Skip to main content

Gear pumps for projects in Uarini, Amazonas

Direct service from our factory in Cabreúva, Brazil. Explore FB Bombas series and tell us what your operation needs to transfer or circulate.

Start with your requirements

Do you already know the pump or need help defining it? Choose the next step for your industrial project.

Information for your project

Application context and points to confirm during technical and commercial review.

Initial guidance

For projects in Uarini, Amazonas, FB Bombas provides service from its factory in Cabreúva, Brazil. FBE external gear pumps and FBEI internal gear pumps have their own documentation and operating conditions. Provide the fluid, viscosity at operating temperature and any known flow and pressure data. The team reviews the appropriate configuration.

Industrial context

Identify the fluid by its trade name and available composition. Add viscosity at operating temperature, solids content and startup conditions. These data allow materials and sealing to be assessed before the configuration is confirmed.

For industrial projects in Uarini, FB Bombas provides direct service from its factory in Cabreúva, Brazil. A pump manufacturer since 1944, the company reviews the process, fluid and installation conditions with your team to define the equipment.

State whether the requirement is an expansion, new installation or equipment replacement. For replacement, pump identification and its dimensional drawing help check the duty point and existing interfaces.

Technical criteria

For gear pumps in Uarini, review FBE external gear pumps and FBEI internal gear pumps separately. Their models, drives and limits are not interchangeable; provide viscosity at startup and operating temperatures to assess the configuration.

The project location in Uarini does not determine the pump series. Compare families by fluid and process, then confirm selection using flow, pressure or head, temperature, viscosity and installation conditions.

If the project in Uarini requires testing or witnessed inspection, specify test points, acceptance criteria and required reports in the purchase requirements. The team confirms capability and scope before supply, according to the series and configuration.

Applications and operation

For economic context, IBGE records GDP of R$ 265 million for Uarini in 2023. In the 2021 gross value added breakdown, industry accounts for approximately 5% and agriculture for approximately 37.2%. Reference years differ because the 2022–2023 publication does not include a sector breakdown. These data describe the municipality; pumping requirements need to be specified for your plant’s process.

For fluids with varying properties in the process in Uarini, provide composition, temperature and viscosity ranges plus startup and cleaning conditions. Identify each product that will pass through the assembly to guide the review of materials, sealing and drive.

If the operation in Uarini uses different fluids, record composition, viscosity, temperature and solids content separately for each circuit. Compatibility with one product does not establish that the pump will serve every other plant process.

To describe the industrial application in Uarini, identify the process stage and whether the pump will transfer, circulate or feed another item of equipment. The same plant may have circuits with different fluid, flow, pressure and duty requirements.

Source: IBGE — Municipal GDP and methodology

Supply and service

Reference distance

About 2,980 km in a straight line between the factory in Cabreúva, São Paulo, and the geographic center of the municipality (IBGE centroid). It is not a road route, freight cost or lead time.

How the distance is calculated

Haversine formula, treating the Earth as a sphere with a radius of 6,371 km, between the factory’s reference coordinates (Av. Adolpho João Traldi, 80 - Jacaré, Cabreúva-SP) and the municipal centroid published by IBGE in its Geographic Mesh API, retrieved on September 24, 2026. The centroid is a reference point of the municipal territory, not the municipal seat or the delivery location. The result is rounded to multiples of 5 km; below 20 km, only “less than 20 km” is shown.

IBGE Mesh API documentation

The schedule for Uarini should distinguish equipment availability, preparation for dispatch and transport. The proposal confirms dates and responsibilities for each stage according to the requested configuration.

Before dispatch to Uarini, confirm the approved configuration, contracted documentation and delivery details with the sales team.

Send your requirements

To review the FBE / FBEI families for the project in Uarini, send the fluid and any known flow, pressure or head and temperature data. For replacement, add the installed pump’s identification and drawing. The team confirms the configuration and proposal scope.

Understand your application

Review process criteria and prepare the information for equipment selection.

From requirements to a technical proposal

Share what you already know. Additional details can be clarified with the team during review.

Fluid and process

What needs to be pumped, where it comes from and where it needs to go.

Operating conditions

Flow, pressure or head, temperature and operating schedule, when known.

Equipment and installation

Series, model, identification and space or connection constraints, if a pump is already installed.

Destination and supply

Project location, requested scope and documents required for your purchase.

FB Bombas factory in Cabreúva, São Paulo, Brazil

Direct service from the factory

FB Bombas is a Brazilian manufacturer with a history dating back to 1944. Our factory in Cabreúva, São Paulo, brings together CNC machining, assembly and a hydraulic test bench. The team reviews your application and confirms the configuration, documents and supply conditions in the proposal.

About FB Bombas

Review the documentation

Use the family documentation and application guides to prepare your request.

See the other pages for this city and for other cities. Service is provided by the factory in Cabreúva, Brazil.

