Technical summary
FBEI gear pumps (FB Bombas) in Varzedo, Bahia: sized for local industry, viscous fluids up to 350°C, API 676 compliance and in-house manufacturing in Cabreúva-SP at 1410 km. Typical critical-parts lead time: 72-96h.


Varzedo requires pumping of óleos industriais and água industrial, a fluid set for which FB Bombas already has product series with field-validated material selection. FB Bombas pumps installed in Varzedo, Bahia meet CRCC Petrobras certification, API 610 (centrifugal) and API 676 (gear) compliance — credentials FB has sustained as a Brazilian manufacturer since 1944. FB Bombas application engineering serves Varzedo with custom technical sizing: system characteristic curve, available NPSH, in-service viscosity and mechanical-seal strategy (API Plan 11, 13, 52 or 53 by criticality). Varzedo sits 87 km from the refining cluster centered in Sao Francisco Do Conde, a proximity that usually means shared suppliers and aligned maintenance standards. In Varzedo, Bahia, FB Bombas serves local industry projects with the FBE, FBCN, FBOT and FBEI series — dedicated application engineering for sizing against the actual system curve, CRCC Petrobras certification and technical compliance with API 610 (centrifugal), API 676 (gear) and NFPA 20 / NBR 16704 (fire fighting). Road access runs via BR-116 (via Fernão Dias BR-381 até MG), with branches through BR-116, BR-101 and BR-324 — a corridor that sets delivery times for rotating equipment and the logistics of technical service. Cabreúva-SP → Varzedo (1410 km via BR-116 (via Fernão Dias BR-381 até MG)): origin of FB manufacturing since 1944, with vertical integration on a single site — CNC machining, assembly hydraulic bench and ISO 21940 G2.5 balancing — every unit ships with a traceable Data Book.
Varzedo requires pumping of óleos industriais and água industrial, a fluid set for which FB Bombas already has product series with field-validated material selection. FB Bombas pumps installed in Varzedo, Bahia meet CRCC Petrobras certification, API 610 (centrifugal) and API 676 (gear) compliance — credentials FB has sustained as a Brazilian manufacturer since 1944. FB Bombas application engineering serves Varzedo with custom technical sizing: system characteristic curve, available NPSH, in-service viscosity and mechanical-seal strategy (API Plan 11, 13, 52 or 53 by criticality). Varzedo sits 87 km from the refining cluster centered in Sao Francisco Do Conde, a proximity that usually means shared suppliers and aligned maintenance standards. In Varzedo, Bahia, FB Bombas serves local industry projects with the FBE, FBCN, FBOT and FBEI series — dedicated application engineering for sizing against the actual system curve, CRCC Petrobras certification and technical compliance with API 610 (centrifugal), API 676 (gear) and NFPA 20 / NBR 16704 (fire fighting). Road access runs via BR-116 (via Fernão Dias BR-381 até MG), with branches through BR-116, BR-101 and BR-324 — a corridor that sets delivery times for rotating equipment and the logistics of technical service. Cabreúva-SP → Varzedo (1410 km via BR-116 (via Fernão Dias BR-381 até MG)): origin of FB manufacturing since 1944, with vertical integration on a single site — CNC machining, assembly hydraulic bench and ISO 21940 G2.5 balancing — every unit ships with a traceable Data Book.

