawing. For the installation in Guarapari, send the identification and drawing of the current pump, with its duty point, fluid, materials and drive; origin or a similar designation does not guarantee direct replacement.
FB Bombas began manufacturing industrial pumps in 1944. Its current factory is in Cabreúva, Brazil. The Our History page presents the company’s development; each series’ technical documentation supports equipment evaluation for your project in Guarapari.
Lead time to Guarapari depends on the model, configuration and transport. Several FBE models are kept in stock; availability and expected dispatch for each item are confirmed in the quotation. State the destination and the date you need so that the proposal also defines freight and delivery responsibilities.
Following the BNDES steps, first check whether the equipment appears on the list of items eligible for BNDES Finame financing, in the CFI Catalog on the bank’s website; for that check, ask the sales team for the identification of the model quoted for Guarapari. Then apply for financing through an accredited financial agent, such as a commercial bank, development bank, development agency or credit union. The agent reviews the request and, if it approves the operation, forwards it to BNDES, which evaluates the request and authorizes the financing. Being a Brazilian manufacturer does not, on its own, show that the equipment is accredited.
It depends on the series. Installation and operation instructions are in FBEI manual MAN001-10 and in FBME service manual MSERV-08/01, which also covers maintenance and recommends FB-authorized supervision during installation. The FBE (MTEC-01/01), FBCN (MTEC-03/00) and FBOT (MTEC-16/00) technical manuals provide technical data, sectional drawings, parts lists and dimensions; for installing and maintaining these series, the published services include on-site start-up and commissioning and maintenance contracts. The manuals are on the website’s technical manuals page (PDFs in Portuguese), and MSERV-08/01 is on the FBME series page. For the operation in Guarapari, identify the series and model from the pump’s nameplate.
Send your application to our factory team. You do not need every parameter defined to start the conversation.
The team reviews the information and confirms the details needed for a proposal. Configuration, availability, documentation, transport and lead time depend on the requested scope.
Describe the fluid, application and project destination. Include the model and technical data you already have.