I have a series or model
Review the equipment, dimensions and family documentation. For replacement, also provide the identification of your existing pump.
View the catalog
Direct service from our factory in Cabreúva, Brazil. Explore FB Bombas series and tell us what your operation needs to transfer or circulate.
Do you already know the pump or need help defining it? Choose the next step for your industrial project.
Review the equipment, dimensions and family documentation. For replacement, also provide the identification of your existing pump.
View the catalogTell us which fluid you need to transfer or circulate and how the pump will be used. You can start the conversation without all the technical details.
Describe my applicationSelection depends on the fluid and operating conditions. Location identifies the project and delivery destination.

External gear pumps for viscous fluid transfer. Check size-specific limits and availability with our sales team.
Explore models
Internal gear pumps for viscous fluid transfer. Review the configuration, materials and series documentation.
Explore modelsApplication context and points to confirm during technical and commercial review.
For projects in Boquira, Bahia, FB Bombas provides service from its factory in Cabreúva, Brazil. FBE external gear pumps and FBEI internal gear pumps have their own documentation and operating conditions. Provide the fluid, viscosity at operating temperature and any known flow and pressure data. The team reviews the appropriate configuration.
Identify the fluid by its trade name and available composition. Add viscosity at operating temperature, solids content and startup conditions. These data allow materials and sealing to be assessed before the configuration is confirmed.
If the project involves plants in different municipalities, list destinations, equipment and technical requirements by facility. The proposal can then describe each supply scope and its transport and service conditions.
State whether the requirement is an expansion, new installation or equipment replacement. For replacement, pump identification and its dimensional drawing help check the duty point and existing interfaces.
For gear pumps in Boquira, review FBE external gear pumps and FBEI internal gear pumps separately. Their models, drives and limits are not interchangeable; provide viscosity at startup and operating temperatures to assess the configuration.
The project location in Boquira does not determine the pump series. Compare families by fluid and process, then confirm selection using flow, pressure or head, temperature, viscosity and installation conditions.
If the project in Boquira requires testing or witnessed inspection, specify test points, acceptance criteria and required reports in the purchase requirements. The team confirms capability and scope before supply, according to the series and configuration.
For economic context, IBGE records GDP of R$ 221 million for Boquira in 2023. In the 2021 gross value added breakdown, industry accounts for approximately 7.2% and agriculture for approximately 10.1%. Reference years differ because the 2022–2023 publication does not include a sector breakdown. These data describe the municipality; pumping requirements need to be specified for your plant’s process.
For fluids with varying properties in the process in Boquira, provide composition, temperature and viscosity ranges plus startup and cleaning conditions. Identify each product that will pass through the assembly to guide the review of materials, sealing and drive.
If the operation in Boquira uses different fluids, record composition, viscosity, temperature and solids content separately for each circuit. Compatibility with one product does not establish that the pump will serve every other plant process.
To describe the industrial application in Boquira, identify the process stage and whether the pump will transfer, circulate or feed another item of equipment. The same plant may have circuits with different fluid, flow, pressure and duty requirements.
Source: IBGE — Municipal GDP and methodologyAbout 1,255 km in a straight line between the factory in Cabreúva, São Paulo, and the geographic center of the municipality (IBGE centroid). It is not a road route, freight cost or lead time.
Haversine formula, treating the Earth as a sphere with a radius of 6,371 km, between the factory’s reference coordinates (Av. Adolpho João Traldi, 80 - Jacaré, Cabreúva-SP) and the municipal centroid published by IBGE in its Geographic Mesh API, retrieved on September 24, 2026. The centroid is a reference point of the municipal territory, not the municipal seat or the delivery location. The result is rounded to multiples of 5 km; below 20 km, only “less than 20 km” is shown.
IBGE Mesh API documentationThe schedule for Boquira should distinguish equipment availability, preparation for dispatch and transport. The proposal confirms dates and responsibilities for each stage according to the requested configuration.
Before dispatch to Boquira, confirm the approved configuration, contracted documentation and delivery details with the sales team.
To review the FBE / FBEI families for the project in Boquira, send the fluid and any known flow, pressure or head and temperature data. For replacement, add the installed pump’s identification and drawing. The team confirms the configuration and proposal scope.
Review process criteria and prepare the information for equipment selection.
FBE and FBEI selection for transferring CAP, bitumen, pitch and asphalt emulsions: product data, speed by viscosity, heating (chamber or jacket), start-up, materials and assembly documentation.
View applicationPump selection for B100 biodiesel production from vegetable oils and animal fats: reactor feed, methanol and catalyst, glycerin, washing, methanol recovery and storage — with material, sealing and motor criteria according to the project area classification.
View applicationFB Bombas technical guide to selecting liquid fuel transfer pumps — S10/S500 diesel, gasoline, ethanol, kerosene and jet fuel (JET-A1), heavy fuel oil and bunker — with the FBE (external gear) and FBCN (standardized centrifugal) series: viscosity, NPSH, overpressure protection, sealing and the installation standards (ABNT NBR IEC 60079, ABNT NBR 17505, NR-20 and NR-10), which are project requirements, not pump certifications.