Years
Certified
Warranty
Direct answer for industrial projects — recommended series, standards compliance and logistics.
FBEI gear pumps (FB Bombas) in Varzedo, Bahia: sized for local industry, viscous fluids up to 350°C, API 676 compliance and in-house manufacturing in Cabreúva-SP at 1410 km. Typical critical-parts lead time: 72-96h.
Varzedo requires pumping of óleos industriais and água industrial, a fluid set for which FB Bombas already has product series with field-validated material selection. FB Bombas pumps installed in Varzedo, Bahia meet CRCC Petrobras certification, API 610 (centrifugal) and API 676 (gear) compliance — credentials FB has sustained as a Brazilian manufacturer since 1944. FB Bombas application engineering serves Varzedo with custom technical sizing: system characteristic curve, available NPSH, in-service viscosity and mechanical-seal strategy (API Plan 11, 13, 52 or 53 by criticality). Varzedo sits 87 km from the refining cluster centered in Sao Francisco Do Conde, a proximity that usually means shared suppliers and aligned maintenance standards. In Varzedo, Bahia, FB Bombas serves local industry projects with the FBE, FBCN, FBOT and FBEI series — dedicated application engineering for sizing against the actual system curve, CRCC Petrobras certification and technical compliance with API 610 (centrifugal), API 676 (gear) and NFPA 20 / NBR 16704 (fire fighting). Road access runs via BR-116 (via Fernão Dias BR-381 até MG), with branches through BR-116, BR-101 and BR-324 — a corridor that sets delivery times for rotating equipment and the logistics of technical service. Cabreúva-SP → Varzedo (1410 km via BR-116 (via Fernão Dias BR-381 até MG)): origin of FB manufacturing since 1944, with vertical integration on a single site — CNC machining, assembly hydraulic bench and ISO 21940 G2.5 balancing — every unit ships with a traceable Data Book.
Typical applications mapped for Varzedo include transferência geral and utilidades — each with its own requirements for NPSH, acceptable pulsation and start-up strategy. In Varzedo, influence from the refino cluster translates into crude oil, derivatives, high temperature (up to 260°C in FBCN, 350°C in FBOT) and API 610 qualification — variables that enter both preliminary sizing and the selection of materials and constructive configurations. For the technical profile observed in Varzedo, FB Bombas application engineering recommends FBEI and FBCN as a starting point for sizing, subject to refinement per Q×H curve, available NPSH and actual fluid temperature. For Varzedo, the FB protocol includes hydrostatic test at 1.5× design pressure, performance run and ISO 21940 G2.5 balancing — all documented in the Data Book.
The low fluid-complexity profile in Varzedo (lean fluid roster — technical operation focused on few main vectors) shapes FB's technical strategy: standardization versus case-by-case customization. refino cluster near Varzedo imposes a scheduled outages every 3-5 years (turnaround) — synchronized demand peaks across the supply chain pace — syncing equipment purchases, PM contracting and regional technical-team mobilization. Varzedo shows a low industrial density — typically standalone projects, without regional cumulative volume pattern, a structural factor that modulates predictability of recurring revenue and the viable contract type (spot, annual, multi-year). Varzedo: óleos industriais and água industrial. Each fluid defines a distinct set of pump requirements — flow, available NPSH, sealing strategy. crude transfer, distillation-tower circulation, charge pumps for reactors and movement of derivatives: this is the typical application set around the refino cluster in which Varzedo sits. For Varzedo, series FBEI for transferência geral and series FBCN for utilidades — initial reference for technical discussion with application engineering.
Typical transit time to Varzedo: 48-72h, with possible technical stop — the window used in FB Bombas' standard commercial commitment. The main logistics axis between Cabreúva-SP and Varzedo is BR-116 (via Fernão Dias BR-381 até MG), totaling 1410 km — a route that sets the default delivery time for finished equipment. Dispatch from the Cabreúva-SP factory to Varzedo occurs after bench hydraulic testing and Data Book verification — mandatory steps in FB's quality control.
FB engineers serve Varzedo for the FBE series with a sized proposal — duty point, fluid, field conditions and supply lead time.
Talk to engineeringFor over 82 years, we have manufactured industrial pumps in Cabreúva-SP. From north to south, we serve the country's main industrial hubs with gear (FBE/FBEI) and centrifugal (FBCN/FBOT) pumps — engineered, machined and assembled in our own manufacturing facility.
Our engineering team sizes each pump for the customer's actual application, with bench testing before shipping. This technical rigor — combined with direct support from our team — is what has sustained the trust of groups like Petrobras, Vale and CSN for generations.

Four differentiators that make FB Bombas the choice of leading Brazilian industries.
Technical support across all 27 Brazilian states, from inland regions to major industrial capitals.
Nationwide deliveries through partner carrier network with optimized lead times.
Technical team available for sizing, project work and after-sales support across any region.
Original parts in stock for all series, ensuring operational continuity with zero downtime.
Own factory in Cabreúva/SP with full production capability, serving Varzedo and all of Brazil

Engineering, CNC machining and assembly — all integrated in our Cabreúva/SP factory.