Questions about our service

Information to help you prepare your inquiry to FB Bombas.

Do FBCN pumps follow ASME B73.1 dimensional compliance?

No: manual MTEC-03/00 states mechanical construction per ASME B73.1, not dimensional compliance with that standard. So, before a replacement in Uarini, interchangeability with the existing pump is checked on each model’s drawing, together with the duty point, materials and drive.

Does FB Bombas retrofit older pumps?

By replacement, not refurbishment. FB Bombas replaces the old pump with a new, complete FB pump manufactured in Cabreúva, Brazil. Before the order, engineering assesses the installation and issues a data sheet and dimensional drawing; the drawing confirms whether the existing baseplate and piping can be kept or need adaptation. FB does not refurbish other manufacturers’ pumps, sell third-party parts or reuse the installed casing. For FB pumps in service, it supplies original parts and maintenance contracts.

How long has FB Bombas been in the market?

FB Bombas began manufacturing industrial pumps in 1944. Its current factory is in Cabreúva, Brazil. The Our History page presents the company’s development; each series’ technical documentation supports equipment evaluation for your project in Uarini.

Does FB Bombas serve cities neighboring Uarini?

Service can be requested for Uarini and other destinations through the factory channels in Cabreúva, Brazil. Provide each project location and required scope to confirm supply and transport conditions. This does not represent a physical FB Bombas location in every city.

Are replacement parts available for customers in Uarini?

Yes, for FB product lines. The FBE catalogue lists replacement components such as shafts, gears, bushing sets, covers, mechanical seal, lip seal and relief valve, and the FBEI and FBME manuals include spare-parts lists for two years of operation. For delivery to Uarini, state the series, model, manufacturing number and component; compatibility, availability and lead time are confirmed in the quotation. Supply ships from the factory in Cabreúva, Brazil; the city page does not indicate local stock. Use original parts: the FBME service manual makes the operating and performance warranty conditional on original parts and FB’s consent.

What types of fluids can FB pumps handle?

It depends on the series. The catalogue for the FBE external gear pump lists oils in general, greases, asphalt, diesel oil, kerosene, paints, varnishes, resins and solvents, as well as lubrication systems and hydraulic equipment. The FBEI internal gear pump is intended for high-viscosity liquids. The FBCN and FBME handle clean or turbid liquids, and the FBOT handles organic thermal oils free of abrasive particles and of substances that chemically attack the pump. For the process in Uarini, state the composition, temperature, viscosity and solids content; fluids with suspended solids must be assessed by FB engineering.

How can pump delivery to Uarini be planned?

The proposal should define availability, dispatch, transport, packaging and responsibilities for delivery to Uarini. State access, unloading and receiving restrictions. Route, mode and timing are confirmed for the supply; a reference distance is not a road route or delivery time.

Are FB pumps delivered to Uarini with a traceable Data Book?

When the Data Book is part of the purchase scope. State which drawings, manuals, certificates and test reports are required for Uarini; the proposal confirms the documents applicable to the supplied series and configuration. The same Data Book is not assumed for every pump.

How can I check whether a pump purchase for Uarini can use BNDES Finame?

Following the BNDES steps, first check whether the equipment appears on the list of items eligible for BNDES Finame financing, in the CFI Catalog on the bank’s website; for that check, ask the sales team for the identification of the model quoted for Uarini. Then apply for financing through an accredited financial agent, such as a commercial bank, development bank, development agency or credit union. The agent reviews the request and, if it approves the operation, forwards it to BNDES, which evaluates the request and authorizes the financing. Being a Brazilian manufacturer does not, on its own, show that the equipment is accredited.

Where can I find installation, operation and maintenance instructions for FB pumps?

It depends on the series. Installation and operation instructions are in FBEI manual MAN001-10 and in FBME service manual MSERV-08/01, which also covers maintenance and recommends FB-authorized supervision during installation. The FBE (MTEC-01/01), FBCN (MTEC-03/00) and FBOT (MTEC-16/00) technical manuals provide technical data, sectional drawings, parts lists and dimensions; for installing and maintaining these series, the published services include on-site start-up and commissioning and maintenance contracts. The manuals are on the website’s technical manuals page (PDFs in Portuguese), and MSERV-08/01 is on the FBME series page. For the operation in Uarini, identify the series and model from the pump’s nameplate.

Tell us about your project

Send your application to our factory team. You do not need every parameter defined to start the conversation.

What happens next

The team reviews the information and confirms the details needed for a proposal. Configuration, availability, documentation, transport and lead time depend on the requested scope.

Your industrial requirements

Describe the fluid, application and project destination. Include the model and technical data you already have.

Your contact detailsEnter your contact details so we can get back to you.

A CNPJ is only required for companies in Brazil.

Include the area code. No need to repeat +55.

How can we help?Tell us about the application, your question or what needs to change in your operation.

0 / 1000 characters

Reply after we review your request