View applicationJuice, mud, syrup, molasses, massecuite, must, wine, vinasse and ethanol: the data to measure at each point, the documented materials of the FBCN, FBE, FBEI and FBOT series and the NPSH, sealing and hazardous-area limits that decide the selection.
View applicationShare what you already know. Additional details can be clarified with the team during review.
What needs to be pumped, where it comes from and where it needs to go.
Flow, pressure or head, temperature and operating schedule, when known.
Series, model, identification and space or connection constraints, if a pump is already installed.
Project location, requested scope and documents required for your purchase.

FB Bombas is a Brazilian manufacturer with a history dating back to 1944. Our factory in Cabreúva, São Paulo, brings together CNC machining, assembly and a hydraulic test bench. The team reviews your application and confirms the configuration, documents and supply conditions in the proposal.
About FB BombasUse the family documentation and application guides to prepare your request.
Installation, operation and maintenance by series, with the document language identified.
Understand the process information needed to specify the equipment.
View applicationsSee the other pages for this city and for other cities. Service is provided by the factory in Cabreúva, Brazil.
Information to help you prepare your inquiry to FB Bombas.
Send the series and model of the pump installed in Boquira, the operating conditions and the available vibration records; the standard, measurement points and limits are defined for the assembly, with no single limit for every pump. Check the alignment first: the FBEI (MAN001-10) and FBME (MSERV-08/01) manuals identify pump-to-motor misalignment as a source of vibration and premature wear and call for realignment after final installation, because transport usually misaligns the set, which leaves the factory pre-aligned; the stated tolerance is under 0.05 mm radial and 0.6° angular, according to the coupling supplier.
The published grade is for the FBME: service manual MSERV-08/01 (item 12.2) specifies static and dynamic impeller balancing to grade G6.3. The manuals of the other series do not publish a grade; for them and for critical projects in Boquira, specify the required standard, grade and report in the purchase scope. Impeller balancing alone does not guarantee the vibration level of the installation.
The catalogue includes FBE external gear, FBEI internal gear, FBCN standardized centrifugal, FBME multistage centrifugal and FBOT thermal oil pumps, fire systems and custom solutions. Review each family’s documentation; configuration and availability are confirmed in the quotation.
When the Data Book is part of the purchase scope. State which drawings, manuals, certificates and test reports are required for Boquira; the proposal confirms the documents applicable to the supplied series and configuration. The same Data Book is not assumed for every pump.
By replacement, not refurbishment. FB Bombas replaces the old pump with a new, complete FB pump manufactured in Cabreúva, Brazil. Before the order, engineering assesses the installation and issues a data sheet and dimensional drawing; the drawing confirms whether the existing baseplate and piping can be kept or need adaptation. FB does not refurbish other manufacturers’ pumps, sell third-party parts or reuse the installed casing. For FB pumps in service, it supplies original parts and maintenance contracts.
FB Bombas began manufacturing industrial pumps in 1944. Its current factory is in Cabreúva, Brazil. The Our History page presents the company’s development; each series’ technical documentation supports equipment evaluation for your project in Boquira.
Yes, for FB product lines. The FBE catalogue lists replacement components such as shafts, gears, bushing sets, covers, mechanical seal, lip seal and relief valve, and the FBEI and FBME manuals include spare-parts lists for two years of operation. For delivery to Boquira, state the series, model, manufacturing number and component; compatibility, availability and lead time are confirmed in the quotation. Supply ships from the factory in Cabreúva, Brazil; the city page does not indicate local stock. Use original parts: the FBME service manual makes the operating and performance warranty conditional on original parts and FB’s consent.
It depends on the series. The catalogue for the FBE external gear pump lists oils in general, greases, asphalt, diesel oil, kerosene, paints, varnishes, resins and solvents, as well as lubrication systems and hydraulic equipment. The FBEI internal gear pump is intended for high-viscosity liquids. The FBCN and FBME handle clean or turbid liquids, and the FBOT handles organic thermal oils free of abrasive particles and of substances that chemically attack the pump. For the process in Boquira, state the composition, temperature, viscosity and solids content; fluids with suspended solids must be assessed by FB engineering.
FB Bombas supplies the complete FBCN and checks, model by model, the dimensions in manual MTEC-03/00 (baseplate, nozzles, flanges and shaft) and the duty point before the order. The manual states mechanical construction per ASME B73.1; dimensional interchangeability with the existing pump is not assumed and is confirmed on the drawing. Send the identification and drawing of the pump installed in Boquira, with flow, head, fluid, materials and drive.
Yes, in the five Custom Solutions categories: custom complete motor-pump assembly, mobile industrial kit, industrial pump skid, retrofit with a new FB pump in place of the installed one, and special materials projects. The scope of each project is defined with engineering before manufacture in Cabreúva, Brazil.
Send your application to our factory team. You do not need every parameter defined to start the conversation.
The team reviews the information and confirms the details needed for a proposal. Configuration, availability, documentation, transport and lead time depend on the requested scope.
Describe the fluid, application and project destination. Include the model and technical data you already have.