We size and build complete systems, ready for installation at your industrial plant.

We keep original parts in stock for all series, ensuring continuity of your operation.

Production line with centrifugal and gear pumps assembled and tested in our manufacturing plant.
FB Bombas serves Varzedo and the entire Bahia region with gear pumps (internal & external) and centrifugal pumps for your industrial application. Request a quote and receive a personalized proposal.
Request QuoteSoluções completas em bombeamento industrial com tecnologia de ponta
Our technical team is ready to develop the ideal solution for your application
Fale Conosco
Our manufacturing plant in Cabreúva-SP integrates engineering, CNC machining and assembly under one roof. Every pump is validated through bench testing before reaching the customer — ensuring it ships ready for real application.
Present in the largest industrial projects in Brazil and Latin America
See specific solutions for Varzedo
Brazilian sectors for which FB Bombas sizes equipment — complete technical guides per application.
Regional service from Varzedo — same series, same factory in Cabreúva/SP.
FB Bombas has been manufacturing industrial pumps since 1944, with over 82 years of continuous experience. The factory in Cabreúva/SP operates with engineering, manufacturing and testing under one roof, ensuring total quality control on every unit supplied to Varzedo and all of Brazil.
The FB Bombas rotating set is balanced per ISO 21940 G2.5 (a balancing grade equivalent to API 610 requirements for heavy-duty service) — required for critical projects in Varzedo with continuous regime, plants with online vibration monitoring or applications with high cost of unplanned downtime. For machines running above 3,600 RPM or with rotating mass over 50 kg, balancing is performed on two planes with a piezoelectric sensor.
Yes. FB Bombas application engineering supports ISO 10816 vibration analysis (velocity RMS in mm/s) for diagnosing misalignment, imbalance, bearing defects and cavitation on pumps installed in Varzedo. The service includes baseline capture at startup, spectral comparison during PM campaigns, and intervention recommendations (re-balancing, bearing replacement, laser alignment) before vibration exceeds the standard’s zone D.
Shorter delivery times (no import dependency), direct technical support from FB engineering, replacement parts with in-house manufacturing, prices in local currency (no exchange rate exposure) and on-site service for projects in Varzedo and surrounding areas. FB Bombas has been manufacturing in Brazil since 1944.
Yes. FB Bombas manufactures pumps for stationary fire protection systems in compliance with NFPA (National Fire Protection Association) and ABNT NBR 16704 standards, serving building and industrial projects that require these certifications.
Service to Varzedo is handled directly by the FB Bombas team at the Cabreúva/SP factory — no intermediaries, no resellers. That means direct contact with application engineering for sizing, technical quotes returned within 24h and original spare parts supplied without distributor markup. On-site technical visits to Varzedo are planned based on project criticality.
Maximum temperature depends on the series: FBE and FBEI operate up to 350°C with heating jacket and special sealing; FBOT operates up to 350°C in thermal oil circuits; FBCN operates up to 250°C with proper materials and sealing. Correct sizing of sealing and materials is essential for safe operation.
Yes. The FAT (Factory Acceptance Test) is executed on the factory bench in Cabreúva/SP, with hydraulic test, characteristic-curve measurement (Q × H), hydraulic efficiency, NPSHr and ISO 10816 vibration — witnessed by customer inspection when specified. For projects in Varzedo, the SAT (Site Acceptance Test) is supported by application engineering during commissioning, with startup checklist, laser alignment and baseline vibration-signature capture.
Yes. Correct sizing is the main lever for energy efficiency — an oversized or undersized pump wastes energy. FB Bombas engineering calculates the optimal operating point considering the actual process conditions in Varzedo, optimizing the flow/pressure/power ratio.
Yes. The FBCN series complies with ASME B73.1 (North American standard for horizontal end-suction process centrifugal pumps) — a feature that enables dimensional retrofit on existing baseplates in Varzedo plants originally equipped with KSB, Sulzer, Goulds or Flowserve. Shaft dimensions, suction/discharge flanges, casing feet and impeller centerline follow the standard; the rotating set is swapped without changing piping or baseplate.
Fill out the form and our technical team will contact you to size the ideal pump — gear (FBE/FBEI) or centrifugal (FBCN/FBOT).